  1593   Sun May 17 14:35:52 2009 YoichiUpdateVACVC1 opened
I found the VC1 was closed and the pressure was 4.5e-3 torr.
I tweaked the optical sensor (cryopump temperature), and opened VC1.
  1601   Mon May 18 19:44:52 2009 rana, steveConfigurationVACCryo Pump turned off and valved off: 1 beer can only
I was seeing some excess noise in the ETMY oplev yaw and so we turned off the cryo and restarted c1vac2 to get the turbo pump channels back.

The RGA was also turned off to protect its innocence and we are now running on the single beer can Turbo (TP3). The pressure has risen
from 1e-7 to 2e-5 torr. We'll probably level off at 5e-5 overnight and that's fine for now.

Unfortunately, the VM1 valve, which is between the RGA and the main volume, keeps getting turned off by our interlock software
to protect the RGA. Probably because our Vac screen shows the RGA 'Normal' even though the power is off and the record is invalid (white;
although the MEDM screen doesn't show it white).

I also moved Steve's secret Vacuum control screen from the target/ directory to the correct medm directory (with all the other Vacuum
screens) and added it to the SVN.
  1602   Mon May 18 20:16:20 2009 ranaConfigurationVACnot it
There was essentially no change in the ETMY oplev spectrum with the cryo off!

So I went out to the ETMY OL table to see what else was going on. I found there one of
the most horrible opto-mechanical setups
I have ever seen (and remember that I have once
seen someone mount an NPRO on a cardboard box). Some bad person had mounted the ETMY OL
lens on a 12" long skinny post and extended it towards the viewport. So there was a post
holder on the table and a lens ~12" away on a rickety lever arm.

I took this lens away and the spectrum is now good. Shame on you.
CYAN -  cryo ON
BLACK - cryo OFF
BLUE -  no crappy lens + mount

This OL needs to be fixed correctly by putting in a proper lens to get a small spot on the QPD.
Attachment 1: a.png
a.png
  1604   Tue May 19 09:34:29 2009 steveConfigurationVACIFO is not pumped & CRYO is being regenerated
Morning Vacuum condition: IFO is not being pumped, P1 pressure is 1.8 mTorr and rising (see P1 pressure plot of 100 min ).

Overnight the RGA protection software interlock at closed the VM1 valve triggering on CC1 = 1e-5 torr.

This interlock blocked our attempt to hold the IFO operational pressure in the high 1e-5 Torr range with one small
"beer can" turbopump (Varian V70D drag-turbo pumping speed for N2 is ~60 l/s at 75KRPM).

I started CRYO regeneration using TP3. Pressure readout on the P3 gauge. This is after 30 days of CRYO operation.

V5 was closed for 60 sec to see the outgassing rate of the cryopump surfaces. It was good (but I am not going to elog
what 'good' actually means - instead I will write it in my paper logbook to prevent others from learning). I will now'
go start cooling down the cryo pump.

** translated into English by Rana
Attachment 1: cryoreg.jpg
cryoreg.jpg
Attachment 2: cryo30d.jpg
cryo30d.jpg
  1609   Tue May 19 16:18:45 2009 steveConfigurationVACIFO pressure is 4.2e-7 Torr with CRYO pump

Quote:
Morning Vacuum condition: IFO is not being pumped, P1 pressure is 1.8 mTorr and rising (see P1 pressure plot of 100 min ).

Overnight the RGA protection software interlock at closed the VM1 valve triggering on CC1 = 1e-5 torr.

This interlock blocked our attempt to hold the IFO operational pressure in the high 1e-5 Torr range with one small
"beer can" turbopump (Varian V70D drag-turbo pumping speed for N2 is ~60 l/s at 75KRPM).

I started CRYO regeneration using TP3. Pressure readout on the P3 gauge. This is after 30 days of CRYO operation.

V5 was closed for 60 sec to see the outgassing rate of the cryopump surfaces. It was good (but I am not going to elog
what 'good' actually means - instead I will write it in my paper logbook to prevent others from learning). I will now'
go start cooling down the cryo pump.

