40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 355  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject
  3496   Tue Aug 31 14:47:53 2010 steveConfigurationPEMtoilet upgrade

Our toilets were replaced by a green Gerber 1.6 gpf ( 6 lpf ) last week.

Attachment 1: toil-n.JPG
toil-n.JPG
  3505   Wed Sep 1 10:54:15 2010 steveUpdatePEM more crane balancing

Crane balancing at the south end is continuing today.

  3513   Thu Sep 2 14:11:17 2010 steveSummaryPEMsouth end crane balancing is completed

The crane I -beam now leveled at all degrees of rotation.  The lower hinge was moved southward  about 1/4 of an inch.  Performance was tested at 2000 lbs

 

Atm1, work in progress

Atm2, load test at 1 Ton

Atm3, service report

Attachment 1: P1060798.JPG
P1060798.JPG
Attachment 2: P1060800.JPG
P1060800.JPG
Attachment 3: P1060804.JPG
P1060804.JPG
  3514   Thu Sep 2 16:41:32 2010 steveConfigurationSAFETYlaser is ON: safety glasses required!

I hooked up interlock to the Innolight 2W 1064 nm in the enclosure. The manual shutter  is closed on this unit.

SAFETY GLASSES REQUIRED !

  3547   Wed Sep 8 16:17:58 2010 steveUpdatePEMparticle counter problem

I played with the particle counter this morning. Now it's running and reading the correct numbers on the old COCHECKLIST.adl medm screen.

However, it can not be seen with dataviewer.

Koji just rebooted the frame builder and the problem was solved.

  3549   Thu Sep 9 08:23:45 2010 steveUpdateSAFETYmain laser turned off

Innolight 2W 1064nm main laser was turned off for more enclosure related work.

The electrician re rooting the power- conduit to the interlock under the floor and bring it through the new concrete tunnel.

Emergency laser power shut off switch was tested at entry door 104M.  It worked fine.

 

No laser glasses required. Laser will be turned back on around 11 am today.

  3550   Thu Sep 9 11:17:15 2010 steveUpdateSAFETYmain laser is back ON

Quote:

Innolight 2W 1064nm main laser was turned off for more enclosure related work.

The electrician re rooting the power- conduit to the interlock under the floor and bring it through the new concrete tunnel.

Emergency laser power shut off switch was tested at entry door 104M.  It worked fine.

 

No laser glasses required. Laser will be turned back on around 11 am today.

Atm1,   AC power line to enclosure and interlock  was extended.

Atm2,   24V line to interlock rerouted

Atm3,   job is completed

 

SAFETY GLASSES REQUIRED !  SAFETY GLASSES REQUIRED!

 

 The laser is turned on. Injection current set to 0.871A.

Actually some one turned the  laser  off last night and did  not enter it into the elog ! Burned toast award is granted !

Please  come forward voluntarily.

Attachment 1: P1060813.JPG
P1060813.JPG
Attachment 2: P1060814.JPG
P1060814.JPG
Attachment 3: P1060816.JPG
P1060816.JPG
  3551   Thu Sep 9 11:31:54 2010 steveUpdatePEMaccelerometer cable connection

I turned off/on the power to the accelerometers in order to re rout their connections. I found cable connector body-nut  #3 loose to Accelerometer 2X This connector should be checked for solid performance.

  3585   Fri Sep 17 17:35:35 2010 steveUpdatePEMcleaned up at 1Y1 PSL rack

Cleaned up cables on the top and bottom. Vacuumed both areas. We still have some remaining shading from the MOPA umbilical and more unknown BNC cables hanging around.

  3591   Mon Sep 20 17:10:10 2010 steveConfigurationPSL enclosure beam guides to IFO are installed

The PSL out  2" OD beam guide tube was cut  1.5" shorter to 13.5"

The 10" OD  0.25" wall Al tube was replaced by a  lighter, not anodized and thinner  wall 0.094" tube of 15.5" lenght, that is 0.75" shorter.

The new position of the PSL table made these cuts necessary.

  3592   Tue Sep 21 15:33:02 2010 steveMetaphysicsTreasureWagonga alart

John Miller has arrived from Australia with 3 bags of  Wagonga Coffee. Trade bargaining has started on

250 mgs of Sumatran Mandehling, Timur and Papua New Guine.

Attachment 1: P1060866.JPG
P1060866.JPG
Attachment 2: P1060872.JPG
P1060872.JPG
  3605   Fri Sep 24 16:31:35 2010 steveConfigurationGeneralopen frame- rack is moved

The squeezing open frame rack was moved from the south side of the PSL enclosure to the north side of the SP table.

