40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 348  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Categoryup Subject Text Attachments
  13175   Wed Aug 9 11:59:51 2017 SteveUpdateVACunintended pump down at vacuum normalpd80b has reached Vac Normal. IFO pressure
0.5 mTorr

We need our vauum channels back
 pdc.pngpd80b@vacnormal.png 
  13179   Wed Aug 9 16:34:46 2017 ranaUpdateVACVacuum Document recoveredSteve and I found the previous draft of
the 40m Vacuum Document. Someone in 2015
had browsed into the Docs history and then
  
  13186   Thu Aug 10 15:45:34 2017 SteveUpdateVACaccidental vent to 17 TorrFinally we got the cold cathode gauge working.
IFO pressure 7e-6 Torr-it, vacuum normal
valve configuration with all 4 ion pump gate
 Mag_UPS.jpgUPSbatteryPack.jpgclosing_V1.jpg 
  13233   Mon Aug 21 14:53:32 2017 gautamUpdateVACRGA reset[gautam, steve]

In the aftermath of the accidental
vent, it looks like the RGA was shutdown.
  
  13234   Mon Aug 21 16:35:48 2017 gautamUpdateVACUPS checkup[steve, gautam]

At Rolf/Rich Abbott's request,
we performed a check of the UPS today.
  
  13245   Wed Aug 23 10:11:46 2017 SteveUpdateVACvacuum valve specificationsThe V1
gate valve specs installed at 40m wiki
page. VAT model number 10846-UE44-0007 Our
  
  13260   Mon Aug 28 10:28:07 2017 SteveUpdateVACRGA scan 20 day after 17 TorrThe RGA was turned on 7 days ago. 
It's 46 C now.   The X-arm room
tem ~20 C
 20d_after_17_torr.png 
  13268   Tue Aug 29 15:35:19 2017 SteveUpdateVACvacuum pump specifications & manualsRP1 and RP3 roughing pump manual of
Leybold D30A oily rotory pump

Fore pump of
 1759489_995814a9-55c1-4fa1-b333-f446d272c1cc.jpg 
  13321   Tue Sep 19 11:05:26 2017 SteveUpdateVACRGA scan at day 334  

 
 RGAscan334d.png 
  13403   Fri Oct 27 10:14:11 2017 SteveUpdateVACRGA scan at day 372Valve configuration: Vacuum normal

Note: Tp2 running at 75Krpm 0.25A
26C has a  load high pitch sound today.
 RGA_scan_d372.png 
  13407   Mon Oct 30 10:09:41 2017 SteveUpdateVACTP2 failed IFO pressure 1.2e-5 Torr at 9:30am




 tp2failed.pngifo_1.0E-5_Torrit.pngtp2failed2dago.png4days.png 
  13409   Mon Nov 6 09:09:43 2017 SteveUpdateVACsetting up new TP2 turboOur new Agilent Technology TwisTorr
84FS AG rack controller ( English Manual
pages 195-297 )  RS232/485, product
  
  13423   Fri Nov 10 08:52:21 2017 SteveUpdateVACTP3 drypump replacedPSL shutter closed at 6e-6 Torr-it    

   The foreline pressure
of the drypump is 850 mTorr at 8,446 hrs
  
  13454   Sun Nov 26 19:38:40 2017 SteveUpdateVACTP3 drypump replaced againThe TP3 foreline pressure was 4.8 Torr,
50K rpm 0.54A and 31C........Maglev rotation
normal 560 Hz.......    IFO pressure
 after_replacement.png 
  13459   Thu Nov 30 10:38:39 2017 SteveUpdateVACannuloses are not pumpedAnnuloses are not pumped for 30 days, since
TP2 failed.  IFO pressure 7e-6 Torr
it,  Rga 2.6e-6 Torr
 AnnulosesNotPumped.png 
  13495   Tue Jan 2 15:43:35 2018 SteveUpdateVACpumpdown after power outage 




 pumpdown_from_44_mTorr.png 
  13588   Tue Jan 30 10:22:20 2018 SteveUpdateVACRGA scan at day 175pd80b rga scan at 175 day.  IFO pressure
7.3e-6 Torr-it

