40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 334 of 357  Not logged in ELOG logo
Entry  Tue Jul 1 11:57:24 2008, Yoichi, Configuration, PSL, MZ servo switch problem again 
Entry  Tue Jul 1 12:08:38 2008, John, Joe, Configuration, PSL, PMC input PD 
    Reply  Tue Jul 1 16:48:42 2008, rob, john, Configuration, PSL, MZ servo switch problem resolved forever 
Entry  Wed Jul 2 06:46:05 2008, Alberto, Configuration, General, NPRO on to warm up 
Entry  Thu Jul 3 13:54:26 2008, rob, Configuration, Computers, mDV on rosalba 
Entry  Tue Jul 8 21:46:38 2008, Yoichi, Configuration, PSL, GC650M moved to the PMC transmission 
Entry  Wed Jul 16 15:59:04 2008, josephb, Eric, Configuration, Cameras, PMC trans camera path 
Entry  Wed Jul 16 16:28:14 2008, josephb, Configuration, Computers, Fixed IP address on Switch 
Entry  Fri Jul 18 12:24:15 2008, josephb, Eric, Configuration, Cameras, Changed Lenses on GC750 at ETMX 
Entry  Mon Jul 21 19:55:16 2008, rana,jenne, Configuration, IOO, Noise in MC_F SCRN0024.GIF
Entry  Wed Jul 23 01:42:26 2008, rana, Configuration, PSL, FSS RFPD: Examined, "repaired", and re-installed Untitled.pdf
Entry  Wed Jul 23 16:31:02 2008, Alberto, Configuration, Computers, Megatron connected 
    Reply  Wed Jul 23 17:19:48 2008, Alberto, Configuration, Computers, Megatron connected 
Entry  Wed Jul 23 21:48:30 2008, rob, Configuration, General, restore IFO when you're done with it 
    Reply  Thu Jul 24 01:04:01 2008, rob, Configuration, LSC, IFR2023A (aka MARCONI) settings 
Entry  Thu Jul 24 19:29:26 2008, Yoichi, Configuration, PSL, C1:PSL-STAT_FSS_NOM_C_GAIN is changed from 30 to -0.7 
Entry  Sun Jul 27 20:25:49 2008, rana, Configuration, Environment, Office Temperature increased to 75 F 
Entry  Sun Jul 27 20:49:21 2008, rana, Configuration, Computers, NTP 
Entry  Mon Jul 28 23:41:07 2008, rob, Configuration, PSL, FSS/MC gains twiddled 
Entry  Tue Jul 29 01:03:17 2008, rob, Configuration, IOO, MC length measurement 
    Reply  Tue Jul 29 09:12:43 2008, Koji, Configuration, IOO, MC length measurement 
Entry  Wed Jul 30 13:09:40 2008, josephb, Eric, Configuration, PSL, PMC scan experiment 
Entry  Wed Jul 30 18:45:01 2008, rana, Configuration, SUS, New SUS Drift Technology 
Entry  Thu Jul 31 16:11:22 2008, josephb, Configuration, Computers, Matlab on Megatron 
Entry  Fri Aug 1 01:13:32 2008, rana, Configuration, PSL, PSL Quad change and new script 
Entry  Fri Aug 1 10:45:46 2008, josephb, Configuration, Computers, Megatron now running tcsh 
    Reply  Fri Aug 1 16:33:52 2008, rana, Configuration, PSL, PSL Quad change and new script Untitled.png
Entry  Sat Aug 2 13:07:23 2008, Koji, Configuration, General, The AP table cleaned 
Entry  Sat Aug 2 16:05:38 2008, rana, Configuration, Computer Scripts / Programs, mDV update 
Entry  Sun Aug 3 20:53:54 2008, rana, Configuration, PEM, Guralp 
Entry  Mon Aug 4 12:12:20 2008, steve, Configuration, VAC, the ifo is at atm vent3h.jpgUntitled.png
Entry  Mon Aug 4 16:20:20 2008, Dmass, Configuration, Photos, ITMX magnet position relative to OSEMS DSC_0151.JPGDSC_0150.JPG
Entry  Tue Aug 5 02:39:55 2008, Koji, Configuration, General, Abs. Len. Meas. ~ Optical Layout on the AP / PSL table 2008-Aug-05 optical_layout_ap_table3.pngoptical_layout_ap_table3.pdfoptical_layout_PSL_table1.pngoptical_layout_PSL_table1.pdf
Entry  Tue Aug 5 10:56:05 2008, Alberto, Configuration, General, ITMX chamber opened and mirror released 
Entry  Tue Aug 5 17:56:23 2008, Alberto, Configuration, General, SRM and PRM inspection IMG_1434.JPGIMG_1456.JPG
Entry  Thu Aug 7 11:54:26 2008, josephb, Configuration, Cameras, New code + gstreamer allows for easy saving and compression of images testVideo.ogm
Entry  Fri Aug 8 10:58:05 2008, josephb, Configuration, Cameras, Cameras and gstreamer 
Entry  Fri Aug 8 12:21:57 2008, josephb, Configuration, Computers, Switched X end ethernet connections over to new switch 
Entry  Mon Aug 11 11:36:11 2008, josephb, Steve, Configuration, Computers, c1susvme1 minor problems 
Entry  Mon Aug 11 12:42:04 2008, josephb, Configuration, Computers, Continuing saga of c1susvme1 
Entry  Mon Aug 11 13:59:23 2008, josephb, Configuration, Computers,  
Entry  Mon Aug 11 15:07:49 2008, josephb, Configuration, Computers, Procyon aka fb40m switched to new switch 
Entry  Tue Aug 12 12:21:13 2008, josephb, Configuration, Cameras, Variation in fit over 140 images for GC650 and GC750 
Entry  Wed Aug 13 17:00:59 2008, steve, Configuration, SUS, BS sat amp removed 
Entry  Thu Aug 14 19:08:14 2008, Yoichi, Configuration, SUS, Free swing measurement going on 
Entry  Fri Aug 15 11:52:32 2008, josephb, Configuration, Cameras, Multi-computer display and recording of digital camera output 
Entry  Fri Aug 15 19:32:49 2008, steve, Configuration, VAC, pumpdown complete pdprm.jpg
Entry  Mon Aug 18 08:07:10 2008, Yoichi, Configuration, SUS, Suspension free swinging 
Entry  Mon Aug 18 15:32:18 2008, josephb, Configuration, Cameras, How to multicast with gstreamer and Gige Cameras 
Entry  Tue Aug 19 13:34:58 2008, josephb, Configuration, Computers, Switched c1pem1, c0daqawg, c0daqctrl over to new switches 
ELOG V3.1.3-