40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 339  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Type Category Subjectdown Text Attachments
  10233   Thu Jul 17 21:01:28 2014 ManasaUpdateGeneral1X2 Rack Changes

    

       
            
  
  10234   Thu Jul 17 22:08:14 2014 KojiUpdateGeneral1X2 Rack ChangesIt sounds like the work was done carefully.
Even so, Jenne or Manasa have to run the
ALS (X and Y) to check if they are still
  
  7433   Mon Sep 24 17:03:39 2012 JenneUpdatePEM1X1 rack power

    

       
            
  
  15669   Tue Nov 10 12:41:23 2020 gautamUpdateIOO1W > IMCLooking back through the elog, 1mtorr is
the pressure at which it is deemed safe to
send the full power beam into the IMC. After
 CD93A725-FB5C-4F67-BB2E-D122205114B0.jpeg 
  2804   Sat Apr 17 18:30:12 2010 ZachUpdateGreen Locking1W NPRO output profileNOTE:
This measurement is wrong and
only remains for documentation purposes.
 profile_fit_4_17_10.png 
  2807   Mon Apr 19 11:31:04 2010 AidanUpdateGreen Locking1W NPRO output profile

    

       
            
  
  2818   Tue Apr 20 13:02:14 2010 ZachUpdateGreen Locking1W NPRO output profileEDIT:
I used an IFIT (inverse fast idiot transform)
to change the x-axis of the plot from Hz
 profile_fit_4_19_10.png 
  2819   Tue Apr 20 13:37:36 2010 JenneUpdateGreen Locking1W NPRO output profile


   
        
            
  
  2821   Tue Apr 20 19:37:02 2010 KojiUpdateGreen Locking1W NPRO output profileBeautiful fitting.

  
  12070   Mon Apr 11 17:03:41 2016 SteveUpdateCalibration-Repair1W Innolight repair completedThe laser is back. Test report is in the
40m wiki as New Pump Diode Mephisto 1000
  
  12040   Mon Mar 21 14:29:32 2016 SteveUpdateCalibration-Repair1W Innolight laser repair diagnoses 




  
  3751   Thu Oct 21 10:44:56 2010 steveMetaphysicsTreasure1987 supernova tapes plus....?I'm cleaning out to make room for our new
optical cabinet. Are we keeping these? There
are  ~20  pieces of 10" od
 P1060932.JPG 
  16155   Mon May 24 08:38:26 2021 ChubUpdateElectronics18-bit AI, 16-bit AI and 16-bit AA- High priority units: 2x 18AI / 1x 16AI
/ 3x 16AA

All six are reworked and on the
  
  11772   Tue Nov 17 14:31:25 2015 ericqUpdateCDS16Hz frame writing temporarily disabledTo test the effect on EPICS latency, I've
restarted daqd with modified ini files which
disable all frame writing of 16Hz channels. 
  
  11777   Tue Nov 17 20:57:43 2015 ericqUpdateCDS16Hz frame writing running againBack to nominal FB configuration at 1131857782,
aka Nov 18 2015 04:56:05 UTC.

Weirdly, during this time, the script
  
  1534   Thu Apr 30 05:49:06 2009 YoichiUpdateLocking166MHz LO phase changedIn order to optimize the REFL_2I demod phase,
I changed the delay line setting for the
166MHz LO.
  
  1536   Fri May 1 01:32:43 2009 YoichiUpdateLocking166MHz LO phase adjustmentI continued to adjust the REFL_2I demodulation
phase.
I first optimized the demod phase for SRCL
  
  1537   Fri May 1 10:04:10 2009 robUpdateLocking166MHz LO phase adjustment[quote]I continued to adjust the REFL_2I demodulation
phase.
I first optimized the demod phase for SRCL
  
  2552   Thu Jan 28 09:17:32 2010 AlbertoUpdateLSC166 Modulation turned offI temporarily turned off the 166 modulation.   
  2545   Mon Jan 25 16:30:37 2010 AlbertoUpdateABSL166 MHz sideband turned offI turned off the modulation at 166MHZ
becasue I don't need it if I'm only locking
the PRC.
  
  2546   Mon Jan 25 16:46:33 2010 AlbertoUpdateABSL166 MHz sideband turned off

    
        
  
  2547   Tue Jan 26 03:28:56 2010 ranaUpdateABSL166 MHz sideband turned off 
 You can turn the 166 off if
you want. MZ is unhappy after its turned
  
  2389   Thu Dec 10 17:05:21 2009 AlbertoConfigurationLSC166 MHz LO SMA-to-Heliax connection repairedI replaced the SMA end connector for the
166 MHZ Local Oscillator signal that goes
to the back of the flange in the 1Y2 rack.
  
