Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back
|
Thu Jun 4 15:53:15 2009, steve, Update, PSL, NPRO cooling flowrate adjusted
|
Wed Jun 10 09:06:12 2009, steve, Update, PEM, particle counts and turbulance
|
Wed Jun 10 09:28:14 2009, steve, Update, PSL, PMC
|
Fri Jun 12 09:56:38 2009, steve, Configuration, VAC, new maglev installed
|
Fri Jun 12 15:34:49 2009, steve, Configuration, VAC, maglev is running
|
Mon Jun 15 16:31:36 2009, steve, Configuration, VAC, RGA is scanning new Maglev
|
Tue Jun 16 09:02:30 2009, steve, Configuration, VAC, new maglev RGA scan 
|
Tue Jun 23 10:06:03 2009, steve, Update, VAC, new maglev RGA scan at day6 
|
Tue Jun 23 15:19:42 2009, steve, Configuration, VAC, V1 is open
|
Wed Jun 24 09:21:19 2009, steve, Configuration, VAC, IFO RGA scan with Maglev & Cryo 
|
Wed Jun 24 17:08:16 2009, steve, Bureaucracy, SAFETY, surf student safety
|
Thu Jun 25 10:28:58 2009, steve, HowTo, VAC, Cryopump is regenerated
|
Thu Jul 2 17:37:36 2009, steve, Update, VAC, V1 interlock test
|
Tue Jul 14 14:54:19 2009, steve, Configuration, Computers, fb40m2 in 1Y6
|
Wed Jul 15 08:59:30 2009, steve, Update, Computers, fb40m
|
Mon Jul 20 10:35:06 2009, steve, Update, VAC, UPS batteries replaced
|
Tue Jul 21 18:46:47 2009, steve, Configuration, Computers, computers are down
|
Mon Jul 27 09:34:07 2009, steve, Summary, IOO, Aligning the mode cleaner
|
Wed Jul 29 11:15:06 2009, steve, Bureaucracy, SAFETY, Kevin receives safety training
|
Wed Aug 5 07:33:04 2009, steve, DAQ, Computers, fb40m is down
|
Wed Aug 5 16:33:50 2009, steve, Configuration, PSL, new PSL output iris
|
Thu Aug 6 09:05:29 2009, steve, Update, VAC, large O-rings of vacuum envelope 
|
Fri Aug 7 09:50:57 2009, steve, Configuration, VAC, IFO pressure rose to 2.3 mTorr
|
Fri Aug 7 19:34:40 2009, steve, Summary, VAC, UPS failed
|
Fri Aug 7 19:55:08 2009, steve, Summary, VAC, opening V1 when PTP1 is broken
|
Thu Aug 20 09:16:32 2009, steve, HowTo, Photos, Control Room Workstation desks lowered to human height    
|
Mon Aug 24 16:48:57 2009, steve, HowTo, VAC, new UPS installed
|
Tue Aug 25 18:42:42 2009, steve, Update, PSL, reference cavity temp box temporarly out of order
|
Wed Aug 26 14:45:14 2009, steve, Update, PSL, PSL-FSS_RCTEMP of 4 years
|
Wed Aug 26 16:31:34 2009, steve, Update, PSL, reference cavity temp box temporarly out of order
|
Thu Aug 27 16:14:28 2009, steve, Summary, OMC, burned photodiode 
|
Fri Aug 28 15:30:15 2009, steve, Configuration, General, POX rfpd removed
|
Tue Sep 1 11:23:36 2009, steve, Update, General, electrical ground
|
Tue Sep 1 13:52:06 2009, steve, Configuration, General, POX rfpd is back & needs alignment
|
Thu Sep 3 11:20:26 2009, steve, Update, General, electrical ground in place 
|
Tue Sep 8 16:01:52 2009, steve, Configuration, VAC, RGA was separeted from IFO
|
Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster
|
Tue Sep 15 15:46:05 2009, steve, Update, PEM, PEM and VAC 
|
Fri Sep 18 16:26:02 2009, steve, Summary, PSL, Neslab chiller is OK
|
Thu Oct 1 08:37:43 2009, steve, Update, SUS, suspention damping restored and MZ HV stuck
|
Thu Oct 1 10:23:00 2009, steve, Update, PSL, MC2 damping restored again
|
Thu Oct 15 09:23:07 2009, steve, Summary, Locking, never had it so good
|
Fri Oct 16 10:15:02 2009, steve, Update, IOO, IP ang & pos recentered
|
Mon Oct 19 11:00:52 2009, steve, HowTo, SAFETY, 40m safety training
|
Tue Oct 20 10:46:18 2009, steve, Update, IOO, clipping IP-ANG beam at ETMX chamber 
|
Thu Oct 22 08:45:58 2009, steve, Update, IOO, IP ang & pos recentered
|
Fri Oct 23 09:13:45 2009, steve, Summary, VAC, RGA scan 
|
Mon Oct 26 15:40:01 2009, steve, Update, PSL, laser power is down
|
Wed Oct 28 09:12:18 2009, steve, Update, PSL, PMC power on the rise?
|
|