40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 354  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Typedown Category Subject Text Attachments
  1148   Wed Nov 19 18:12:35 2008 ranaConfigurationIOOnew channel for MC drum modesI set up the lockin to take the MC Demod Board's
Qmon signal, demodulate it at 27.5 kHz, and
put the output into a DAQ channel (I think
  
  1158   Sat Nov 22 10:55:51 2008 CarynConfigurationIOODrum modes Lock-In settings changedI unhooked the MC Demod Board's Qmon signal
from the Lock-In. Set the demodulation frequency
to 31.11Hz with 1V amplitude, and
  
  1159   Mon Nov 24 16:43:34 2008 ranaConfigurationComputersAlex and Jay took away some computers from the racksI was over at Wilson house and saw Jay and
Alex bring in 3 rackmount computers. One
was a Sun 4600 and
  
  1161   Mon Nov 24 19:15:16 2008 rana, alberto, johnConfigurationEnvironmenttemperatureThe PSL Room Temperature was alarming because
it had gone above 23 C. This set off an unfortunate
chain of events:
  
  1163   Tue Nov 25 19:29:15 2008 rana, alberto, johnConfigurationEnvironmenttemperature[quote]The PSL Room Temperature was alarming
because it had gone above 23 C. This set
off an unfortunate chain of events:
  
  1164   Thu Nov 27 22:56:42 2008 ranaConfigurationEnvironmenttemperature8-)  mc.png 
  1166   Tue Dec 2 17:56:56 2008 Alberto, RanaConfigurationPSLMC AlignmentIn the attempt to maximize the Mode Cleaner
transmission and minimize the reflection
from the steering mirrors of the MC periscope,
  
  1171   Wed Dec 3 19:21:09 2008 ranaConfigurationPEMRanger moveI looked at the Ranger signals. [B]Somehow
it has a relative transfer function of 'f'
between it and the Guralp.[/B]
 c.pdfwsnb.pdf 
  1175   Thu Dec 4 16:29:20 2008 josephbConfigurationComputersError message on Frame Builder Raid ArrayThe Fibrenetix FX-606-U4 RAID connected to
the frame builder in 1Y7 is showing the following
error message: IDE Channel #4  Error Reading
  
  1177   Fri Dec 5 01:41:33 2008 YoichiConfigurationComputersMEDM screen snapshot now works on linux machinesAs a part of my "make everything work on linux"
project, I modified 'updatesnap' script so
that linux machines can update MEDM screen
  
  1178   Fri Dec 5 01:58:58 2008 YoichiConfigurationASCtdscntr.pl now works at 40mTobin gave me the perl version of tdscntr
some time ago.
Pinkesh and I modified and tested it at LHO.
  
  1192   Thu Dec 18 12:52:00 2008 AlbertoConfigurationSUSMode Cleaner Cavity AlignmentThis morning I found the MC locked to the
10 mode. When I locked it on the 00 mode,
it was unstable and eventually it always
  
  1193   Thu Dec 18 19:15:54 2008 Alberto, YoichiConfigurationSUSMode Cleaner Cavity Alignment[quote]This morning I found the MC locked
to the 10 mode. When I locked it on the 00
mode, it was unstable and eventually it always
  
  1194   Fri Dec 19 11:18:52 2008 AlbertoConfigurationGeneralMode Cleaner Temperature MonitorI reduced from 10 to 5 the gain of the SR560
that Caryn has set up after the lock-in amplifier
nest to the PSL rack because the overload
  
  1195   Fri Dec 19 11:29:16 2008 Alberto, YoichiConfigurationMZMZ Trans PDLately, it seems that the matching of the
input beam to the Mode Cleaner has changed.
Also, it is drifting such that it has become
  
  1207   Mon Dec 29 21:51:02 2008 YoichiConfigurationComputersWeb server on nodusThe apache on nodus has been solely serving
for the svn web access.
I changed the configuration and all files
  
  1208   Tue Dec 30 18:51:18 2008 rana,yoichiConfigurationElectronicsIlluminator Power Supply reset[COLOR=blue][B]We noticed that none of the
illuminators were working.[/B][/COLOR]
  
  1217   Thu Jan 8 16:49:37 2009 ranaConfigurationloreHP 5550dtn (Grazia) set up on allegra[quote]I set up printing to grazia from allegra.
The CUPS interface was not as straightforward
as Tobin had made it seem in the Wiki. I
  
  1224   Tue Jan 13 11:10:42 2009 robConfigurationComputersconlogger restartedunknown how long it's been down.     
  1230   Thu Jan 15 22:30:32 2009 ranaConfigurationDMFDMF start scriptI tried to restart the DMF using the start_all
script: http://dziban.ligo.caltech.edu:40/40m/280
  
  1232   Fri Jan 16 11:33:59 2009 robConfigurationDMFDMF start script[quote]I tried to restart the DMF using the
start_all script: http://dziban.ligo.caltech.edu:40/40m/280
  
  1236   Fri Jan 16 18:45:20 2009 YoichiConfigurationIOOMC_L gain increased by a factor of 2Rana, Yoichi

Since we fixed the FSS AOM double-pass, which
 MC_F-MC_L-xover.pdfMC_F.pdf 
  1244   Thu Jan 22 11:54:09 2009 AlbertoConfigurationPSLMach Zehnder Output Beam QPDI rotated by 180 degrees the 10% beam splitter
that it is used to fold the beam coming from
the Mach Zehnder (directed to the MC) on
  
  1252   Sat Jan 24 11:50:24 2009 AlbertoConfigurationElectronicsPhotodiode Filters' Transfer FunctionsI found an elog entry by Jenne with the measurement
of the transfer functions of the filters
of some of our photodetectors. Since it might
  