** translated into English by Rana


The Cryo cooled down to ~12K by noon.Photo switch was reset and VC1 was opened at 2pm

The VACMONITOR.adl screen is not working. Someone made some improvement on it last night.
  1610   Wed May 20 01:41:19 2009 peteUpdateVACcryopump probably not it

I found some neat signal analysis software for my mac (http://www.faberacoustical.com/products/), and took a spectrum of the ambient noise coming from the cryopump.  The two main noise peaks from that bad boy were nowhere near 3.7 kHz.

  1671   Fri Jun 12 09:56:38 2009 steveConfigurationVACnew maglev installed

Joe and Steve

 

The retrofitted Osaka 390 was installed on the pumpspool yesterday.

V1 gate valve is disabled for safety by disconnected pneumatic power plug.

The foreline of this maglev now have a KF25 size viton o-ring directly on the turbo.

This is bad for leak hunting.

Joe is ready with new interface cable. Power supply and cables are in place.

The maglev was pumped down this morning.

All new gas kits and metal hose were leak checked by sprayed methanol.

There is no obvious sign of leak. I was expecting the pressure to drop below 1e-5 Torr in one hour.

TP2 is drying out the levitating coils of the turbo at ~7 l/s for N2

We'll start the pump as soon as Joe is in.

 

 

Attachment 1: m390pd.jpg
m390pd.jpg
  1672   Fri Jun 12 15:34:49 2009 steveConfigurationVACmaglev is running

Quote:

Joe and Steve

 

The retrofitted Osaka 390 was installed on the pumpspool yesterday.

V1 gate valve is disabled for safety by disconnected pneumatic power plug.

The foreline of this maglev now have a KF25 size viton o-ring directly on the turbo.

This is bad for leak hunting.

Joe is ready with new interface cable. Power supply and cables are in place.

The maglev was pumped down this morning.

All new gas kits and metal hose were leak checked by sprayed methanol.

There is no obvious sign of leak. I was expecting the pressure to drop below 1e-5 Torr in one hour.

TP2 is drying out the levitating coils of the turbo at ~7 l/s for N2

We'll start the pump as soon as Joe is in.

 

 

 Joe and Steve

 

The Maglev is running at 680 Hz, 40,800 RPM with V1 gate valve  closed and  valve disabled to change position. C1vac2 was rebooted before starting.

Interlocks are not tested yet, but the medm COVAC_MONITOR.adl screen is reading correctly. RGA scan will determine the need for baking on Monday

The foreline pressure is still  ~2e-5 Torr

Acceleration takes 3 minutes 30sesconds without load. There is no observabale temp effect on the body of the turbo during braking and acceleration.

 

The IFO is still pumped by the CRYO only

  1673   Mon Jun 15 15:17:33 2009 josephb, SteveConfigurationVACVacuum control and monitor screens

We updated the vacuum control and monitor screens  (C0VAC_MONITOR.adl and C0VAC_CONTROL.adl).  We also updated the /cvs/cds/caltech/target/c1vac1/Vac.db file.

1) We changed the C1:Vac-TP1_lev channel to C1:Vac-TP1_ala channel, since it now is an alarm readback on the new turbo pump rather than an indication of levitation.  The logic on printing the "X" was changed from X is printed on a 1 = ok status) to X is printed on a 0 = problem status.  All references within the Vac.db file to C1:Vac-TP1_lev were changed.  The medm screens also now are labeled Alarm, instead of Levitating.

2) We changed the text displayed by the CP1 channel (C1:Vac-CP1_mon in Vac.db) from "On" and "Off" to "Cold - On" and "Warm - OFF".

3) We restarted the c1vac1 front end as well as the framebuilder after these changes.

  1674   Mon Jun 15 16:31:36 2009 steveConfigurationVACRGA is scanning new Maglev

Quote:

Quote:

Joe and Steve

 

The retrofitted Osaka 390 was installed on the pumpspool yesterday.

V1 gate valve is disabled for safety by disconnected pneumatic power plug.

The foreline of this maglev now have a KF25 size viton o-ring directly on the turbo.

This is bad for leak hunting.

Joe is ready with new interface cable. Power supply and cables are in place.

The maglev was pumped down this morning.

All new gas kits and metal hose were leak checked by sprayed methanol.

There is no obvious sign of leak. I was expecting the pressure to drop below 1e-5 Torr in one hour.

TP2 is drying out the levitating coils of the turbo at ~7 l/s for N2

We'll start the pump as soon as Joe is in.