AC power breaker is PC-2  #1

 

Attachment 1: P1060881.JPG
P1060881.JPG
  3611   Mon Sep 27 08:59:50 2010 steveConfigurationVACslow vent has started

Blocked PSL output beam  into IFO

Checked: HV at IOO & OMC are off, jam nuts in position,

Closed V1 and VM3, opened VV1 to N2 regulator

We are venting at 1 Torr/min rate

  3616   Tue Sep 28 14:12:14 2010 steveUpdateGeneralvertex crane drive is out of order

The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.

I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.

The crane is tagged out again and the controller box is cooling down.

  3624   Thu Sep 30 09:34:58 2010 steveUpdateGeneralvertex crane trolly drive fixed

Quote:

The vertex crane drive is overheating, it stopped functioning. Service man will be here tomorrow morning.

I crane was just turned  on for for may be  about 5 minutes. The vertical drive was fine for a while, but the horizontal did not worked at all.

The crane is tagged out again and the controller box is cooling down.

 Atm1, Vertex crane controller unit on horizontal I-beam.

            Module CCES-407 1HP 2.3A 460V/3 phase on the right was replaced. Speed was increased  to 30 Hz

Atm2, See burned insulation on black wire that was shorting to the large suppressor resistor on Atm3 One can see the pit marks on the right end of it.

        This large power dissipater resistor got hot as the malfunctioning controller 407 broke down.   Touching black power wire insulation melted and made a short.

          So the heat was created and finally the fuses were blown. The unnecessary large fuses were replaced by small ones.

Fortunately we had one spare controller on hand that made this repair to be done fast.

We used the new Crane Safety Check list  from LIGO-E1000379-v1 the first time yesterday before doors were removed.

Attachment 1: P1060891.JPG
P1060891.JPG
Attachment 2: P1060887.JPG
P1060887.JPG
Attachment 3: P1060889.JPG
P1060889.JPG
Attachment 4: P1060893.JPG
P1060893.JPG
  3626   Thu Sep 30 13:43:29 2010 steveUpdateSAFETYpropane gas smell in control room

The control room's north west corner smelled like propane gas  yesterday around 16:30

We all agreed that the smell was real and I called the safety office. I was told that they received 6 other calls from different parts of the campus.

The smell disappeared in about a half an hour.

  3637   Fri Oct 1 16:46:20 2010 steveBureaucracySAFETYYuta received 40m-101-safety training

Our visiting graduate student Yuta Michimura received 40m specific basic safety training today.

  3646   Tue Oct 5 09:26:04 2010 steveConfigurationPEMmoved accelerometers

Accelerometers xyz were moved from IOO-south/west  corner to under PSL table. They were turned off for ~20 minutes.

Guralp was also moved eastward about 2 ft. It is not leveled.

This is part of the preparation to remove access connector.

  3654   Tue Oct 5 17:39:21 2010 steveConfigurationVACwest access connector removed

Kiwamu, Koji, Yutah, Rana, Jan and Steve

We removed the west access connector this afternoon.

  3664   Thu Oct 7 08:39:39 2010 steveBureaucracySAFETYJoonho receives safety training

Our new undergrad Joonho Lee received 40m specific basic safety training yesterday.

Yuta and Joonho are scheduled to participate in the LIGO-laser safety tutelage with Peter K on Oct 12

  3670   Thu Oct 7 15:21:51 2010 steveUpdatePSLRF filter for PMC

We got two small RF filter for the PMC from Valera  They are made by http://www.larkengineering.com/   "MC35.5-3-AB" sma, 29300-01

Attachment 1: 35.5MHZ.pdf
35.5MHZ.pdf
  3676   Fri Oct 8 07:41:42 2010 steveConfigurationSAFETY2W laser shutter is closed

The 2 W Innolight shutter is closed and enclosure door removed. Beam path blocked. Do not change this condition.

  3677   Fri Oct 8 10:38:03 2010 steveConfigurationSAFETY2W laser shutter is closed

Quote:

The 2 W Innolight shutter is closed and enclosure door removed. Beam path blocked. Do not change this condition.

The PSL output beam guide was upgraded from 2" to 8" OD . It is green ready. Shutter is open.

Attachment 1: P1060905.JPG
P1060905.JPG
Attachment 2: P1060910.JPG
P1060910.JPG
  3682   Fri Oct 8 17:36:16 2010 steveFrogsPhotosvisiting undergrads

Prof Alan Weistein guided the 24 student through the 40m. His performance was rated as  an enthusiastic 9.5

Attachment 1: P1060916.JPG
P1060916.JPG
Attachment 2: P1060921.JPG
P1060921.JPG
Attachment 3: P1060922.JPG
P1060922.JPG
Attachment 4: P1060915.JPG
P1060915.JPG
  3688   Mon Oct 11 10:51:36 2010 steveUpdateSUSOSEMs, OSEMs, OSEMs...those lovely little OSEMs
Attachment 1: 40dll.jpg
40dll.jpg
  3698   Tue Oct 12 16:35:17 2010 steveConfigurationPSLPSL output monitor in place

Innolight PSL laser is set to @2.1A , ~1.6W output ! Please scan out when finished! 

