  8870   Thu Jul 18 15:34:15 2013 Alex ColeUpdateElectronicsPD Frequency Response Update [Eric, Alex]
Our RF Switch arrived today, and
we mounted it in rack 1Y1 (1st attachment). 
 photo_3_(1).JPGphoto_1_(4).JPGphoto_2_(4).JPG 
  8940   Tue Jul 30 16:21:46 2013 Alex ColeUpdateElectronicsPhotodetector Input Modulation [Eric, Alex]
We successfully used our system to
modulate the input to a single photodetector.
  
  8947   Wed Jul 31 17:02:17 2013 Alex ColeUpdateElectronicsPreliminary Photodetector Frequency Reponse Measurements[Eric, Alex]
We used our setup from yesterday
(elog #8940) to measure transimpedance measurements
 REFL11.jpgREFL33.jpgREFL55.jpgAS55.jpg 
  8955   Thu Aug 1 18:55:20 2013 Alex ColeUpdateElectronicsPreliminary Photodetector Frequency Reponse Measurements

    

       
            
 POX11.jpgPOX11fit.jpg 
  8971   Tue Aug 6 12:43:23 2013 Alex ColeConfigurationElectronicsAS Table and Rack 1Y1 AdditionsFor the photodetector frequency response
project, I finished the construction of our
baluns chassis and mounted it in rack 1Y1
 photo_1_(5).JPGphoto_2_(5).JPG 
  8979   Wed Aug 7 15:51:53 2013 Alex ColeConfigurationElectronicsRF Switch ChangeFor the photodetector frequency response
project, our new RF Switch Chassis (NI pxie-1071)
arrived today. I took the switches out of
 photo_(2).JPG 
  9004   Tue Aug 13 11:40:19 2013 Alex ColeSummaryElectronicsRFPD Demod Filter Frequency Response Measurement For the RF PD Frequency Response
Measurement project, we get each PD signal
from the "PD RF Mon" output of
 photo_(3).JPGtest.jpg 
  9005   Tue Aug 13 11:54:40 2013 Alex ColeHowToElectronicsRF PD Fiber-Coupled Laser OperationThis post pertains to the fiber-coupled
diode laser mounted in rack 1Y1.
To turn the laser on, first turn
 photo_(4).pdf 
  9006   Tue Aug 13 13:30:41 2013 Alex ColeConfigurationElectronicsCable Routing I routed cables (RG405 SMA-SMA) from
several demodulator boards in rack 1Y2 to
the RF Switch in rack 1Y1 using the overhead
 photo_(6).JPG 
  9059   Fri Aug 23 21:01:38 2013 Alex ColeHowToElectronicsAutomated Photodetector Frequency Response System This post describes how to use the
Automated Photodetector Frequency Response
System.
  
  8795   Wed Jul 3 11:07:17 2013 AlexSummary Photodetector Characterization [Alex, Koji]
We characterized Koji's BBPD
MOD for REFL165 (see attachment).
 BBPD_PCB.pdftransimpedance_measurement.pdf 
  8806   Mon Jul 8 16:27:49 2013 AlexUpdate Planned rack additionsAlex and Eric
For the photodetector frequency response
automation project, we plan to add modules
 Annotated_Rack_1y1.pdf 
  8829   Thu Jul 11 12:00:50 2013 AlexUpdate Planned rack additions[Eric, Alex]
We mounted our Laser Module and Laser
Power Source in rack 1y1. We plan to add
 Annotated_Rack_1y1_-_update.pdf 
  8849   Mon Jul 15 16:44:46 2013 AlexUpdateOMCOMC North Safety [Eric Alex]
We are planning on testing our laser
module soon, so we have added aluminum foil
 photo_2_(1).JPG 
  8850   Mon Jul 15 16:51:37 2013 AlexConfiguration Planned AS Table addition [Eric, Alex]
We are planning to add our reference
PD to the southern third of the AS Table
 AS_Table_Ref_PD_Addition.pdf 
  1947   Tue Aug 25 23:16:09 2009 Alberto, ranaConfigurationComputerselog moved in to the cvs pathIn nodus, I moved the elog from /export
to /cvs/cds/caltech. So now it is in the
cvs path instead of a local directory on
  
  2887   Thu May 6 17:47:01 2010 Alberto, kiwamu, Jc The 3rd (aka The Drigg)OmnistructureTMIMinutes from the Lab Organization Commitee meetingToday we met and we finally come up with
a lot of cool, clever, brilliant, outstanding
ideas to organize the lab.
  
