40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log, Page 333 of 339 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Fri May 6 10:20:00 2011, steve, Summary, SAFETY, 2011 safety audit 
|
Fri May 22 01:27:14 2009, pete, Update, SUS, 200 days of MC3 side
|
Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather
|
Wed Jan 14 02:11:07 2015, rana, Summary, Treasure, 2-loop Algebra Loopology 
|
Thu Nov 11 00:11:39 2021, Koji, Summary, SUS, 2" to 3" sleeve issue 6x
|
Wed Aug 25 08:53:33 2021, Jordan, Update, SUS, 2" Adapter Ring for SOS Arrived 8/24/21  
|
Wed Sep 29 09:36:26 2021, Jordan, Update, SUS, 2" Adapter Ring Parts for SOS Arrived 9/28/21
|
Mon Aug 11 00:58:31 2008, rana, Update, PEM, 2 years of temperature trend
|
Mon Aug 11 09:39:29 2008, rana, Update, PEM, 2 years of temperature trend
|
Wed Nov 2 10:41:47 2011, steve, Update, General, 2 spare heliax at the LSC rack
|
Thu Apr 14 10:18:35 2022, Paco, Summary, BHD, 2 in oplev mirrors incompatible with LMR2V
|
Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened
|
Wed Mar 31 16:55:05 2010, josephb, Update, Computers, 2 computers from Alex and Rolf brought to 40m
|
Wed Mar 5 11:33:10 2014, Koji, Summary, LSC, 2 arm ALS->LSC transition - road map
|
Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! 
|
Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!!
|
Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!!
|
Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced
|
Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled
|
Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO
|
Tue Mar 3 11:39:50 2009, Osamu, DAQ, Computers, 2 PCs in Martian
|
Fri Sep 14 01:18:51 2012, rana, Update, COC, 2 Layout Changes
|
Mon Sep 17 18:04:01 2012, Steve, Update, COC, 2 Layout Changes
|
Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models
|
Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned
|
Thu Feb 21 19:55:46 2008, rana, Update, Electronics, 2 BNC Cables, 1 Tee
|
Thu Oct 25 21:02:34 2012, Den, Update, PEM, 1x7 dc power
|
Tue Dec 6 02:57:44 2011, kiwamu, Update, Green Locking, 1st trial of handing off
|
Mon Apr 29 18:53:03 2013, Jenne, Update, Electronics, 1pps timing fiber to OMC rack may be bent
|
Sun Jun 29 18:58:43 2008, rana, Summary, Computers, 1e20 is too big for AWG and/or IOVME
|
Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update
|
Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc
|
Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work  
|
Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered
|
Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed
|
Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed
|
Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras
|
Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3
|
Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work
|
Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work
|
Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.  
|
Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4
|
Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1
|
Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered
|
Thu Nov 24 01:28:09 2011, kiwamu, Update, General, 1X8 sorensen came back
|
Fri May 3 12:48:40 2019, gautam, Update, SUS, 1X4/1X5 cable admin
|
Thu Jul 17 17:08:58 2014, Harry, Update, General, 1X2 Rack Changes
|
Thu Jul 17 21:01:28 2014, Manasa, Update, General, 1X2 Rack Changes
|
Thu Jul 17 22:08:14 2014, Koji, Update, General, 1X2 Rack Changes
|
|