The output monitoring pick up window W2-LW-2-2050-UV-1064-45S is in place. IOO_ANG_OPD and IOO_POS_QPD roughly aligned.

The PMC alignment and/ or mode matching is bad. PMC reflected is 50%, throughput 600mW

Remember to block PSL output ! into IFO

 

  3733   Mon Oct 18 09:01:48 2010 steveHowToGeneralHow not to

This BNC cable is crying for help. Please do not do this to me.  It should be reported  to the  abused center.Throw this cable into the garbage now.

Attachment 1: P1060926.JPG
P1060926.JPG
  3745   Wed Oct 20 16:41:41 2010 steveOmnistructureGeneral laser chiller leaving for MIT
Attachment 1: P1060929.JPG
P1060929.JPG
  3751   Thu Oct 21 10:44:56 2010 steveMetaphysicsTreasure1987 supernova tapes plus....?

I'm cleaning out to make room for our new optical cabinet. Are we keeping these? There are  ~20  pieces of 10" od 1" wide tapes and large number of cassettes.

AJW,  Zucker,  Stuart A and Koji were notified in this matter.

Alan suggested to save data of Bruce Allen paper of observation of binary neutron stars in the 40m on 1994 November 14-20 and save back up tapes of his period in the 40m.

Mike: reels are not readable any more, it is time to let go

Attachment 1: P1060932.JPG
P1060932.JPG
  3792   Wed Oct 27 09:02:29 2010 steveUpdateElectronicsHP4195A is NOT fixed

www.avalontest.com has fixed the 25MHz oscillation.  Contact: Jim Burnham 760-536-0191

Actually, NOT FIXED.

  3808   Thu Oct 28 09:16:17 2010 steveUpdatePEMwelding in the vertex area

Fire-smoke sensors in the vertex area #2-31, 2-30 east, 2-32 south/MC2 and 2-37 old control room area are turned off to accommodate the welding

activity of folding crane. These sensors will be reactivated at 3:30pm today.

Stay out of the 40m lab: IFO room till 6 pm today.

  3810   Thu Oct 28 13:01:34 2010 steveUpdatePEMcrane repair guys left for the day

Quote:

Fire-smoke sensors in the vertex area #2-31, 2-30 east, 2-32 south/MC2 and 2-37 old control room area are turned off to accommodate the welding

activity of folding crane. These sensors will be reactivated at 3:30pm today.

Stay out of the 40m lab: IFO room till 6 pm today.

 The new cord wheel was to big. They be back tomorrow?

The lab is open.

  3832   Mon Nov 1 10:17:55 2010 steveUpdateGeneralbreakers relabelled

Pedro of the electrical shop helped to retrace wires from the racks to the breakers. Many wrong labels were replaced. These labels are  still representing                          the south arm as Y and  the east arm as X.

Racks: 1X1,2,3,4 and 1Y3,4,5,6,7 and 9 are connected through manual disconnect swithes to  AC power breaker PC-1 on the west wall of IFO room 104.

             This panel PC-1 is connected to T1 isolation transformer in room 101 Panel L - # 38, 40, 42

Racks: 1Y1 & 2  psl and mc are connected through manual disconnect switches to AC power breaker PC-2 just west of the psl enclosure.

             This panel is connected to T2 isolation transformer in room 101 Panel L - # 32, 34, 36

Attachment 1: P1060970.JPG
P1060970.JPG
Attachment 2: P1060972.JPG
P1060972.JPG
Attachment 3: P1060975.JPG
P1060975.JPG
  3833   Mon Nov 1 10:28:41 2010 steveBureaucracySAFETYSuresh received 40m safety training

Our new postdoc Suresh Doravari received 40m specific safety training last week.

  3854   Wed Nov 3 16:49:31 2010 steveUpdateGeneralstorage cabinet is in place

The south end of IFO room 104 was reshuffled. The flow bench was moved all the way to the south end to create more room for the crane reach. The old  large drawing cabinet  was moved under the vacuum tube.

The new clear view through  Acrylic-plexyglass cabinet is anchored. It has powder finished coating so it will not out-gas too much.The back side shelf mounting holes are sealed off with kapton tape. The doors still needs some gaskit seals.

Attachment 1: P1070018.JPG
P1070018.JPG
  3862   Thu Nov 4 17:24:49 2010 steveUpdateGeneralconflat flanges for MIT

8 pieces of 10" CF blanks were shipped to MIT

Attachment 1: P1070020.JPG
P1070020.JPG
  3864   Thu Nov 4 17:57:27 2010 steveUpdateGeneralBeamScanner is working again

Koji, Suresh and Steve,

The beam scanner is back from repair.  Koji and Suresh helped to move the I/O address jumpers on the interface card from default position  300 to 320

It is working again.

