40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m elog, Page 333 of 357  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject Text Attachments
  1613   Wed May 20 10:43:17 2009 steveOmnistructureEnvironmentaccelerometers sensitivity


   
        
            
 eq5m4.jpg 
  1614   Wed May 20 16:03:52 2009 steveOmnistructureEnvironmentusing OSEMs to look at seismic activityRana suggested using OSEM sensing voltages
as guide lines to look seismic activity.
As you see todays drilling and tumping
 eqOSEM5m4.jpg 
  1630   Thu May 28 18:41:26 2009 steveUpdatePSLthe saga of the chiller is endingI drained the water and removed side covers
from the Neslab RTE 140 refrigerated water
cooler unit this morning. The hoses to the
  
  1631   Fri May 29 18:57:09 2009 steveUpdatePSLthe laser is backSteve, Rob and Alberto
 
Starting capacitor 216 miroFarad
 laserisback.jpg 
  1651   Thu Jun 4 15:53:15 2009 steveUpdatePSLNPRO cooling flowrate adjustedThe Neslab chiller is working well. It's
temp display shows 20.0 C rock solid. Flow
meter rotating at 13.5Hz at the out put of
 needlevalve.jpg 
  1665   Wed Jun 10 09:06:12 2009 steveUpdatePEMparticle counts and turbulanceI moved the mobile HEPA filter from ITMX's
north door to ITMX-ISCT and covered it up
with a merostate tent to accommodate the
 parturbulnc.jpg 
  1666   Wed Jun 10 09:28:14 2009 steveUpdatePSLPMCThe PMC alarm was on this morning. It was
relocked at lower HV
The FSS_RMTEMP jumped 0.5 C so The
 pmctemphv.jpg 
  1671   Fri Jun 12 09:56:38 2009 steveConfigurationVACnew maglev installedJoe and Steve
 
The retrofitted Osaka 390 was installed
 m390pd.jpg 
  1672   Fri Jun 12 15:34:49 2009 steveConfigurationVACmaglev is running


   
        
            
  
  1674   Mon Jun 15 16:31:36 2009 steveConfigurationVACRGA is scanning new Maglev


   
        
            
  
  1677   Tue Jun 16 09:02:30 2009 steveConfigurationVACnew maglev RGA scanThe maglev fore line pressure is 3e-6 torr
at CC2 after 4 days of pumping. Varian turbo
V-70 is pumping on it through V4 and VM2
 nmagd4scan.jpgnmagd4.jpg 
  1690   Tue Jun 23 10:06:03 2009 steveUpdateVACnew maglev RGA scan at day6The Maglev is running for 10 days with
V1 closed.  The pressure at the RGA-region
is  at 2e-9 torr on CC4 cold cathode
 newmagscand6.jpgnmagpresd10.jpg 
  1691   Tue Jun 23 15:19:42 2009 steveConfigurationVACV1 is open


   
        
            
 V1_opennmag.jpg 
  1693   Wed Jun 24 09:21:19 2009 steveConfigurationVACIFO RGA scan with Maglev & Cryo


   
        
            
 nmagd1ifo.jpgnmagCryopres.jpg 
  1700   Wed Jun 24 17:08:16 2009 steveBureaucracySAFETYsurf student safetyThe 40m lab specific safety training is
done. The participants were
Stephanie Erickson, Clara Bennett,
  
  1701   Thu Jun 25 10:28:58 2009 steveHowToVACCryopump is regeneratedThe Cryopump's VC1 valve to IFO was closed
yesterday.
The compressor 
Helium pressure was 235 PSI. The cold head
 Creg.jpg 
  1716   Thu Jul 2 17:37:36 2009 steveUpdateVACV1 interlock testJoe, Alberto and Steve
We tested gate valve V1 interlock
by :
  
  1743   Tue Jul 14 14:54:19 2009 steveConfigurationComputersfb40m2 in 1Y6Alex and Steve,
SunFire x4600 ( not  MEGATRON
2 , it is fb40m2 ) and JetStor ( 16 x 1 TB
  
  1746   Wed Jul 15 08:59:30 2009 steveUpdateComputersfb40m The fb40m just went out of order with status
indicator number 8
It recovered on its own five minutes
  
  1763   Mon Jul 20 10:35:06 2009 steveUpdateVACUPS batteries replaced APC Smart-UPS (uninterruptible power
supply) batteries RBC12 replaced at 1Y8 vacuum
rack.
  
  1771   Tue Jul 21 18:46:47 2009 steveConfigurationComputerscomputers are downAll suspentions are kicked up. Sus dampings
and  oplev servos turned off.
c1iscey and c1lsc are down. c1asc
  
  1795   Mon Jul 27 09:34:07 2009 steveSummaryIOOAligning the mode cleaner


   
        
            
 20dtrend.jpg 
  1802   Wed Jul 29 11:15:06 2009 steveBureaucracySAFETYKevin receives safety trainingKevin Vigue, our high school summer student
went through the 40m specific safety traning
yesterday.
  
