40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 331 of 349  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Wed Jan 19 12:56:52 2022, Paco, Summary, BHD, AS4 OSEMs installation 
    Reply  Thu Jan 13 12:29:27 2022, Anchal, Summary, BHD, AS4 LR magnet broke 
    Reply  Fri Jan 21 16:40:10 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf
    Reply  Mon Jan 24 17:12:27 2022, rana, Update, BHD, AS4 Input Matrix Diagonalization performed.  
    Reply  Mon Jan 24 20:48:48 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  
Entry  Thu Apr 5 06:27:51 2012, kiwamu, Update, LSC, AS110 sideband monitor installed 
    Reply  Wed Apr 27 21:08:08 2011, rana, Update, LSC, AS11 AS11.png
    Reply  Fri Jan 28 16:35:18 2022, Anchal, Summary, BHD, AS1, PR2 and PR3 set to trigger free swing test 
    Reply  Wed Jan 19 18:15:34 2022, Yehonathan, Update, BHD, AS1 resurrection AS1_roll_balance2.pngAS1_magnet_heigh2.pngFreeSwingingSpectra.pdfIMG_6324.JPG
    Reply  Thu Jan 20 12:10:51 2022, Yehonathan, Update, BHD, AS1 resurrection FreeSwingingSpectra.pdfFreeSwingingSpectra_div_20mV.pdfFreeSwingingSpectra_div_50mV.pdf
Entry  Thu Mar 10 10:05:49 2022, Paco, Update, SUS, AS1 free swing test SUS_Input_Matrix_Diagonalization.pdf
    Reply  Thu Nov 3 20:07:01 2022, Anchal, Summary, BHD, AS1 coil balancing required 
    Reply  Thu Apr 21 20:33:31 2022, Koji, Update, BHD, AS1 UR OSEM problem localized in the chamber Screenshot_from_2022-04-21_20-13-13.png
    Reply  Fri Apr 22 12:03:09 2022, Tega, Update, BHD, AS1 UR OSEM problem localized in the chamber 
    Reply  Tue Jan 11 18:40:25 2022, Anchal, Summary, BHD, AS1 Sat Amp has a PCB issue signal-2022-01-11-184917.jpeg
    Reply  Thu Jan 13 09:48:41 2022, Anchal, Summary, BHD, AS1 Sat Amp fixed signal-2022-01-13-094823_001.jpegsignal-2022-01-13-094823_002.jpeg
    Reply  Mon Jan 10 17:04:47 2022, Anchal, Update, BHD, AS1 Sat Amp CH2 had offset 
    Reply  Thu Jan 13 12:24:08 2022, Anchal, Summary, BHD, AS1 SD and LR magnets broke 
    Reply  Fri Nov 2 20:41:53 2012, Jenne, Update, Alignment, AS, REFL camera shots AS_2Nov2012.pngREFL_2Nov2012.png
    Reply  Fri Nov 2 21:40:04 2012, Manasa, Update, Alignment, AS, REFL camera shots 
    Reply  Mon Nov 5 09:53:35 2012, Jenne, Update, Alignment, AS, REFL camera shots AS_5Nov2012.pngREFL_5Nov2012.pngIPPOS_IPANG_weekend_trend.png
Entry  Wed Nov 25 22:59:42 2015, yutaro, Update, LSC, AS table optics realignment 
Entry  Thu Nov 8 20:11:54 2012, Jenne, Update, Alignment, AS steering moved out of POY's way, 2 green beams onto PSL table AS_8Nov2012.pngREFL_8Nov2012.png
Entry  Thu Jun 4 01:32:20 2009, rob, Configuration, LSC, AS port mode scan modes.png
Entry  Wed Jan 17 23:36:12 2018, johannes, Configuration, General, AS port laser injection PSLbeat.svg.pngASpath.svg.png
    Reply  Wed Apr 18 22:46:23 2018, johannes, Configuration, General, AS port laser injection ASpath.svg.pngpower_out_fluctuation_DC.pngpower_out_fluctuation_AC_zoom.png
    Reply  Thu Apr 19 01:04:00 2018, gautam, Configuration, General, AS port laser injection 
    Reply  Thu May 3 10:40:43 2018, johannes, Configuration, General, AS port laser injection mm_solution_AStable.pngAStable_beampath.pdf
    Reply  Thu May 3 12:10:12 2018, gautam, Configuration, General, AS port laser injection 
    Reply  Wed May 23 00:45:18 2018, johannes, Configuration, General, AS port laser injection faraday_location.pdf
Entry  Tue May 3 21:05:23 2022, yuta, Update, BHD, AS path alignment, removing a lot of green stuff 7x
    Reply  Thu May 12 19:55:01 2022, Tega, Update, BHD, AS path alignment AS.JPGOMCchamber.JPG
    Reply  Tue Aug 22 16:56:54 2017, johannes, Summary, General, AS laser existing components inventory 
    Reply  Fri Oct 14 18:33:55 2016, gautam, Update, General, AS clipping investigations 7x
Entry  Wed Feb 20 19:20:50 2013, Evan, Update, Alignment, AS camera alignment 
    Reply  Tue Sep 18 22:06:21 2012, Mike J., Update, Electronics, AS beam scan plots and chi-squared beam_width.pyH_raz.pngV_raz.png
    Reply  Fri Sep 14 01:35:55 2012, Mike J., Update, Electronics, AS beam scan PLOTS H_razor.jpegV_razor.jpeg
Entry  Tue Sep 11 17:17:51 2012, Eric Q., Mike J., Configuration, Electronics, AS beam scan 
    Reply  Wed Sep 12 20:08:51 2012, ericq, Update, Electronics, AS beam scan 
    Reply  Thu Sep 13 19:59:43 2012, Mike J., Update, Electronics, AS beam scan 
Entry  Tue Mar 26 00:06:37 2013, Jenne, Update, Locking, AS beam put back on PD 
    Reply  Mon Oct 17 22:45:16 2016, gautam, Update, General, AS beam centered on all OMs 7x
Entry  Wed Jun 27 16:23:12 2012, yuta, Update, IOO, AS and REFL on AP table aligned 
    Reply  Tue Nov 6 17:07:04 2012, jamie, Update, Alignment, AS and REFL tmp6oTENk.pngtmplamEtZ.png
Entry  Mon Nov 28 20:14:27 2022, Anchal, Update, ASC, AS WFS proposed path to IMC WFS heads F5B115E5-885F-463C-9645-BB2EB73B6144_1_201_a.jpeg
    Reply  Sat Jan 21 15:32:40 2023, Anchal, Update, ASC, AS WFS path nominally set PXL_20230121_231740878.NIGHT.jpg
    Reply  Mon Jan 23 20:50:58 2023, Anchal, Update, ASC, AS WFS path beam profiled WFSPathBeamProfile.pdfASFocPathBeamProfile.pdfASPathBeamProfile.pdf
    Reply  Tue Jan 24 21:04:59 2023, Anchal, Update, ASC, AS WFS path beam profiled ASBeamFocusingLens.png
    Reply  Fri Feb 3 12:50:47 2023, Anchal, Update, ASC, AS WFS model changes and phase calibration YARM_WFS_MASTER.pngPXL_20230203_211014833.jpg
Entry  Mon Aug 16 23:30:34 2021, Paco, Update, CDS, AS WFS commissioning; restarting models 
ELOG V3.1.3-