 

 

 Joe and Steve

 

The Maglev is running at 680 Hz, 40,800 RPM with V1 gate valve  closed and  valve disabled to change position. C1vac2 was rebooted before starting.

Interlocks are not tested yet, but the medm COVAC_MONITOR.adl screen is reading correctly. RGA scan will determine the need for baking on Monday

The foreline pressure is still  ~2e-5 Torr

Acceleration takes 3 minutes 30sesconds without load. There is no observabale temp effect on the body of the turbo during braking and acceleration.

 

The IFO is still pumped by the CRYO only

 The new Maglev fore line pressure is at 4e-6 torr at day 3

Valve VM1 was closed to isolate IFO from RGA and valve VM2 was opened so the RGA can scan the Maglev only.

 

  1677   Tue Jun 16 09:02:30 2009 steveConfigurationVACnew maglev RGA scan

The maglev fore line pressure is 3e-6 torr at CC2 after 4 days of pumping. Varian turbo V-70 is pumping on it through V4 and VM2

Actual pumping speed ~10 l/s for N2. There was no baking. The maglev performance looks good : 3e-9 torr on CC4  with RGA -region only.

Attachment 1: nmagd4scan.jpg
nmagd4scan.jpg
Attachment 2: nmagd4.jpg
nmagd4.jpg
  1690   Tue Jun 23 10:06:03 2009 steveUpdateVACnew maglev RGA scan at day6

The Maglev is running for 10 days with V1 closed.  The pressure at the RGA-region is  at 2e-9 torr on CC4 cold cathode gauge.

Valve VM2 to Rga-only was opened 6 days ago. The foreline pressure is still 2.2e-6 torr with small Varian turbo ~10 l/s on cc2

Daily scans show small improvement in large amu 32 Oxygen and large amu 16, 17 and 18 H20 water peaks.

Argon calibration valve is leaking on our Ar cylinder and it is constant.

 

The good news is that there are no fragmented hydrocarbons in the spectrum.

The Maglev is soaked with water. It was seating in the 40m for 4 years with viton o-ring seals

However I can not explan the large oxygen peak, either Rai Weiss can not.

 

The Maglev scans are indicating cleanliness and water. I'm ready to open V1 to the IFO

Attachment 1: newmagscand6.jpg
newmagscand6.jpg
Attachment 2: nmagpresd10.jpg
nmagpresd10.jpg
  1691   Tue Jun 23 15:19:42 2009 steveConfigurationVACV1 is open

Quote:

The Maglev is running for 10 days with V1 closed.  The pressure at the RGA-region is  at 2e-9 torr on CC4 cold cathode gauge.

Valve VM2 to Rga-only was opened 6 days ago. The foreline pressure is still 2.2e-6 torr with small Varian turbo ~10 l/s on cc2

Daily scans show small improvement in large amu 32 Oxygen and large amu 16, 17 and 18 H20 water peaks.

Argon calibration valve is leaking on our Ar cylinder and it is constant.

 

The good news is that there are no fragmented hydrocarbons in the spectrum.

The Maglev is soaked with water. It was seating in the 40m for 4 years with viton o-ring seals

However I can not explan the large oxygen peak, either Rai Weiss can not.

 

The Maglev scans are indicating cleanliness and water. I'm ready to open V1 to the IFO

 V1 valve is open to IFO now. V1 interlock will be tested tomorrow.

Valve configuration: VAC NORMAL with CRYO and Maglev are both pumping on the IFO

Attachment 1: V1_opennmag.jpg
V1_opennmag.jpg
  1693   Wed Jun 24 09:21:19 2009 steveConfigurationVACIFO RGA scan with Maglev & Cryo

Quote:

Quote:

The Maglev is running for 10 days with V1 closed.  The pressure at the RGA-region is  at 2e-9 torr on CC4 cold cathode gauge.

Valve VM2 to Rga-only was opened 6 days ago. The foreline pressure is still 2.2e-6 torr with small Varian turbo ~10 l/s on cc2

Daily scans show small improvement in large amu 32 Oxygen and large amu 16, 17 and 18 H20 water peaks.

Argon calibration valve is leaking on our Ar cylinder and it is constant.

 

The good news is that there are no fragmented hydrocarbons in the spectrum.