  1831   Wed Aug 5 07:33:04 2009 steveDAQComputersfb40m is down    
  1838   Wed Aug 5 16:33:50 2009 steveConfigurationPSLnew PSL output irisI installed an improvised version of PSL
output beam iris at the output periscope
last week.
 psliris.png 
  1840   Thu Aug 6 09:05:29 2009 steveUpdateVAClarge O-rings of vacuum envelopeThe 40m-IFO vacuum envelope doors are sealed
with dual viton O-rings and they are pumped
through the annulos lines.
 vacsor1.pngvacsor2.png 
  1852   Fri Aug 7 09:50:57 2009 steveConfigurationVACIFO pressure rose to 2.3 mTorrIFO pressure was 2.3 mTorr this morning,
The Maglev's foreline valve 
V4 was closed so P2 rose to 4 Torr. The Maglev
 tp2fpfail.jpg 
  1864   Fri Aug 7 19:34:40 2009 steveSummaryVACUPS failedThe Maglev is running on single phase 220V
and that voltage  was not interrupted.
TP1 was running undisturbed with V1 and V4
  
  1865   Fri Aug 7 19:55:08 2009 steveSummaryVACopening V1 when PTP1 is brokenThe swapped in 307 convectron gauge controller 
is very likely to have the  RS232 connection 
wired differently from the old one.
  
  1931   Thu Aug 20 09:16:32 2009 steveHowToPhotosControl Room Workstation desks lowered to human height


   
        
            
 P1040788.pngP1040782.pngP1040786.pngP1040789.pngP1040785.png 
  1937   Mon Aug 24 16:48:57 2009 steveHowToVACnew UPS installed


   
        
            
  
  1943   Tue Aug 25 18:42:42 2009 steveUpdatePSLreference cavity temp box temporarly out of order


   
        
            
  
  1948   Wed Aug 26 14:45:14 2009 steveUpdatePSLPSL-FSS_RCTEMP of 4 yearsThe reference cavity vacuum chamber temp
is plotted starting Feb 22 of 2005
This plot suggest that the MINCO
 refcavtemp.jpg 
  1952   Wed Aug 26 16:31:34 2009 steveUpdatePSLreference cavity temp box temporarly out of order


   
        
            
  
  1958   Thu Aug 27 16:14:28 2009 steveSummaryOMCburned photodiodeOld -pre 6/2009  LLO DCPD 3 mm od
GTRAN photodiode
 20090827_173252.jpg20090827_170802.jpg 
  1961   Fri Aug 28 15:30:15 2009 steveConfigurationGeneralPOX rfpd removedI removed POX rfpd to see how it is mounted
on its base. It is here on the work bench
just in case someone wants to use it the
  
  1962   Tue Sep 1 11:23:36 2009 steveUpdateGeneralelectrical groundI was told yesterday, that on Friday the
construction people accidentally ripped out
one of the 40m soil ground.....AND HOW MANY
 ground.JPG 
  1963   Tue Sep 1 13:52:06 2009 steveConfigurationGeneralPOX rfpd is back & needs alignment


   
        
            
  
  1965   Thu Sep 3 11:20:26 2009 steveUpdateGeneralelectrical ground in place


   
        
            
 Gs-n.JPGnewground.JPG 
  1974   Tue Sep 8 16:01:52 2009 steveConfigurationVACRGA was separeted from IFOThe RGA isolation valve VM1 was closed
since Aug 24, 2009  I installed the
new UPS that time.
 vm1closed.jpg 
  1980   Wed Sep 9 10:13:31 2009 steveBureaucracyGeneralthe use of FAX machine, scanner & toaster 
 You said that the use of FAXST
was forbidden for phds and graduate students.
  
  1987   Tue Sep 15 15:46:05 2009 steveUpdatePEMPEM and VACFSS_RMTEMP is moving up and  daily
fluctuations  are  less . 120 and
16 days plots are below.
 120dpem.jpg16dpem.jpg 
  1993   Fri Sep 18 16:26:02 2009 steveSummaryPSLNeslab chiller is OKRob found puddles of water very close to
the chiller during lunch time. We raised
the unit and took the side cover off. All
  
  2031   Thu Oct 1 08:37:43 2009 steveUpdateSUSsuspention damping restored and MZ HV stuckEarthquake 
of magnitude 5.0  shakes ETMY loose.
MC2 lost it's damping later.
 eq5oct1.jpg 
  2033   Thu Oct 1 10:23:00 2009 steveUpdatePSLMC2 damping restored again The EQ did not change the input beam
pointing. All back to normal, except MC2
wachdogs tripped again.
 mc2again.jpg 
  2097   Thu Oct 15 09:23:07 2009 steveSummaryLockingnever had it so goodAwesome 5 hrs of locking  Rob!  5hlock.jpg 
  2102   Fri Oct 16 10:15:02 2009 steveUpdateIOOIP ang & pos recenteredPointing stability of 4 days. Initial pointing
does not go through suspended optics. It
is launched  right after the Piezo Jena
 ip4d.jpg 
  2115   Mon Oct 19 11:00:52 2009 steveHowToSAFETY40m safety trainingKiwamu, Alex and Zach are practicing mandatory
IR-safety scan at the 40m-PSL
40m specific safety indoctrination
 safety_10_2009.JPG 
  2124   Tue Oct 20 10:46:18 2009 steveUpdateIOOclipping IP-ANG beam at ETMX chamberInitial pointing beam is clearly clipping
on 2" pick off mirror in  ETMX
vacuum chamber.
 PA200175.JPGPA200177.JPG 
  2132   Thu Oct 22 08:45:58 2009 steveUpdateIOOIP ang & pos recentered

    
        
 pointing1000.jpg 
ELOG V3.1.3-