  1253   Mon Jan 26 14:51:54 2009 josephbConfigurationVAC We need a new RS-232 to Ethernet bridge in
order to interface properly with the new
RGA.  The RGA has a fixed baud rate of 28.8k,
  
  1258   Thu Jan 29 16:50:53 2009 josephb, albertoConfigurationComputersMegatron fixedThe warning light on megatron and the fans
at full speed were fixed by not just power
cycling, but completely unplugging megatron
  
  1261   Fri Jan 30 17:30:31 2009 Alberto, JosephbConfigurationComputersNew computer Ottavia set upAlberto, Joseph,

Today we installed the computer that some
  
  1263   Mon Feb 2 12:35:22 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on NodusI moved the 40m, the Adhikari Lab and the
SUS elogs from Dziban (located in Millikan's
6th floor) to our gateway server Nodus. In
  
  1264   Mon Feb 2 17:25:44 2009 AlbertoConfigurationGeneralSome little problem with the new elogFor some reason the new elog does not look
exactly like it should. 

1) Some of the
editing features are not available.

2)
  
  1265   Mon Feb 2 18:32:54 2009 AlbertoConfigurationGeneralSome little problem with the new elog


   
        
            
  
  1266   Mon Feb 2 18:51:02 2009 AlbertoConfigurationGeneralNew Elog 2.7.5 in Service on Nodus


   
        
            
  
  1287   Mon Feb 9 19:50:48 2009 YoichiConfigurationPSLISS disconnectedWe are doing measurements on ISS.
The ISS feedback connector is disconnected
and the beam to the MC is blocked.
  
  1292   Wed Feb 11 10:52:22 2009 YoichiConfigurationDAQC1:PEM-OSA_APTEMP and C1:PEM-OSA_SPTEMP disconnectedDuring the cleanup of the lab. Steve found
a box with two BNCs going to the ICS DAQ
interface and an unconnected D-SUB on the
  
  1293   Wed Feb 11 11:39:17 2009 steveConfigurationGeneralvac envelope groundThe vacuum envelope was grounded from
the IOO chamber to master ground north (under
electric breaker panel L)
with
  
  1294   Wed Feb 11 15:01:47 2009 josephbConfigurationComputersAllegraSo after having broke Allegra by updating
the kernel, I was able to get it running
again by copying the xorg.conf.backup file
  
  1299   Thu Feb 12 18:35:10 2009 KakeruConfigurationPSLPA current limitter
I added a PA current limiter.
It is only a voltage devider (composed
  
  1302   Fri Feb 13 16:30:49 2009 steveConfigurationGeneralstatus quo is disturbed I have been getting ready for the annual
safety inspection in the past 2-3 days.
Meaning cleaning up and disturbing
  
  1303   Sat Feb 14 16:15:19 2009 robConfigurationComputersc1susvme1c1susvme1 is behaving weirdly.  I've
restarted it several times but its computation
time is hanging out around 260 usec, making
  
  1312   Mon Feb 16 20:47:48 2009 ranaConfigurationIOOMode Cleaner WFS Loop Gain changeI found the MCWFS gain slider down at 0.012.
In this state the UGFs are probably around
10-30 mHz
 pmc-pzt-cal.pdfa.pdfolg.pdfmc2.pdf 
  1314   Mon Feb 16 22:58:51 2009 rana, yoichiConfigurationSUSHysteresis in SUS from MisalignmentsWE wondered if there was some hysteresis in
the SUS alignments. When we leave the optics
misaligned for a
 a.png 
  1320   Wed Feb 18 19:13:20 2009 ranaConfigurationComputersSVN & MEDM & old medm filesAllegra had a 2 year old version of SVN installed
and CentOS (yum) couldn't upgrade it, so
I did an 'svn remove subversion'
  
  1333   Mon Feb 23 16:42:08 2009 josephbConfigurationCamerasCamera Beta TestingI've setup the GC650 camera (ID 32223)
to look at the mode cleaner transmission. 
I've also added an alias to the camera server
  
  1340   Thu Feb 26 19:20:08 2009 YoichiConfigurationGeneralETMX camera centered. POX, POY PDs centeredAlberto, Yoichi

We centered the ETMX camera.
  
  1345   Mon Mar 2 16:27:40 2009 AlbertoConfigurationElectronicsMC Drum Mode SR560 Preamplifier ReplacedToday I checked out the SR560 around the
lab. I confirmed that the one with the label
"channel A noisy" is effectively
  
  1356   Wed Mar 4 17:59:14 2009 YoichiConfigurationComputersezca tools and tds tools work aroundSome of ezca commands and tds commands sporadically
fail with a segmentation fault on linux machines.
As far as I know, ezcawrite, ezcastep, ezcaswitch,
  
  1357   Wed Mar 4 23:42:45 2009 ranaConfigurationPSLpsl db changeI made   
  1360   Thu Mar 5 02:24:19 2009 ranaConfigurationComputersyum.repos.dI added the following repos which
I found on allegra to megatron and then did
a 'yum install sshfs' on both machines:
  
  1362   Thu Mar 5 23:18:38 2009 KakeruConfigurationComputerstdsdata doesn't workI found that tdsdata doesn't work.

When I star tdsdata, he takes a few ~ 10
  
  1363   Fri Mar 6 01:04:49 2009 Kiwamu IZUMIConfigurationIOO!! lock-in amp disconnected !!The power supply of a lock-in amp, which
is on the Y-arm side of PSL clean room, was
pulled out by my mistake.
  
  1368   Fri Mar 6 18:26:37 2009 YoichiConfigurationComputersezca tools and tds tools work aroundI updated the wrapper scripts so that they
do not retry more than 6 times.
Otherwise, the wrapper scripts loop over
  
ELOG V3.1.3-