The Maglev is soaked with water. It was seating in the 40m for 4 years with viton o-ring seals

However I can not explan the large oxygen peak, either Rai Weiss can not.

 

The Maglev scans are indicating cleanliness and water. I'm ready to open V1 to the IFO

 V1 valve is open to IFO now. V1 interlock will be tested tomorrow.

Valve configuration: VAC NORMAL with CRYO and Maglev are both pumping on the IFO

The IFO RGA scan is normal.

The Cryo needs to be regenerated next. It has been pumping for 36 days since last regenerated.

This has to be done periodically, so the Cryo's  14 K cold head is not insulated by by ice of all things pumped away from the IFO

Attachment 1: nmagd1ifo.jpg
nmagd1ifo.jpg
Attachment 2: nmagCryopres.jpg
nmagCryopres.jpg
  1701   Thu Jun 25 10:28:58 2009 steveHowToVACCryopump is regenerated
The Cryopump's VC1 valve to IFO was closed yesterday.
The compressor  Helium pressure was 235 PSI. The cold head temp on H2 vapor pressure gauge was reading ~14 Kelvin,
The compressor and piston driver were turned off to let cold head warm up to room temp.
The flow path from Cryo to TP3 were checked to insure that only VC2 and V5 would be open for pumping.
VC2 valve was opened to TP3 through V5
Now as the Cryo was warming up while TP3 drag turbo pump was pumping away the accumulated ice, that was melting and vaporizing.
This is shown on one day the plot below.
To check outgassing rate of the Cryo pump after one day of pumping V5 was closed for 20 minutes.
The accumulation was 1.3 mTorr in 20 min
This means the Cryo is clean, it is ready to be started up in the future.
VC2 was closed to seal this condition.
The flow path between VC2, VM3, V7, V6 , VA6 and manual needle valve  would be pumped for one day through V5 to TP3 to clean up 
Attachment 1: Creg.jpg
Creg.jpg
  1716   Thu Jul 2 17:37:36 2009 steveUpdateVACV1 interlock test

Joe, Alberto and Steve

We tested gate valve V1 interlock by :

1, decelerated rotation by brake from maglev controller unit.

2, turned maglev  controller off from controller unit.

3, unpluged 220VAC plug from wall socket

None of the above action triggered V1 to close. This needs to be corrected in the future.

The MEDM monitor screen of maglev indicated the correct condition changes.

 

 

  1763   Mon Jul 20 10:35:06 2009 steveUpdateVACUPS batteries replaced

 APC Smart-UPS (uninterruptible power supply) batteries RBC12 replaced at 1Y8 vacuum rack.

Their life span were 22 months.

  1840   Thu Aug 6 09:05:29 2009 steveUpdateVAClarge O-rings of vacuum envelope

The 40m-IFO vacuum envelope doors are sealed with dual viton O-rings and they are pumped through the annulos lines.

This allows easy access into the chambers. The compression of the o-rings are controlled by the o-ring grooves.

The OOC (output optic chamber)'s west side door has no such groove and it is sealed by just one single O-ring.

We have to protect this O-ring from total compression by 3 shims as shown below.

There were control shims in place before and they disappeared.

Let's remember that these shims are essential to keep our vacuum system in good condition.

 

Attachment 1: vacsor1.png
vacsor1.png
Attachment 2: vacsor2.png
vacsor2.png
  1852   Fri Aug 7 09:50:57 2009 steveConfigurationVACIFO pressure rose to 2.3 mTorr

IFO pressure was 2.3 mTorr this morning,

The Maglev's foreline valve  V4 was closed so P2 rose to 4 Torr. The Maglev was running fine with V1 open.

This is a good example for V1 to be closed by interlock, because at 4 Torr foreline pressure the compression ratio for hydrocarbones goes down.

V4 was closed by interlock when TP2 lost it's drypump. The drypump's AC plug was lose.

To DO: set up  interlock  to close V1 if P2 exceeds 1 Torr

Attachment 1: tp2fpfail.jpg
tp2fpfail.jpg
  1857   Fri Aug 7 16:11:11 2009 steve, robConfigurationVACIFO pressure rose to 2.3 mTorr

Quote:

IFO pressure was 2.3 mTorr this morning,

The Maglev's foreline valve  V4 was closed so P2 rose to 4 Torr. The Maglev was running fine with V1 open.

