40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
40m Log, Page 333 of 337
Not logged in
List
|
Find
|
Login
|
Help
New entries since:
Wed Dec 31 16:00:00 1969
Full
|
Summary
| Threaded |
Collapse
|
Expand
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Configuration
Update
Summary
HowTo
Bureaucracy
Omnistructure
Metaphysics
Frogs
16820 Entries
Goto page
Previous
1
,
2
,
3
...
332
, 333,
334
,
335
,
336
,
337
Next
Mon Jun 11 18:10:51 2018, Koji , Update, elog, Comparison of the analytical and finesse values of TMS and FSR.
Mon Jun 11 19:16:49 2018, keerthana, Update, elog, Comparison of the analytical and finesse values of TMS and FSR.
Mon Jun 11 22:05:03 2018, Koji, Update, elog, Comparison of the analytical and finesse values of TMS and FSR.
Mon Jun 11 22:18:18 2018, keerthana, Update, elog, Comparison of the analytical and finesse values of TMS and FSR.
Wed Jun 13 11:59:03 2018, keerthana, Update, elog, command line enabled code for frequency scanning
Thu Jun 21 13:24:00 2018, keerthana, Update, elog, The cavity scan data of June 20
Thu Jul 5 17:33:36 2018, keerthana, sandrine, Update, elog, Lights not working
Thu Jul 5 17:58:04 2018, keerthana, sandrine, Update, elog,
Thu Jul 12 14:06:39 2018, keerthana, Update, elog, Finesse and Analytical solution - Comparison
Fri Dec 7 19:42:47 2018, rana, Frogs, elog, can't upgrade DokuWiki because of PHP / SL7
Fri Mar 13 12:48:47 2020, Larry Wallace, Update, elog, Cert Renewal
Fri Apr 16 11:31:00 2021, rana, Update, elog, elog stuck ~10 AM today
Tue May 21 17:03:45 2013, Steve, Update, endtable upgrade, enclosure tops are sealed
Thu May 23 12:02:48 2013, Steve, Update, endtable upgrade, ETMY - oplev
Thu May 30 11:10:00 2013, Steve, Update, endtable upgrade, ETMY - oplev
Thu May 30 20:45:53 2013, Annalisa, Update, endtable upgrade, ETMY - oplev
Fri May 31 11:15:01 2013, Annalisa, Update, endtable upgrade, ETMY - Mode Matching for green - new calculation
Tue Jun 4 10:44:13 2013, Steve, Update, endtable upgrade, PI pzt holders are ready
Thu Jun 6 09:58:13 2013, Steve, Update, endtable upgrade, enclosure to chamber connection
Tue Jun 25 19:18:07 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation
Wed Jul 3 21:19:04 2013, gautam, Configuration, endtable upgrade, plan of action for PZT installation
Mon Jul 8 13:45:19 2013, gautam, Configuration, endtable upgrade, Driver board verification
Wed Jul 10 22:41:06 2013, gautam, Configuration, endtable upgrade, PZT Driver Board
Thu Jul 11 09:15:10 2013, Steve, Update, endtable upgrade, ETMY optable grounded
Mon Jul 15 11:51:18 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum
Mon Jul 15 13:51:17 2013, Koji, Configuration, endtable upgrade, DAC at 1Y4-Max Output and Power Spectrum
Mon Jul 15 15:54:20 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units
Mon Jul 15 17:20:43 2013, Jenne, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -with the right units
Mon Jul 15 17:59:31 2013, gautam, Configuration, endtable upgrade, DAC at 1Y4- Power Spectrum -6.4kHz bandwidth
Tue Jul 16 14:51:09 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-Modified notches
Thu Jul 18 19:09:08 2013, gautam, Configuration, endtable upgrade, QPD Calibration for PZT Calibration
Thu Jul 18 20:20:52 2013, gautam, Configuration, endtable upgrade, First mirror glued to PZT and mounted in modified mounts
Thu Jul 18 21:12:58 2013, gautam, Configuration, endtable upgrade, AI Board-D000186-All channels modified
Thu Jul 18 23:34:40 2013, gautam, Configuration, endtable upgrade, Coarse adjustment of PZT axes orientation in mount
Fri Jul 19 22:51:40 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
Fri Jul 19 23:35:31 2013, gautam, Configuration, endtable upgrade, Preliminary Calibration of PZT
Mon Jul 22 17:17:30 2013, annalisa, Update, endtable upgrade, End table picture
Tue Jul 23 00:51:46 2013, Koji, Update, endtable upgrade, End table picture
Tue Jul 23 19:37:08 2013, Annalisa, Update, endtable upgrade, End table picture
Tue Jul 23 20:41:40 2013, gautam, Configuration, endtable upgrade, Full range calibration and installation of PZT-mounted mirrors
Sun Jul 28 19:39:04 2013, Annalisa, Update, endtable upgrade, Picture
Mon Jul 29 13:39:25 2013, gautam, Configuration, endtable upgrade, PZT Driver Board-further changes
Mon Jul 29 21:57:45 2013, gautam, Configuration, endtable upgrade, Hardware installed at 1X9
Tue Jul 30 19:40:47 2013, gautam, Configuration, endtable upgrade, DAC-PZT Driver Board Output Signal Chain Tested
Tue Jul 30 19:44:05 2013, gautam, Configuration, endtable upgrade, Second mirror glued to PZT and mounted
Mon Aug 5 18:48:44 2013, gautam, Configuration, endtable upgrade, Full range calibration of PZT mounted mirrors for Y-endtable
Mon Dec 9 11:44:08 2013, Steve, Update, endtable upgrade, ETMY optable got new beam dump
Mon May 12 14:42:25 2014, steve, Update, endtable upgrade, optical table enclosure wall proposal and table at ETMY
Fri Sep 11 10:56:47 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
Tue Sep 15 16:49:08 2015, Steve, Update, endtable upgrade, ETMY optical table feedthrough
Goto page
Previous
1
,
2
,
3
...
332
, 333,
334
,
335
,
336
,
337
Next
ELOG V3.1.3-