40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 344  Not logged in ELOG logo
Entry  Wed Jan 30 11:49:30 2008, Alberto, Summary, Electronics, RF monitor's filters final schematics and transfer functions 8x
Entry  Wed Feb 13 11:41:00 2008, Alberto, Update, Electronics, Some characterization of the RF Monitor Box (StocMon) CircuitCharacterization.pngalberto.spectrum3.png
Entry  Mon Feb 18 12:04:39 2008, Alberto, Update, Electronics, RF Monitor (StocMon) DSC_0443.JPG
    Reply  Fri Feb 22 08:29:07 2008, Alberto, Update, Electronics, RF Monitor (StocMon) 
    Reply  Fri Feb 22 08:33:18 2008, Alberto, Update, Electronics, RF Monitor (StocMon) 
Entry  Thu Jun 19 15:52:06 2008, Alberto, Configuration, Computers, Measure of the current absorbed by the new Megatron Computer 
Entry  Mon Jun 23 21:51:19 2008, Alberto, Update, General, Arm Cavity Length Measurement 40mLengthMeasure.pdf
Entry  Wed Jul 2 06:46:05 2008, Alberto, Configuration, General, NPRO on to warm up 
Entry  Wed Jul 2 19:15:52 2008, Alberto, Update, General, Status of the alignment of the NPRO beam for the Absolute Length Measurement DSC_0156.JPGDSC_0158.JPG
Entry  Thu Jul 3 18:48:09 2008, Alberto, Update, General, Beats of the two lasers in the absolute length measurement observed  
    Reply  Mon Jul 7 11:22:02 2008, Alberto, Update, General, Beats of the two lasers in the absolute length measurement observed  
Entry  Mon Jul 7 19:15:38 2008, Alberto, Update, General, Optics alignement on the ABS length experiment 
Entry  Thu Jul 10 19:12:07 2008, Alberto, Update, General, abs cavity length measurement experiment 
Entry  Mon Jul 14 19:15:43 2008, Alberto, Update, General, abs cavity length measurement experiment 
    Reply  Mon Jul 14 21:34:10 2008, Alberto, Update, General, abs cavity length measurement experiment 
Entry  Wed Jul 16 16:59:07 2008, Alberto, Update, General, Aligment 
Entry  Wed Jul 23 16:31:02 2008, Alberto, Configuration, Computers, Megatron connected 
    Reply  Wed Jul 23 17:19:48 2008, Alberto, Configuration, Computers, Megatron connected 
Entry  Tue Aug 5 10:56:05 2008, Alberto, Configuration, General, ITMX chamber opened and mirror released 
Entry  Tue Aug 5 17:56:23 2008, Alberto, Configuration, General, SRM and PRM inspection IMG_1434.JPGIMG_1456.JPG
Entry  Wed Aug 6 19:01:15 2008, Alberto, Update, General, ITMX and SRM OSEM post-earthquake diagnostic 
Entry  Wed Sep 3 18:45:01 2008, Alberto, Configuration, , PD3 gain 
Entry  Wed Sep 10 19:53:53 2008, Alberto, Update, General, abs length experiment 
Entry  Fri Sep 12 11:09:20 2008, Alberto, Update, General, abs cavity length experiment 
Entry  Sat Sep 13 23:13:01 2008, Alberto, Update, General, abs cavity length experiment 
Entry  Sun Sep 14 18:30:32 2008, Alberto, Update, General, ABSL: measured X arm 
    Reply  Sun Sep 14 19:29:07 2008, Alberto, Update, General, ABSL: measured X arm 
Entry  Wed Sep 17 13:58:36 2008, Alberto, Update, General, ABSL: results from the X arm Sept17_XarmFSRmeasurement_report.ps
Entry  Wed Sep 17 19:13:47 2008, Alberto, Update, General, ABSL: status 
Entry  Mon Sep 22 20:00:35 2008, Alberto, Update, General, ABSL: running measurement 
Entry  Wed Sep 24 17:57:04 2008, Alberto, Update, General, ABSL: FSS Slow Actuator Control 
Entry  Wed Oct 1 12:05:58 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler 
    Reply  Wed Oct 1 12:09:25 2008, Alberto, Configuration, Computers, "StochMon" added to the Alarm Handler 
Entry  Fri Oct 3 12:15:21 2008, Alberto, Configuration, IOO, C1iool0 rebooted 
Entry  Mon Oct 6 12:45:41 2008, Alberto, DAQ, LSC, C1LSC in coma 
    Reply  Mon Oct 6 16:41:33 2008, Alberto, DAQ, LSC, C1LSC in coma 
Entry  Tue Oct 7 10:49:29 2008, Alberto, Update, General, Displaced Photodiode 
Entry  Tue Oct 7 12:17:57 2008, Alberto, Configuration, Computers, Time reset on MEDM 
    Reply  Fri Oct 10 10:20:42 2008, Alberto, Omnistructure, Computers, FEs are down 
Entry  Fri Oct 10 13:57:33 2008, Alberto, Omnistructure, Computers, Problems in locking the X arm 
Entry  Wed Oct 22 09:42:41 2008, Alberto, DAQ, Computers, c1iool0 rebooted and MC autolocker restarted 
Entry  Wed Oct 22 20:50:30 2008, Alberto, Omnistructure, Computers, GPS 
Entry  Thu Oct 23 15:27:19 2008, Alberto, Update, General, Abs length TRX_aplot_03_04_05_together.png
    Reply  Thu Oct 23 18:23:47 2008, Alberto, Update, General, Abs length TRX_plot_06_07_08_together.png
    Reply  Thu Oct 23 18:27:04 2008, Alberto, Update, General, Abs length HOM_Frequencies.m
Entry  Thu Oct 23 18:45:18 2008, Alberto, Omnistructure, Computer Scripts / Programs, Python code for GPIB devices developed for the Absl length experiment HP8590.pysweepfrequency.py
Entry  Thu Oct 23 18:51:19 2008, Alberto, Metaphysics, Computers, eLog 
Entry  Fri Oct 24 11:42:48 2008, Alberto, Update, General, Abs length: locking the X arm cavity in TEM01/10 TRX_armTEM00-plot_09-10_together.png
Entry  Fri Oct 24 17:21:13 2008, Alberto, Update, General, Abs length: the right amount of beam clipping 24OCT08_levels_of_clipping_comparison.png
Entry  Fri Oct 24 18:05:01 2008, Alberto, Update, General, Abs length: transverse mode spacing measured for the X arm 24OCT08_TEM10-01_comparison(file12-14).png
ELOG V3.1.3-