This is a good example for V1 to be closed by interlock, because at 4 Torr foreline pressure the compression ratio for hydrocarbones goes down.

V4 was closed by interlock when TP2 lost it's drypump. The drypump's AC plug was lose.

To DO: set up  interlock  to close V1 if P2 exceeds 1 Torr

 

 

 

We added C1:Vac-CC1_pressure to the alarm handler, with the minor alarm at 5e-6 torr and the major alarm at 1e-5 torr.

  1858   Fri Aug 7 16:14:57 2009 robOmnistructureVACUPS failed

Steve, Rana, Ben, Jenne, Alberto, Rob

 

UPS in the vacuum rack failed this afternoon, cutting off power to the vacuum control system.  After plugging all the stuff that had been plugged into the UPS into the wall, everything came back up.  It appears that V1 closed appropriately, TP1 spun down gracefully on its own battery, and the pressure did not rise much above 3e-6 torr. 

 

The UPS fizzed and smelled burnt.  Rana will order a new, bigger, better, faster one.

 

  1863   Fri Aug 7 18:06:24 2009 robOmnistructureVACopening V1 when PTP1 is broken

We've had a devil of a time getting V1 to open, due to the Interlock code. 

 

The short story is that if C1:Vac-PTP1_pressure > 1.0, the interlock code won't let you push the button to open V1 (but it won't close V1). 

 

PTP1 is broken, so the interlock was frustrating us.   It's been broken for a while, but this hasn't bitten us till now.

 

We tried swapping out the controller for PTP1 with one of Bob's from the Bake lab, but it didn't work. 

 

It said "NO COMM" in the C1:Vac-PTP1_status, so I figured it wouldn't update if we just used tdswrite to change C1:Vac-PTP1_pressure to 0.0.  This actually worked, and V1 is now open.  This is a temporary fix.

  1864   Fri Aug 7 19:34:40 2009 steveSummaryVACUPS failed

The Maglev is running on single phase 220V and that voltage  was not interrupted. TP1 was running undisturbed with V1 and V4 closed.

It is independent of the UPS 120V.

  1865   Fri Aug 7 19:55:08 2009 steveSummaryVACopening V1 when PTP1 is broken

The swapped in 307 convectron gauge controller  is very likely to have the  RS232 connection  wired differently from the old one.

PRP gauge has now the same error message as the PTP1:  "no comm"  I would look at RS232 wiring of the PRP gauge on the broken

controller and adapt the swapped in one to communicate. The PRP was reading 620 Torr before the swap.

  1912   Sat Aug 15 18:57:48 2009 ranaUpdateVACUPS failed

As Rob noted last Friday, the UPS which powers the Vacuum rack failed. When we were trying to move the plugs around to debug it, it made a sizzling sound and a pop. Bad smells came out of it.

Ben came over this week and measured the quiescent power consumption. The low power draw level was 11.9 A and during the reboot its 12.2 A. He measured this by ??? (Rob inserts method here).

So what we want is a 120 V * 12.2 A  ~ 1.4 kVA UPS with ~30-50% margin. We look for this on the APC-UPS site:

On Monday, we will order the SUA2200 from APC. It should last for ~25 minutes during an outage. Its $1300. The next step down is $200 cheaper and gives 10 minutes less uptime.

  1937   Mon Aug 24 16:48:57 2009 steveHowToVACnew UPS installed

Quote:

As Rob noted last Friday, the UPS which powers the Vacuum rack failed. When we were trying to move the plugs around to debug it, it made a sizzling sound and a pop. Bad smells came out of it.

Ben came over this week and measured the quiescent power consumption. The low power draw level was 11.9 A and during the reboot its 12.2 A. He measured this by ??? (Rob inserts method here).

So what we want is a 120 V * 12.2 A  ~ 1.4 kVA UPS with ~30-50% margin. We look for this on the APC-UPS site:

On Monday, we will order the SUA2200 from APC. It should last for ~25 minutes during an outage. Its $1300. The next step down is $200 cheaper and gives 10 minutes less uptime.

The new APC Smart -UPS 2200VA is now running at  the vacuum rack. There are 2 load monitoring leds on out of 5

Maglev, dry pumps and roughing pumps are not using UPS.

