40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 341  Not logged in ELOG logo
   +  Reply  Mon Nov 9 14:53:47 2009, Alberto, Omnistructure, Environment, Tidying up BNC cables rack around the lab 
   +  Reply  Mon Nov 9 15:11:02 2009, Alberto, Update, LSC, Everything put back as it was 
Entry  Mon Nov 9 16:32:36 2009, Alberto, Frogs, Environment, Shot of the white board yesterday before erasing DSC_0980.JPGDSC_0980.JPG
Entry  Mon Nov 9 18:27:30 2009, Alberto, Frogs, Computers, OMC DCPD Interface Box Disconnected from the power Supply 
   +  Reply  Tue Nov 10 13:02:36 2009, Alberto, Update, LSC, X and Y Arm Cavity Poles Measurement SummaryOfFits.pdfCodeAndData.tar
Entry  Tue Nov 10 17:01:33 2009, Alberto, Configuration, IOO, c1ioovme and c1iool0 rebooted  
Entry  Tue Nov 10 17:49:20 2009, Alberto, Metaphysics, Computers, Test Point Number Mapping 
Entry  Tue Nov 10 19:19:57 2009, Alberto, Update, ABSL, Rotated polarizer on the PSL table, along the MC input pick off beam  
Entry  Tue Nov 10 19:21:53 2009, Alberto, Update, ABSL, PLL Alignment 
Entry  Wed Nov 11 12:29:44 2009, Alberto, Frogs, PSL, MC Locked on the wrong mode? PB110184-1.JPG
Entry  Wed Nov 11 15:04:52 2009, Alberto, Update, ABSL, Working on the AP table 
   +  Reply  Wed Nov 11 16:18:57 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Thu Nov 12 10:45:02 2009, Alberto, Update, PSL, Abandoned Frequency Generator 
Entry  Thu Nov 12 10:45:36 2009, Alberto, Update, ABSL, Working on the AP table 
   +  Reply  Thu Nov 12 11:34:38 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Thu Nov 12 12:50:35 2009, Alberto, Update, Computers, StochMon calibrated channels added to the data trend 
   +  Reply  Thu Nov 12 12:51:45 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Thu Nov 12 16:13:05 2009, Alberto, Update, PSL, MC Trans Offset 
   +  Reply  Thu Nov 12 16:53:59 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Thu Nov 12 18:10:27 2009, Alberto, Update, ABSL, PLL Locked 
Entry  Sun Nov 15 18:42:10 2009, Alberto, Update, Locking, Interferometer fully locked for 3331 seconds 
Entry  Thu Nov 19 16:04:48 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
   +  Reply  Thu Nov 19 18:49:55 2009, Alberto, Configuration, elog, Elog debugging output - Down time programmed today to make changes 
Entry  Fri Nov 20 13:54:45 2009, Alberto, Omnistructure, Environment, New Paper and Cardboard Recycling Bins Introduced to the 40m DSC_1030.JPGDSC_1031.JPG
Entry  Tue Nov 24 14:33:22 2009, Alberto, Update, ABSL, working on the AP table 
   +  Reply  Tue Nov 24 19:16:02 2009, Alberto, Update, ABSL, working on the AP table 
Entry  Wed Nov 25 08:43:08 2009, Alberto, Update, ABSL, Working on the AP table 
Entry  Wed Nov 25 10:20:47 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 
   +  Reply  Wed Nov 25 11:02:54 2009, Alberto, Update, ABSL, AbsL PLL not able to lock 
   +  Reply  Wed Nov 25 15:42:27 2009, Alberto, Update, ABSL, Working on the AP table 
   +  Reply  Wed Nov 25 20:14:58 2009, Alberto, Update, ABSL, AbsL PLL not able to lock: problem fixed 
Entry  Wed Nov 25 20:24:49 2009, Alberto, Update, ABSL, PLL Open Loop Gain Measured 2009-09-25_OLgain_g3png.png2009-09-25_OLgain_g6png.png
Entry  Wed Nov 25 20:28:17 2009, Alberto, Update, ABSL, Stopped working on the AbsL 
   +  Reply  Mon Nov 30 10:28:47 2009, Alberto, AoG, all down cond., sea of red 
   +  Reply  Mon Nov 30 11:29:40 2009, Alberto, AoG, all down cond., sea of red 
Entry  Thu Dec 3 15:55:24 2009, Alberto, AoG, LSC, RF AM Stabilizer Output Power 
Entry  Tue Dec 8 10:20:33 2009, Alberto, DAQ, Computers, Bootfest succesfully completed 
Entry  Thu Dec 10 08:40:12 2009, Alberto, Update, Computers, Fronte-ends down 
   +  Reply  Thu Dec 10 08:50:33 2009, Alberto, Update, Computers, Fronte-ends down 
Entry  Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
Entry  Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired 
   +  Reply  Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
   +  Reply  Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
   +  Reply  Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started 
   +  Reply  Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected 
   +  Reply  Mon Dec 14 14:16:14 2009, Alberto, Update, Treasure, LOCKSTARS 
Entry  Mon Dec 14 19:33:04 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week XarmTF01_fit.pdfYarmTF01_fit.pdfArmCavityFinesseMeasurment.tar.gz
   +  Reply  Tue Dec 15 05:29:31 2009, Alberto, Update, General, Arm Cavity Poles measured again after cleaning the optics last week 
Entry  Tue Dec 15 21:39:34 2009, Alberto, Update, ABSL, brief summary of this afternoon's measurements 
Entry  Wed Dec 16 11:21:20 2009, Alberto, Update, ABSL, Universal PDH Box Servo Filters NewandOlfFilterTF.pngNewandOlfFilterTF.png
ELOG V3.1.3-