  2384   Thu Dec 10 13:10:25 2009 AlbertoConfigurationLSC166 LO DisconnectedI temporarily disconnected the Heliax cable
that brings the 166MHz LO to the LSC rack.
I'm doing a couple of measurement
  
  2393   Thu Dec 10 18:31:44 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
  2395   Fri Dec 11 09:30:09 2009 KojiConfigurationLSC166 LO DisconnectedThey
must not be dBm, must be dB 

  
  2396   Fri Dec 11 11:42:26 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
  2398   Fri Dec 11 14:12:32 2009 ranaConfigurationLSC166 LO Disconnected 
 Seems like very strange cable
loss numbers. The Heliax is lossier than
  
  2402   Fri Dec 11 19:51:13 2009 AlbertoConfigurationLSC166 LO Disconnected


   
        
            
  
  12948   Wed Apr 19 15:46:24 2017 gautamUpdateGeneral1611/1811 inventory checkI looked through the lab area to do a fast
photodiode inventory check, as we may need
to buy some for the higher order mode spectroscopy
  
  4351   Thu Feb 24 17:42:00 2011 AidanUpdateGreen Locking15% of end laser sideband power transmitted through cavityI did a quick calculation to determine
the amount of sideband transmission through
the FP cavity.
  
  9618   Mon Feb 10 18:03:41 2014 jamieUpdateCDS12 core c1sus replacementI have configured one of the spare Supermicro
X8DTU-F chassis as a dual-CPU, 12-core CDS
front end machine.  This is meant to
  
  7513   Tue Oct 9 23:12:56 2012 JenneUpdateLSC11MHz reconnected to EOMRiju hasn't been in the lab in a long time
to do any measurements, so I put the signals
back to how they should be.  
  
  4530   Fri Apr 15 12:17:39 2011 kiwamuUpdateLSC11MHz demod board : funny I-Q phaseDuring checking
the 11MHz demod boards I found that the I-Q
 relativephase.png 
  4533   Fri Apr 15 15:15:08 2011 kiwamuUpdateLSC11MHz demod board : 90 degree splitter[Rana, Koji, Kiwamu]
 Moreover
the amplitude of the I and Q signals are
  
  4537   Sat Apr 16 02:00:14 2011 ranaUpdateLSC11MHz demod board : 90 degree splitterOne way to avoid some of the bad stuff
in there is to take the 1 dBm input and amplify
it to ~21 dBm before splitting and sending
  
  2657   Thu Mar 4 22:07:21 2010 ranaUpdate40m Upgrading11MHz PD not yet designedUse 10 Ohms for the resistance - I have
never seen a diode with 25 Ohms.
p.s. PDFs can be joined together
  
  2656   Thu Mar 4 19:53:56 2010 AlbertoUpdate40m Upgrading11MHz PD designed adjusted for diode's resistance; 55 MHz RFPD designedAfter
reading this study done
 6x 
  6590   Mon Apr 30 22:58:57 2012 JenneUpdateElectronics11MHz Marconi set to default after power outageAfter a power outage, a Marconi comes back
to it's defaults.  It needed to be reset
to the values in elog 5530. 
  
  11230   Tue Apr 21 11:55:05 2015 SteveUpdateOptical Levers1103P noise measurementManasa and Steve,

Is this what you want?  Dashed
lines are dark.
 1103P@qpdBS.jpgoplev1103P.pngoplevSum1103Pbs.png 
  11231   Tue Apr 21 15:03:27 2015 ranaUpdateOptical Levers1103P noise measurementIt doesn't work with the lens in there,
but it seems pretty close. Please leave it
as is and I'll play with it after 5 today.
  
  11232   Tue Apr 21 21:46:34 2015 ranaUpdateOptical Levers1103P noise measurementTo test what the inherent angular noise
of the HeNe 1103P laser is, we're testing
it on a table pointing into the BS OL QPD
 oplev1103P.pngL1-ISI_SUS_ODC_FC496F_SPECTRUM-1113523216-86400.png 
  9072   Tue Aug 27 18:21:35 2013 JenneConfigurationElectronics110 MHz LO optionsAs I see it, we have a few options for
getting the 110 MHz LO to both the POP110
and AS110 demod boards.  
  
  9073   Tue Aug 27 18:58:52 2013 KojiConfigurationElectronics110 MHz LO options- Do we have an appropriate amplifier?
- True challenge could be to find
a feedthrough for the new port. (or to find
  
  7360   Fri Sep 7 12:28:09 2012 KojiUpdateLSC11&55MHz modulations turned off11MHz modulation source was turned off
(disabled) at Marconi at 12:00.
  
  845   Mon Aug 18 09:19:55 2008 steveSummaryVAC11 days at atmIt took 11 days to fix earth quake triggered
sus problems of ITMX, SRM and PRM
Only ITMX north and BSC north vac doors were
 ventprm.jpg 
  7515   Wed Oct 10 02:15:14 2012 ranaUpdateLSC11 MHz reconnected to EOM Absolutely hokey. What are
our requirements for this RFPD? What
are the power levels and SNR that we want
  
  2653   Wed Mar 3 18:32:25 2010 AlbertoUpdate40m Upgrading11 MHz RFPD elctronics** Please
add LISO file w/ component values.
 
 rfpd11_v2_TF.pdfrfpd11_v2_Noise.pdf 
  2655   Thu Mar 4 08:43:35 2010 AlbertoUpdate40m Upgrading11 MHz RFPD elctronics


   
        
            
 rfpd11_v2.fil 
  12949   Fri Apr 21 13:59:47 2017 Eric GustafsonSummary 1064 nm Semiconductor Laser Fiber Distribution System and Mirror Tomography1064 nm Semiconductor Laser Fiber
Distribution System and Mirror Tomography

Below threshold these Semiconductor
  
ELOG V3.1.3-