Condition: vacuum normal, annuloses
 RGApd80-b-468-175d.pngRgaOn20hrs.png 
  13615   Wed Feb 7 15:50:42 2018 SteveUpdateVACIFO pressure monitoringHornet cold cathode gauge analoge output 
[ DSub9 pin 3 and 7 ] are wired to go ETMX
Acromag. It was reading 4.9V at 7.8e-6 Torr
 CC_analog.png 
  13637   Fri Feb 16 15:57:58 2018 SteveUpdateVACTP3 drypump replacedThe forline pressure of TP3 was 399 mTorr

It was replaced this morning at 
TP3 controller 134,638hrs with the "failed
  
  13647   Wed Feb 21 17:20:32 2018 johannesUpdateVACHornet gauge connected to DAQ.I wired the six available BNC connectors
on the front panel of the new XEND slow DAQ
to physical Acromag channels. There were
 VacLog.png 
  13653   Fri Feb 23 07:47:54 2018 SteveUpdateVACCC1 HornetWe have the IFO pressure logged again!
Thanks Johannes and Gautam

This
 InstruTech_Hornet_CC1.pngCC1_readback_updated.png 
  13664   Mon Mar 5 10:13:21 2018 gautamUpdateVACvacuum healthIn Steve's absence, I've tried
to keep an eye on the health of the vacuum
system. From Attachment #1, the pressure
 VacuumStatus.png 
  13685   Fri Mar 16 09:36:56 2018 SteveUpdateVACRGA scan at day 511,218dPumpdown 80 at 511 days and pd80b at 218
days

Valve configuration:  special
 RgaScan511d.png08.png 
  13702   Mon Mar 26 09:25:18 2018 SteveUpdateVACVM1 openedCC1 old MKS cold cathode gauge randomly
turns on- off. This makes software interlock
close VM1 to protect RGA  So the closed
 CC4VM1.png 
  13709   Tue Mar 27 08:58:21 2018 SteveUpdateVACVM1 opened.......scan fine 




 rga2018march27.png 
  13918   Wed Jun 6 10:02:52 2018 SteveUpdateVACRGA scan   RGA302d.pngannuloses_NOT_pumped.pngtemp_vac.png 
  13919   Wed Jun 6 10:44:52 2018 gautamUpdateVACAnnulus pressure channels added to frames[steve,
gautam]

We added the following channels
 AnsPressureLogged.png 
  14059   Thu Jul 12 16:18:22 2018 SteveUpdateVACVent preparationsWe are getting ready to vent.

 
 before_Vent.pngbefore_Vent_cond.png 
  14064   Fri Jul 13 10:54:55 2018 aaronUpdateVACVent 80[aaron, steve]

Steve gave me a venting tutorial.
I'll record this in probably a bit more
 vent80wtiptilts.png 
  14066   Fri Jul 13 16:26:52 2018 SteveUpdateVACVent 80 is completing...Steve and Aaron,

6 hrs vent is reaching equlibrium
to room air. It took 3 and a half instrument
 @atm.pngvent80_7h.pngventregN2&Air_c.jpg 
  14073   Mon Jul 16 15:07:19 2018 KojiSummaryVACOven C vent[Steve Koji]

- Attachment1: Removed the thermal
cap. Checked the temperature of the oven.
 P_20180716_141512.jpgP_20180716_141601.jpgP_20180716_141610.jpgP_20180716_141827.jpgP_20180716_143901.jpg 
  14074   Mon Jul 16 18:12:00 2018 KojiUpdateVACAdding a manual gate valve between TP1 and V1/VM2[Steve Koji]

