40m Log, Page 333 of 354 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Mon May 18 20:16:20 2009, rana, Configuration, VAC, not it
|
Tue May 19 09:34:29 2009, steve, Configuration, VAC, IFO is not pumped & CRYO is being regenerated 
|
Tue May 19 16:18:45 2009, steve, Configuration, VAC, IFO pressure is 4.2e-7 Torr with CRYO pump
|
Wed May 20 01:41:19 2009, pete, Update, VAC, cryopump probably not it
|
Fri Jun 12 09:56:38 2009, steve, Configuration, VAC, new maglev installed
|
Fri Jun 12 15:34:49 2009, steve, Configuration, VAC, maglev is running
|
Mon Jun 15 15:17:33 2009, josephb, Steve, Configuration, VAC, Vacuum control and monitor screens
|
Mon Jun 15 16:31:36 2009, steve, Configuration, VAC, RGA is scanning new Maglev
|
Tue Jun 16 09:02:30 2009, steve, Configuration, VAC, new maglev RGA scan 
|
Tue Jun 23 10:06:03 2009, steve, Update, VAC, new maglev RGA scan at day6 
|
Tue Jun 23 15:19:42 2009, steve, Configuration, VAC, V1 is open
|
Wed Jun 24 09:21:19 2009, steve, Configuration, VAC, IFO RGA scan with Maglev & Cryo 
|
Thu Jun 25 10:28:58 2009, steve, HowTo, VAC, Cryopump is regenerated
|
Thu Jul 2 17:37:36 2009, steve, Update, VAC, V1 interlock test
|
Mon Jul 20 10:35:06 2009, steve, Update, VAC, UPS batteries replaced
|
Thu Aug 6 09:05:29 2009, steve, Update, VAC, large O-rings of vacuum envelope 
|
Fri Aug 7 09:50:57 2009, steve, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 16:11:11 2009, steve, rob, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 16:14:57 2009, rob, Omnistructure, VAC, UPS failed
|
Fri Aug 7 18:06:24 2009, rob, Omnistructure, VAC, opening V1 when PTP1 is broken
|
Fri Aug 7 19:34:40 2009, steve, Summary, VAC, UPS failed
|
Fri Aug 7 19:55:08 2009, steve, Summary, VAC, opening V1 when PTP1 is broken
|
Sat Aug 15 18:57:48 2009, rana, Update, VAC, UPS failed
|
Mon Aug 24 16:48:57 2009, steve, HowTo, VAC, new UPS installed
|
Fri Sep 4 16:09:26 2009, josephb, Summary, VAC, Rebooted RGA computer and reset RGA settings
|
Tue Sep 8 16:01:52 2009, steve, Configuration, VAC, RGA was separeted from IFO
|
Fri Oct 23 09:13:45 2009, steve, Summary, VAC, RGA scan 
|
Mon Dec 7 09:38:05 2009, Koji, Update, VAC, Vent started
|
Thu Dec 10 13:50:02 2009, Jenne, Update, VAC, All doors on, ready to pump
|
Thu Dec 10 15:18:55 2009, Jenne, Update, VAC, seisBLRMS
|
Thu Dec 10 16:51:35 2009, steve, Update, VAC, pumpdown will start tomorrow morning
|
Fri Dec 11 08:35:04 2009, steve, Configuration, VAC, pumpdown has started
|
Fri Dec 11 13:18:17 2009, Alberto, Configuration, VAC, pumpdown has started
|
Fri Dec 11 14:19:22 2009, Koji, Configuration, VAC, pumpdown has started
|
Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed 
|
Thu Jan 21 11:08:30 2010, kiwamu, steve, Update, VAC, Dry Pump replacement
|
Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve
|
Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed
|
Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back
|
Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF
|
Fri Feb 19 10:18:19 2010, Jenne, Update, VAC, The P1 vac pressure is almost to 3mTorr
|
Mon Feb 22 11:38:05 2010, joe, jenne and steve, Configuration, VAC, vacuum is back to normal
|
Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope
|
Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak
|
Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished
|
Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed
|
Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off
|
Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal
|
Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18
|
Fri Apr 16 17:46:54 2010, Koji, Update, VAC, Peeting mirrors aligned
|
|