40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 333 of 337  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Tue Jun 12 20:35:46 2012, yuta, Update, Green Locking, c1gcv recompiled c1gcv20120612-2.png
Entry  Tue Jun 12 23:18:18 2012, yuta, Update, Green Locking, I-Q signals for the beat FINEIQplot20120612.pngCOARSEIQplot20120612.pngbeatysetup20120612.png
Entry  Wed Jun 13 02:11:59 2012, yuta, Update, Green Locking, my first modescan (sort of) modescan20120612_1.png
    Reply  Wed Jun 13 03:03:38 2012, yuta, Update, Green Locking, my first modescan (sort of) 
Entry  Wed Jun 13 17:39:13 2012, yuta, Update, Green Locking, calibrating the beatbox ALS-BEATY_COARSE_I_IN1_DQ.pngALS-BEATY_COARSE_Q_IN1_DQ.pngALS-BEATY_FINE_I_IN1_DQ.pngALS-BEATY_FINE_Q_IN1_DQ.png
Entry  Thu Jun 14 01:36:34 2012, yuta, Update, Green Locking, can't scan Y arm for 1FSR BEATY_COARSE_LoopOnOff.png
Entry  Thu Jun 14 04:53:39 2012, yuta, Summary, Green Locking, designing ALS loop for mode scan ALSloop.pngALSopenloop.pngyarmlength.png
Entry  Thu Jun 14 21:37:37 2012, yuta, Update, Green Locking, succeeded in 1FSR mode scan YarmScan20120614.png
    Reply  Fri Jun 15 00:50:54 2012, yuta, Update, Green Locking, scanned Y arm for 5FSR YarmScan20120614_2.png
Entry  Fri Jun 15 13:33:39 2012, yuta, Update, Green Locking, ADC noise contribution to ALS YarmALSnoise20120615.png
Entry  Sat Jun 16 01:03:21 2012, yuta, Update, Green Locking, used longer delay line for mode scan YarmScan20120615.png
    Reply  Sat Jun 16 13:01:17 2012, yuta, Update, Green Locking, scanned Y arm for 5FSR YarmScanDV.png
    Reply  Sat Jun 16 18:17:00 2012, yuta, Update, Green Locking, Y arm length using 5FSR scan ALS-BEATY_COARSE_I_IN1_DQ.pngCalibYarmScan20120614_2.png
    Reply  Sat Jun 16 19:32:11 2012, yuta, Update, Green Locking, Y arm length using 5FSR scan 
Entry  Mon Jun 18 02:31:43 2012, yuta, Summary, Green Locking, analysis of mode scan data coarse5FSRscan.pngfine1FSRscan.pngHOMRFSB.pngcoarse5FSRscanHOMRFSB.png
Entry  Mon Jun 18 17:28:03 2012, yuta, Summary, Computers, bugs in CDS_PARTS/simLinkParts/Fcn model_sindegbug.pngdv_sindegbug.png
Entry  Mon Jun 18 23:54:31 2012, yuta, Update, Green Locking, phase tracker for ALS newIQLOCK.pngYarmScan20120618.pngfine8FSRscan.png
Entry  Tue Jun 19 23:36:19 2012, yuta, Update, LSC, calibrated POY error signal LSCyarmTF_usingITMY.pngLSCyarm_HAover1plusG.pngPOYerrorcalibration.png
    Reply  Wed Jun 20 00:02:16 2012, yuta, Update, Green Locking, slower scan using phase tracking ALS YarmScan20120619.png
    Reply  Wed Jun 20 16:37:11 2012, yuta, Update, Locking, ETMX 1064 trans camera 
Entry  Wed Jun 20 18:09:23 2012, yuta, Update, Locking, both arms aligned, ITMX oplev centered FPMIalignment2010620.png
    Reply  Wed Jun 20 18:43:57 2012, yuta, Update, LSC, calibrated POX error signal LSCxarmTF_usingITMX.pngLSCxarm_HAover1plusG.pngPOXerrorcalibration.png
    Reply  Thu Jun 21 12:56:49 2012, yuta, Update, Locking, ETMX 1064 trans camera Xarm_EndTableLayout_NewTransCamera.png
Entry  Thu Jun 21 15:36:51 2012, yuta, Update, Locking, X arm alignment 
    Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Entry  Sat Jun 23 02:29:18 2012, yuta, Update, Green Locking, X arm mode scan results XarmScan20120623.pngfine8FSRscanXarm.png
    Reply  Sat Jun 23 19:57:22 2012, yuta, Summary, Computers, c1ioo is down 
Entry  Sun Jun 24 00:10:45 2012, yuta, Update, Green Locking, current beat electronics beatsetup20120623.png
    Reply  Sun Jun 24 23:42:31 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
Entry  Mon Jun 25 15:07:49 2012, yuta, Update, IOO, MC beam spot trend MCdecenter.png
Entry  Mon Jun 25 17:48:27 2012, yuta, Update, Computer Scripts / Programs, script for finding IR resonance using ALS findIRresonance20120625.png
    Reply  Tue Jun 26 00:52:18 2012, yuta, Update, Computer Scripts / Programs, PMC locker 
Entry  Tue Jun 26 01:30:13 2012, yuta, Summary, Green Locking, simultaneous hold and release of the arm (aka two arm ALS) ALSboth20120625_2withAS.png
Entry  Tue Jun 26 22:37:43 2012, yuta, Update, IOO, energized OMC stages 
    Reply  Wed Jun 27 03:43:52 2012, yuta, Summary, IOO, how to improve mode matching to arms modematchMCtoARM_design.pngmodematchMCtoARM_MMT1MMT2longer.png
Entry  Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned 
    Reply  Wed Jun 27 23:54:21 2012, yuta, Update, Computer Scripts / Programs, image capturing script AS_1024901004.bmp
Entry  Thu Jun 28 00:50:48 2012, yuta, Update, Locking, PRMI work started, commissioning plan POP_1024903948.bmpREFL_1024903929.bmpAS_1024903921.bmp
    Reply  Thu Jun 28 20:59:28 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
    Reply  Fri Jun 29 01:49:36 2012, yuta, Bureaucracy, Locking, vent for PRC check, TOMORROW! 
Entry  Fri Jun 29 02:17:40 2012, yuta, Update, IOO, prep for the vent - beam attenuating 
    Reply  Fri Jun 29 03:21:32 2012, yuta, Update, General, prep for the vent - others MEDMscreenshotswithCOW_20120629.png
Entry  Fri Jun 29 16:41:41 2012, yuta, Update, General, PRM was NOT installed backwards 
Entry  Sun Jul 1 13:20:09 2012, yuta, Update, IOO, MC in low power 
Entry  Sun Jul 1 23:48:15 2012, yuta, Summary, General, clipping at BS, my plan PR3.JPGPRM.JPG
Entry  Mon Jul 2 18:27:25 2012, yuta, Update, General, BS and ITMX chambers closed 
Entry  Tue Jul 3 20:51:06 2012, yuta, Update, IOO, MC in vacuum is back ALL_1025408289.bmp
Entry  Wed Jul 4 20:13:46 2012, yuta, Bureaucracy, Locking, PRC commissioning plan 
Entry  Wed Jul 4 21:11:53 2012, yuta, Update, Locking, FPMI in vacuum is back ALL_1025495266.pngMEDMscreenshotswithCOW_20120704.png
Entry  Thu Jul 5 01:20:58 2012, yuta, Summary, CDS, slow computers, 0x4000 for all DAQ status 
ELOG V3.1.3-