We are in the process of adding
a manual gate valve between TP1 (Osaka Maglev)
 P_20180716_155413.jpgP_20180716_155645.jpgP_20180716_155738.jpgP_20180716_162307.jpgP_20180716_172000.jpg 
  14079   Tue Jul 17 18:16:38 2018 SteveSummaryVACpumpdown 81 at 6 hrsPrecondition:  4 days at atm.  
Atm5

HEPA tent used during the vent
 6x 
  14080   Tue Jul 17 22:25:41 2018 KojiSummaryVACpumpdown 81 at 6 hrs10:20PM


Opened VM2 to pump down
the RGA section with TP1
Stopped
  
  14082   Wed Jul 18 12:49:08 2018 SteveSummaryVACpumpdown 81 at 6 +4.5hrsThe manual gate valve scan was clean. Atm1
    TP1 was pumping on it overnight.

         
 manlGateScan.pnghanding_over_Mag.pngTGVw2auxfans_.jpg 
  14083   Wed Jul 18 17:36:50 2018 SteveSummaryVACpumpdown 81 at 6 +9 hrs completedIFO P1 6e-4 Torr,  manual gate valve
is fully open

The annuloses will be pumped down
 pd81completed.pngpd81@30hrs.png 
  14085   Thu Jul 19 01:56:25 2018 gautamSummaryVACAUX pump shutdown[koji,
gautam]

Per Steve's instructions, we
  
  14087   Thu Jul 19 11:01:03 2018 SteveSummaryVACpd81 @ 2e-5 TorrCold cathode gauge just turned on.  pd81@2days.png 
  14088   Thu Jul 19 13:35:30 2018 SteveSummaryVACannuloses pumped Roughing down the annuloses required closing
V1 for 13 minutes

IFO is 2.2e-5 Torr
 AnsPumped.png 
  14098   Mon Jul 23 09:58:52 2018 SteveSummaryVACRGA scan at day 6 

 
 pd81-560Hz-d6.png 
  14137   Mon Aug 6 09:34:02 2018 SteveUpdateVACRGA scan at day 20 

 
 pd81d20.png 
  14167   Thu Aug 16 07:50:28 2018 SteveUpdateVACpumpdown 81 at day 30 

 
 pd81d30.png 
  14168   Thu Aug 16 14:48:14 2018 SteveUpdateVACwhy do we need a root pump?

Basic Pump Throughput Concepts

What
is Pump Throughput?

The manufacturer
 6x 
  14183   Fri Aug 24 10:51:23 2018 SteveUpdateVACpumpdown 81 at day 38 

 
 d38.png 
  14189   Wed Aug 29 09:56:00 2018 SteveUpdateVACMaglev controller needs serviceTP-1 Osaka maglev controller  [ 
model TCO10M,  ser V3F04J07 ] 
needs maintenance. Alarm led  on indicating 
  
  14207   Fri Sep 21 16:51:43 2018 gautamUpdateVACc1vac1 is unresponsiveSteve pointed out that some of the vacuum
MEDM screen fields were reporting "NO
COMM". Koji confirmed that this is a
  
  14215   Mon Sep 24 15:06:10 2018 gautamUpdateVACc1vac1 reboot + TP1 controller replacement[steve, gautam]

Following the procedure in this
 beforeReboot.pngafterReboot.pngCC1.png 
  14217   Wed Sep 26 10:07:16 2018 SteveUpdateVACwhy reboot c1vac1Precondition: c1vac1 & c1vac2 all LED
warning lights green [ atm3 ], the only error
message is in the gauge readings NO COMM,
 NOcomm.pngReboot_&_sawp.pngc1vac1&2_.jpg 
  14229   Thu Oct 4 08:25:50 2018 SteveUpdateVACrga scan pd81 at day 78 

 
 pd81d78.png 
  14244   Fri Oct 12 08:27:05 2018 SteveUpdateVACdrypumpGautam and Steve,

Our TP3 drypump seal is at 360
mT [0.25A load on small turbo]  after
 forepump.png 
ELOG V3.1.3-