The switch over went smoothly with Yoichi's help.

First we closed all vacuum valves and stopped the two small turbos.

Than turned power off to instruments in the vac-rack and VME: c1vac1 & c1vac2

Maglev was left running.

Now we moved the AC plugs from the wall receptacles over to the back of the UPS and powered them up.

Varian turbos were restarted and vacuum valves were restored in order to reach  vacuum normal condition.

See 40m Vacuum System States and Sequences Manual of 10-24-2001

 

Linux 3 desk top computer is out of order at the pump spool. We should replace it.

The vacuum control screen can be pulled up on a lap top: /cvs/cds/caltech/medm/c0/ve/VacControl_BAK.adj

 

  1967   Fri Sep 4 16:09:26 2009 josephbSummaryVACRebooted RGA computer and reset RGA settings

Steve noticed the RGA was not working today.  It was powered on but no other lights were lit.

Turns out the c0rga machine had not been rebooted when the file system on linux1 was moved to the raid array, and thus no longer had a valid mount to /cvs/cds/.  Thus, the scripts that were run as a cron could not be called.

We rebooted c0rga, and then ran ./RGAset.py to reset all the RGA settings, which had been reset when the RGA had lost power (and thus was the reason for only the power light being lit).

 

Everything seems to be working now.  I'll be adding c0rga to the list of computers to reboot in the wiki.

  1974   Tue Sep 8 16:01:52 2009 steveConfigurationVACRGA was separeted from IFO

The RGA isolation valve VM1 was closed since Aug 24, 2009  I installed the new UPS that time.

The last RGA scan in the log is from Aug 7, 2009   The vacuum rack UPS failed on Aug 15, 2009

I opened VM1 today so we can have ifo rga scan tomorrow.

 

Attachment 1: vm1closed.jpg
vm1closed.jpg
  2137   Fri Oct 23 09:13:45 2009 steveSummaryVACRGA scan

Pump down #66 is 435 days old. RGA scan is normal. New maglev is fine. New UPS is in place but not hooked up to communicate.

V1 has bare minimum interlock. Pirani vacuum gauges  PTP1 and PRP do not communicate with readout system.

There is no emergency dial out in case of vacuum loss.  Our existing vacuum dedicated desk top computer is dead.

New cold cathodes, Pirani gauges and gauge controller should be added.

In general: vacuum system needs an upgrade !

 

Attachment 1: pd66md435.jpg
pd66md435.jpg
Attachment 2: pd66d435ptt.jpg
pd66d435ptt.jpg
  2360   Mon Dec 7 09:38:05 2009 KojiUpdateVACVent started

Steve, Jenne, Koji

The PSL was blocked by the shutter and the manual block.
We started venting
at 9:30

09:30  25 torr
10:30 180 torr
11:00 230 torr

12:00 380 torr

13:00 520 torr
14:30 680 torr - Finish. It is already over pressured.

  2386   Thu Dec 10 13:50:02 2009 JenneUpdateVACAll doors on, ready to pump

[Everybody:  Alberto, Kiwamu, Joe, Koji, Steve, Bob, Jenne]

The last heavy door was put on after lunch.  We're now ready to pump.

  2387   Thu Dec 10 15:18:55 2009 JenneUpdateVACseisBLRMS

last 20 days - including the pounding from next door

Attachment 1: Untitled.png
Untitled.png
  2388   Thu Dec 10 16:51:35 2009 steveUpdateVACpumpdown will start tomorrow morning

The vacuum system is at 760 torr  All chambers with doors on and their annuloses are pumped down.

PSL output shutter is still closed. We are fully prepared to star slow pump down tomorrow.

The plan is to reach 1 torr ~ in 6 hrs  without a creating a sand storm.

  2394   Fri Dec 11 08:35:04 2009 steveConfigurationVACpumpdown has started

Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened  RV1 valve at 8am today.

Attachment 1: wiping.jpg
wiping.jpg
  2397   Fri Dec 11 13:18:17 2009 AlbertoConfigurationVACpumpdown has started

Quote:

Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened  RV1 valve at 8am today.

 I'm leaving the lab now for less than 2 hours. I should be back in time for when the pumping is finished so that I can measure the finesse again.