  3049   Fri Jun 4 11:32:51 2010 Alberto, kiwamuUpdateIOOMC MMT1 Mirror Tests[Alberto, Kiwamu]
Last Wednesday,
we measured the beam profile after the MC
mode matching telescope n.1 (MMT1). We found
 MCMMT1spareOpticsTestSetup.png 
  1193   Thu Dec 18 19:15:54 2008 Alberto, YoichiConfigurationSUSMode Cleaner Cavity Alignment[quote]This morning I found the MC locked
to the 10 mode. When I locked it on the 00
mode, it was unstable and eventually it always
  
  1195   Fri Dec 19 11:29:16 2008 Alberto, YoichiConfigurationMZMZ Trans PDLately, it seems that the matching of the
input beam to the Mode Cleaner has changed.
Also, it is drifting such that it has become
  
  2477   Tue Jan 5 10:26:32 2010 Alberto, SteveOmnistructureEnvironmentAdded new wall cable-rackswe hung two new WALL cable racks.
One is on the pillar next to the Sp table,
the other is next to the PSL computer rack.
 DSC_1068-1.JPGDSC_1070-1.JPG 
  2106   Fri Oct 16 16:44:39 2009 Alberto, SanjitUpdateComputerselog restartedThis afternoon the elog crashed. We just
restarted it.
  
  1162   Tue Nov 25 18:38:03 2008 Alberto, RobUpdatePSLMC Periscope AlignmentThis morning when I came in I found the MC
cleaner unlocked and the autolocker script
could not lock it. The reflected beam was
  
  1166   Tue Dec 2 17:56:56 2008 Alberto, RanaConfigurationPSLMC AlignmentIn the attempt to maximize the Mode Cleaner
transmission and minimize the reflection
from the steering mirrors of the MC periscope,
  
  1883   Mon Aug 10 20:49:13 2009 Alberto, RanaUpdatePSLPMC Mode Matching Lenses TuningRana, Alberto
This afternoon we tried to improve
the mode matching of the beam to the PMC.
  
  2468   Wed Dec 30 18:01:03 2009 Alberto, RanaUpdateGeneralAll watchdogs tripped this morning


   
        
            
  
  3029   Wed Jun 2 01:47:28 2010 Alberto, KiwamuUpdateIOOmode measurement of new input opticsThe mode
profile of the new input optics was measured.
 afterMMT1.pngbeam_profile.pngMMT1_.dat.zipinside_vac_2.png 
  3046   Thu Jun 3 14:40:28 2010 Alberto, KiwamuUpdateIOOmode measurement of new input optics


   
        
            
  
  1261   Fri Jan 30 17:30:31 2009 Alberto, JosephbConfigurationComputersNew computer Ottavia set upAlberto, Joseph,

Today we installed the computer that some
  
  2490   Fri Jan 8 20:13:49 2010 Alberto, JoBConfigurationComputersThe 40m Kaiser Permanent Reboot MarathonThis morning after Alex and Jo's tinkering
with Megatron the RFM network crashed and
it brought down also some computers. The
 pasadena_marathon.JPG 
  2971   Fri May 21 16:41:38 2010 Alberto, JoUpdateComputersIt's a boy!Today the new Dell computer for the GSCS
(General SURF Computing Side) arrived.
We put it together and hooked it
  
  2520   Mon Jan 18 09:44:36 2010 Alberto, BobOmnistructureEnvironmentNo rain water infiltrations so farIt has rained continuously for the last
24 hours. Bob walked through the lab looking
for possible water infiltrations. The floor
  
  131   Wed Nov 28 16:18:15 2007 AlbertoMetaphysicsEnvironmentso clean you can eat on itI tidied up the desks in the lab, brought
the Spectrum Analyzers back to the Salumeria
(you don't want to know about that), sorted
 DSC_0180.JPGDSC_0181.JPG 
  142   Thu Nov 29 18:10:13 2007 AlbertoHowToComputer Scripts / ProgramsGPIB ScriptsI've spent a lot of time trying to configurate
the GPIB-USB interface for the HP4195. After
installing 1) the Agilent libraries, 2) the
  