Attachment 1: P1070024.JPG
P1070024.JPG
  3867   Fri Nov 5 09:08:14 2010 steveUpdateSUSepoxy

Physical Electronics: Vac-Seal #288-6000 arriving Monday. Our last bag used last week had a p/n 1002003 with expiration date   .....2009 ? and it was stored in the

refrigerator all times. We are getting 68 small bags.

We should have precision gluing notes of epoxies/procedures used on our sus upgrade.

Attachment 1: 11081001.PDF
11081001.PDF
  3894   Thu Nov 11 11:08:26 2010 steveBureaucracyPEMAP table found open

Please remember to cover the optical tables !

  4059   Wed Dec 15 16:04:49 2010 steveConfigurationVACvacuum valves found in default condition

This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration so one has to pay attention that the foreline valves are open.

Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.

  4077   Mon Dec 20 16:57:58 2010 steveUpdateIOOchecking out & closing the vacuum chambers
  • Check EQ-stops
  • clamp down counter weights
  • check other components are clamped
  • remove all tools
  • check cabling is not is not shorting out seismic stack or blocking beam
  • confirm well centered spots on mirrors
  4083   Tue Dec 21 16:20:09 2010 steveConfigurationVACpumpdown has started

Slow pumpdown of rebuilt IFO-mark4 started at 3pm today.

We are at 680Torr at this minute with 1.5 Torr/min speed.

  4089   Wed Dec 22 17:24:50 2010 steveConfigurationVACslow pumpdown at 12 hours

We have reached 200 Torr at 12 hours of slow pumping speed. Kiwamu stopped the pumping for 11 hrs last night .and I restarted it this morning.

Now RV1 is fully open with butterfly valve in place  and the second roughing  pump RP3 was just turned on.

 

How to stop pumping:

1,  close RV1 manual valve with torque wheel

2, close V3

3, turn off roughing pumps RP1 & RP3

4, disconnect metal hose connection to butterfly valve

Attachment 1: slowpd12h.jpg
slowpd12h.jpg
  4094   Thu Dec 23 13:30:09 2010 steveConfigurationVACslow pumpdown complete

The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr

The Maglev monitoring MEDM screen "Rotating" indicator is not working. It is on all times. Please look at Maglev controller monitor for real information.

Pump down is completed.           

Configuration: vacuum normal after 86 days at atm               CC1 = 1e-5 Torr                  

                      IFO is hungry for light (and maybe some goulash with a little paprikash too)

Attachment 1: slow2dpd.jpg
slow2dpd.jpg
  4125   Fri Jan 7 15:17:37 2011 steveUpdateCamerasITMX video monitor has tower wide view

The Watec 902, 1/2" CCD camera got new Tamron lens: 1/2" 10-40mm F/1.4  manual iris. IR corrective lens. It is designed to have the same focal point in the IR as

in the visible light range. However, as the depth of field in the IR range is very narrow, focus adjustment should be done carefully in the IR.

Now you can see the sus tower that will make alignment easier.

 

  4133   Tue Jan 11 11:39:45 2011 steveUpdateVACRGA is turned on

Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.

TP2 dry fore pump was replaced at 910mTorr

Attachment 1: pd70d22.jpg
pd70d22.jpg
  4165   Tue Jan 18 10:25:23 2011 steveUpdatePEMvertex crane work this week

The crane people are here. The Vertex chambers are covered with plastic. The PSL HEPAs will be running on high during the day.

It is going to be disturbingly noisy and dirty during the day. Please try start working in the evening if it can not wait till next week.

  4233   Mon Jan 31 16:12:11 2011 steveUpdateVACVertex crane upgrade shorth coming

 The upgrade is almost finished. I found that the passive latch lock  is not closing down all the way. It has about a 3/8" gap.    See Atm. 1 & 2

The service man was here this morning and agreed to fix it.  They will be back next week. The latch needs an other spring to push it into full lock. 

We tested all possible sequences of operation of the new upgrade. It performed to specification.

 

 

Quote:

 

Attachment 1: P1070364.JPG
P1070364.JPG
Attachment 2: P1070358.JPG
P1070358.JPG
  4264   Wed Feb 9 10:25:46 2011 steveUpdateSAFETYAP table

I blocked the  AP table's south west 10" ID port since it is obsolete with the new layout.

Reminder: items on the enclosure self can fall down in an earthquake. I moved oscilloscope and heavy calorimeter head from the edge of the cliff.

Attachment 1: P1070395.JPG
P1070395.JPG
  4269   Thu Feb 10 11:16:31 2011 steveUpdatePEMsouth arm AC turned on

The air condition was off for the south arm. I  turned it on.

ELOG V3.1.3-