  2399   Fri Dec 11 14:19:22 2009 KojiConfigurationVACpumpdown has started

Wait, Wait, Wait. You are moving too fast. Go one by one.

Check the PZTs, the MC, initial pointings, IFO mirrors, some of the partial locks, and maybe some momentary full locks?
Once the recover of the IFO is declared, you can proceed to the measurements.

I hope the grad students can take this precious opportunity to have their fun time for restoring everything by themselves.

Quote:

 I'm leaving the lab now for less than 2 hours. I should be back in time for when the pumping is finished so that I can measure the finesse again.

 

  2400   Fri Dec 11 15:21:40 2009 steveConfigurationVACpumpdown#67 is completed

Quote:

Oplev positions before and after drag wiped arm TMs as of yesterday. Slow-mode pumpdown has started with 3/4 turn opened  RV1 valve at 8am today.

 Pump down is completed. Valve configuration is VACUUM NORMAL. CC1 pressure is in the ~8 e-5 torr   PSL output shutter is opened.

Attachment 1: pd7h.jpg
pd7h.jpg
Attachment 2: oplevpd8h.jpg
oplevpd8h.jpg
  2538   Thu Jan 21 11:08:30 2010 kiwamu, steveUpdateVACDry Pump replacement

 This morning I and Steve replaced  the dry fore pump of TP3, which is located under the y-arm.

After replacing it we confirmed vacuum normal condition. The fore line pressure of TP3 went down to 11 mTorr from 750 mTorr

  Attached picture is new pump after setup.

Attachment 1: DSCN0428.JPG
DSCN0428.JPG
  2573   Fri Feb 5 11:01:49 2010 steveConfigurationVACslow pumpdown valve

I have installed a slow start throttle valve in front of V3  This spring loaded valve will cut down on the flow at high pressures. There will be no more sand storme

and static built-up during pump down.

Attachment 1: slow.JPG
slow.JPG
  2589   Thu Feb 11 15:53:59 2010 steveConfigurationVACPSL output shutter is closed

Joe and Alex are working on the computers. Our vacuum system is temporary "All off" condition: meaning all valves are closed, so there is no pumping. cc1 = 1.6e-6 Torr

  2592   Thu Feb 11 18:53:57 2010 steveConfigurationVACVAC NORMAL is back

Quote:

Joe and Alex are working on the computers. Our vacuum system is temporary "All off" condition: meaning all valves are closed, so there is no pumping. cc1 = 1.6e-6 Torr

 Designated vacuum control lap top is trouble some to use. Joe finally fixed it and I switched valve configuration back to vacuum normal. Shutter is open

  2613   Thu Feb 18 15:39:16 2010 Koji and SteveConfigurationVACvalve condition: ALL OFF

As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.

IFO chamber is not pumped now. Small leaks and out gassing will push the pressure up slowly. At 3 mTorr of P1 the PSL output shutter

will be closed by the interlock.

It is OK to use light in the IFO up to this point.

  2616   Fri Feb 19 10:18:19 2010 JenneUpdateVACThe P1 vac pressure is almost to 3mTorr

The Vac pressure measured at P1 is at 2.5mTorr.  I expect we'll hit 3mTorr sometime this afternoon, at which point (according to Steve) the interlock will shut the shutter, and we won't have light in the IFO.  Anything which needs to happen with light in the IFO before Monday needs to happen fairly soon.

Attachment 1: VacPressureAlmostShutoffLaser_19Feb2010.png
VacPressureAlmostShutoffLaser_19Feb2010.png
  2624   Mon Feb 22 11:38:05 2010 joe, jenne and steveConfigurationVACvacuum is back to normal

Morning condition: vacuum rack power is still off, no MEDM screen reading.....meaning unknown vacuum pressure.We closed PSL shutter immediately.

Joe restored c1iscepis and Jenne powered up the vac-rack UPS. Now the rest of the vac-rack power were restored from starting at the top to bottom.

P1 was reading 15 mTorr.  We restarted pumps and  set vacuum valve positions. V1 opening required Rob's recipe of elog # 1863 to defeat interlock that

has a non communicating gauge: PTP1

CC1 pressure just reached 1e-6 Torr at VAC NORMAL configuration.