  246   Thu Jan 17 18:22:14 2008 AlbertoUpdateElectronicsRF Monitor Band-pass FilterAfter we finalized the schematic for the RF
monitor board based on buffered LC resonators,
on Richard Abbott's suggestion to avoid the
 RF166Mhz.pngChebyshevb.pngChebyshev2b.png 
  248   Fri Jan 18 11:53:50 2008 AlbertoUpdateElectronicsRF Monitor Band-pass FilterThe response is asymmetric and on the left
side of the peak, we have at least 33dB within
33Mhz, which is enough for all the frequencies.
 Chebyshevb.png 
  268   Fri Jan 25 15:53:59 2008 AlbertoUpdateElectronics40 dB from the 3rd order ChebyschevI managed to tune the 7 knobs in the 3rd order
Chebyshev bandpass filter obtaining the tranfer
function attached to this entry. We have
 166MhzElog.png 
  285   Wed Jan 30 11:49:30 2008 AlbertoSummaryElectronicsRF monitor's filters final schematics and transfer functionsThese are the final schematics for the 6th
order Chebyshev filters of the RF monitor
board. I'm also attaching the TF as I measured.
 8x 
  314   Wed Feb 13 11:41:00 2008 AlbertoUpdateElectronicsSome characterization of the RF Monitor Box (StocMon)I'm attaching a table with some measurements
and the power spectrum from the pd to help
evaluate the numbers.
 CircuitCharacterization.pngalberto.spectrum3.png 
  321   Mon Feb 18 12:04:39 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)I put the amplifiers next to the monitor on
the PSL table, layed the power and the RF
SMA cables out to the rack. I'm powering
 DSC_0443.JPG 
  331   Fri Feb 22 08:29:07 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)[quote]I put the amplifiers next to the monitor
on the PSL table, layed the power and the
RF SMA cables out to the rack. I'm powering
  
  332   Fri Feb 22 08:33:18 2008 AlbertoUpdateElectronicsRF Monitor (StocMon)[quote]I put the amplifiers next to the monitor
on the PSL table, layed the power and the
RF SMA cables out to the rack. I'm powering
  
  545   Thu Jun 19 15:52:06 2008 AlbertoConfigurationComputersMeasure of the current absorbed by the new Megatron ComputerTogether with Rich Abbot, sam Abbot and I
measured the current absorbed by the new
Megatron computer that we installed yesterday
  
  555   Mon Jun 23 21:51:19 2008 AlbertoUpdateGeneralArm Cavity Length MeasurementWe measured the arm cavity lengths sweeping
the ETM mirror position and looking at the
reflected demodulated output. We excited
 40mLengthMeasure.pdf 
  621   Wed Jul 2 06:46:05 2008 AlbertoConfigurationGeneralNPRO on to warm upThis morning I turned on the NPRO on the AP
table so that it can warm up for a few hours
before I start using it today.
  
  627   Wed Jul 2 19:15:52 2008 AlbertoUpdateGeneralStatus of the alignment of the NPRO beam for the Absolute Length MeasurementToday I've tried to bring the frequency of
the NPRO laser close enough to that of the
IFO beam so that the beat between the two
 DSC_0156.JPGDSC_0158.JPG 
  634   Thu Jul 3 18:48:09 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I adjusted the alignment of the flipper mirror
as suggested by Koji making the two beam
spots match. I also aligned all the IFO mirrors
  
  637   Mon Jul 7 11:22:02 2008 AlbertoUpdateGeneralBeats of the two lasers in the absolute length measurement observed I didn't post a screenshot from the RF SA
because I had troubles with the interface
with the computer (unfortunately the network
  
  643   Mon Jul 7 19:15:38 2008 AlbertoUpdateGeneralOptics alignement on the ABS length experimentToday I started setting up the PLL instruments
to lock the frequency of the NPRO beam to
the IFO beam. with no need of a new alignment
  
  656   Thu Jul 10 19:12:07 2008 AlbertoUpdateGeneralabs cavity length measurement experimentYesterday morning, when I started, I found
the IFO beam on a different position and
the beam spot at the AS port looked very
  
ELOG V3.1.3-