40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 334 of 341  Not logged in ELOG logo
Entry  Mon Aug 10 14:58:01 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU 
    Reply  Mon Aug 10 18:12:25 2009, Jenne, Update, PEM, 2nd set of Guralp channels plugged into ADCU 
Entry  Fri Oct 8 07:41:42 2010, steve, Configuration, SAFETY, 2W laser shutter is closed 
    Reply  Fri Oct 8 10:38:03 2010, steve, Configuration, SAFETY, 2W laser shutter is closed P1060905.JPGP1060910.JPG
Entry  Wed May 5 16:58:21 2010, Koji, Update, PSL, 2W hooked up to the interlock service 
Entry  Sat Apr 24 15:05:41 2010, Kevin, Update, PSL, 2W Vertical Beam Profile vbp.jpg
Entry  Wed Jun 2 22:58:04 2010, Kevin, Update, PSL, 2W Second Reflected Beam Profile profile_2nd.png
Entry  Thu Oct 14 23:33:45 2010, Suresh, Update, IOO, 2W NPRO laser output power versus temperature tempscan.pngScan2010.zip
    Reply  Fri Oct 15 00:15:52 2010, Koji, Update, IOO, 2W NPRO laser output power versus temperature 
Entry  Fri Oct 15 21:25:23 2010, Suresh, Update, IOO, 2W NPRO laser output power drop question 
Entry  Mon Aug 30 23:21:36 2010, rana, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software LaserMount.png
    Reply  Wed Sep 1 08:36:59 2010, Koji, HowTo, PSL, 2W NPRO Mount designed with emachineshop.com software 
Entry  Thu Jun 3 00:47:17 2010, Kevin, Update, PSL, 2W Beam Profile of Second Reflected Beam profile_2nd.png
Entry  Wed Jun 2 03:24:22 2010, Kevin, Update, PSL, 2W Beam Profile profile.pngerrors.pngLayout.jpg
    Reply  Wed Jun 2 04:27:02 2010, Koji, Update, PSL, 2W Beam Profile 
Entry  Wed Jun 25 12:25:28 2008, Eric, Summary, Cameras, 2D Gaussian Fitting Code 
    Reply  Sun Feb 5 21:56:50 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement 
    Reply  Tue Feb 7 12:01:10 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement RF_amp.pdf
    Reply  Tue Feb 7 17:00:55 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement 
    Reply  Fri Feb 10 02:14:10 2017, gautam, Update, IMC, 29.5 MHz stabilizer box replacement 
    Reply  Fri Feb 10 11:41:43 2017, Lydia, Update, IMC, 29.5 MHz stabilizer box replacement 
    Reply  Fri Feb 10 13:24:28 2017, rana, Update, IMC, 29.5 MHz stabilizer box replacement 
Entry  Wed Jan 25 15:41:29 2017, Lydia, Update, IMC, 29.5 MHz modulation depth measurement plan 
    Reply  Wed Jan 25 17:30:03 2017, Koji, Update, IMC, 29.5 MHz modulation depth measurement plan 
    Reply  Wed Jan 25 19:39:07 2017, gautam , Update, IMC, 29.5 MHz modulation depth measurement plan 
    Reply  Fri Jan 27 21:25:11 2017, Lydia, Update, IMC, 29.5 MHz modulation depth  
    Reply  Sat Jan 28 01:25:51 2017, gautam, Update, IMC, 29.5 MHz modulation depth  IMC_mod.pdfLockMCNew.png
Entry  Thu Apr 15 14:47:28 2010, steve, Update, Electronics, 25MHZ oscillation of HP4195A P1060246.JPGP1060249.JPG
Entry  Thu Jun 17 22:19:12 2021, Koji, Update, Electronics, 25 HAM-A coil driver units delivered P_20210617_195811.jpg
    Reply  Fri Dec 2 16:40:29 2016, gautam, Update, IMC, 24V fuse pulled out 
Entry  Wed Jul 2 13:56:10 2008, Rob, Yoichi, John, Update, Locking, 24.5 Hz resonance locking080702.png
Entry  Mon Mar 5 20:31:33 2012, Koji, Update, LSC, 22/110MHz path for POP 
    Reply  Tue Mar 6 22:23:04 2012, Koji, Update, LSC, 22/110MHz path for POP 
    Reply  Wed Mar 7 15:56:36 2012, Koji, Update, LSC, 22/110MHz path for POP RFseparator.pngimpedance.pdftransmission.pdf
    Reply  Wed Feb 27 20:50:41 2013, Manasa, Update, LSC, 22/110MHz path for POP POP.png
    Reply  Tue Apr 2 23:14:02 2013, rana, Update, LSC, 22/110MHz path for POP 
Entry  Wed May 12 23:31:17 2010, Alberto, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed POX11.png2010-05-12_POY11_CalibratedOpticalResponse0-500MHz.png
    Reply  Thu May 13 05:06:43 2010, rana, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed 
Entry  Fri Jan 12 20:35:34 2018, Udit Khandelwal, Summary, General, 2018/01/12 Summary 
    Reply  Wed Mar 30 16:40:24 2016, ericq, Update, LSC, 2016 vs 2010 2016_vs_2010.png
    Reply  Mon Mar 17 10:50:58 2014, steve, Update, safety, 2014 annual crane certification 2014craneCert.jpg
Entry  Fri May 6 10:20:00 2011, steve, Summary, SAFETY, 2011 safety audit sa2011done1.pdfP1070448.JPG
Entry  Fri May 22 01:27:14 2009, pete, Update, SUS, 200 days of MC3 side  mc3_side_200days.png
Entry  Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather test.png
Entry  Wed Jan 14 02:11:07 2015, rana, Summary, Treasure, 2-loop Algebra Loopology FSSloop.pdfFSSloop.png
Entry  Thu Nov 11 00:11:39 2021, Koji, Summary, SUS, 2" to 3" sleeve issue 6x
Entry  Wed Aug 25 08:53:33 2021, Jordan, Update, SUS, 2" Adapter Ring for SOS Arrived 8/24/21 20210824_152259.jpg20210824_152259.jpg20210824_152308.jpg
Entry  Wed Sep 29 09:36:26 2021, Jordan, Update, SUS, 2" Adapter Ring Parts for SOS Arrived 9/28/21 20210929_092418.jpg
Entry  Mon Aug 11 00:58:31 2008, rana, Update, PEM, 2 years of temperature trend Untitled.png
    Reply  Mon Aug 11 09:39:29 2008, rana, Update, PEM, 2 years of temperature trend 
ELOG V3.1.3-