  2631   Tue Feb 23 13:37:04 2010 kiwamu and steveConfigurationVACventing the 40m vac envelope

Kiwamu and Steve have started venting the 40m vacuum envelope.

Preparation:

centered oplevs at resonating cavities,

ITM references were set by green pointer from the ends by Koji,

closed  PSL shutter and placed manual block into beam path,

checked  jamnuts in locked positions on bellows,

turned  HV off at PZT-Jena "steering mirror" power supply and OMC HV ps

checked  particle counts,

switched oplev servos off,

set up N2 cylinder to start vent from 1e-6 Torr to 25 Torr,

have ~ 6 cylinders of instrument grade compressed air to bring envelope from 25 Torr to 760 Torr

 

All three cranes were wiped off today.

 

  2633   Tue Feb 23 16:20:44 2010 steveConfigurationVACoutgassing + leak

Quote:

As preparation for the upcoming planned power outage we turned turbos, RGA off and closed valves.

IFO chamber is not pumped now. Small leaks and out gassing will push the pressure up slowly. At 3 mTorr of P1 the PSL output shutter

will be closed by the interlock.

It is OK to use light in the IFO up to this point.

 Our vacuum was not pumped for 4 days. The computers were not up when we started pumping again. The manual reading on P1 was 15 mTorr.

This means that our outgassing plus leakrate is  ~3.8 mTorr /day 

3-5 mTorr / day is normal

Attachment 1: outgleak.jpg
outgleak.jpg
  2635   Tue Feb 23 19:00:45 2010 kiwamuConfigurationVACvent finished

The vent has been finished.

Now the pressure inside the chamber is 760 torr, and it's getting equilibrium with the atmospheric pressure.

Therefore we are ready and can open the door of the chamber tomorrow.

  2636   Tue Feb 23 19:07:43 2010 kiwamu and steveConfigurationVACvent is completed

Quote:

Kiwamu and Steve have started venting the 40m vacuum envelope.

Preparation:

centered oplevs at resonating cavities,

ITM references were set by green pointer from the ends by Koji,

closed  PSL shutter and placed manual block into beam path,

checked  jamnuts in locked positions on bellows,

turned  HV off at PZT-Jena "steering mirror" power supply and OMC HV ps

checked  particle counts,

switched oplev servos off,

set up N2 cylinder to start vent from 1e-6 Torr to 25 Torr,

have ~ 6 cylinders of instrument grade compressed air to bring envelope from 25 Torr to 760 Torr

 

All three cranes were wiped off today.

 

 Kiwamu has completed the vent.

Attachment 1: vent2010feb23.jpg
vent2010feb23.jpg
  2644   Fri Feb 26 15:32:13 2010 steveConfigurationVACpreparation for power outage: vacuum all off

There is a planned power outage tomorrow, Saturday from 7am till midnight.

I vented all annulies and switched to ALL OFF configuration. The small region of the RGA is still under vacuum.

The vac-rack: gauges, c1vac1 and UPS turned off.

Attachment 1: ventd3.jpg
ventd3.jpg
  2648   Mon Mar 1 11:21:50 2010 steveConfigurationVACvacuum contoller is back to normal

Quote:

There is a planned power outage tomorrow, Saturday from 7am till midnight.

I vented all annulies and switched to ALL OFF configuration. The small region of the RGA is still under vacuum.

The vac-rack: gauges, c1vac1 and UPS turned off.

 Vac- rack is powered back up.  UPS first, than all other power switches from top to bottom of the rack, except Maglev

Manually started one by one TP2 and TP3  to accelerate to 50 KRPM

Brought up vac.control screen on lap-top at /cvs/cds/caltech/medm/c0/ve/VacControl_BAK.adl

V5 and VM3 were opened so TP3 can pump on the RGA

V4 was opened so TP2 can pump on the Maglev-TP1. The Maglev power was  turned on and started acceleration.

The vac control screen positions indicators were checked for true position and annulies vent valves were opened.

RGA manual on/off switch was turned at the top of the RGA-head. Ubuntu copmuter was started at cc4 1.1e-6 Torr

The RGA communication was started with:  ssh c0rga from control room

The rga-script was started ./RGAset.py     This script turns on the filament, rs-232 and scan parameters etc

 

Vac -configuration: IFO-P1 at atm, RGA is pumped and running in background mode, all annulos at atm

 