  7056   Tue Jul 31 08:01:22 2012 steveUpdateVACcc1 switched

Quote:

Quote:

Our cold cathode 423 gauges are 10 years old. They get insulated by age and show no ionization current.  We should replace them at the next vent. I'm buying 4 at $317ea

 

 We have two CC1 gauges at the pump spool. One is in vertical position and the spare is in horizontal. Today I switched the cable from vertical to horizontal CC1

This one is reading higher pressure. It is an old dirty gauge. It may trigger the RGA protection when it's reading goes above 1e-5 torr

The real pressure is 2e-6 torr

 cc1h spikes closed VM1 last night. VM1 is opened.

Attachment 1: cc1h1d.png
cc1h1d.png
  7089   Mon Aug 6 10:53:32 2012 steveUpdateVACstatus: vauum normal

 

 The power outage did not have any effect on the vacuum system.  I had to open VM1 to the RGA because of flaky CC1 cold cathode gauge fluctuations.

We are running on the vertically positioned CC1 again.

Note: rga scans with closed VM1 are back ground scans.

Attachment 1: CCgauges.png
CCgauges.png
  7272   Fri Aug 24 16:03:39 2012 SteveUpdateVACVacuum related work at atm

Vacuum related work at atmosphere:

Atm1,  Check all chamber dog clamps tightness with torque wrench,

Atm2,  Replace old, black molibdenum disulfite bolts -nut with new silicon bronze nuts and clean SS bolts.

Atm3,  Replace CC1 cold cathode gauges: horizontal and vertical.

Attachment 1: IMG_1563.JPG
IMG_1563.JPG
Attachment 2: IMG_1565.JPG
IMG_1565.JPG
Attachment 3: IMG_1566.JPG
IMG_1566.JPG
  7278   Sun Aug 26 20:58:21 2012 JenneUpdateVACDon't vent!!!!

[Koji, Jenne]

Steve, do not vent tomorrow morning!  We are still not prepared, and will not finish the preparation tonight.  Hopefully we can finish the prep tomorrow, and then vent Tues.

 

Things we need to do before the vent:

MC spots centered [Jenne, tonight]

Use PZT2, BS to hit ~center of ETMs.

Realign arms, measure spot positions.

Make sure BS, ITMs are good - we want a good AS spot since we'll likely have to adjust some AS optics while we're inside

Insert attenuation optics, recover MC trans by rotating PBS cube to translate beam slightly

  7293   Tue Aug 28 09:37:33 2012 SteveUpdateVACRGA scan at day 56

RGA scan,  Maglev pumping speed at day 56

CC1 is dying. CC4 is real.

 

Attachment 1: pd72m56d.png
pd72m56d.png
Attachment 2: pd72m56dpr.png
pd72m56dpr.png
  7300   Tue Aug 28 17:59:03 2012 JenneUpdateVACVENT: GO!

I have turned of the high voltage supplies for PZT1 and PZT2.  The OMC PZT high voltage supplies were already off, since we aren't really using them currently.

I have closed the PSL shutter, but have not put in a manual extra beam dump yet.

All systems go for vent!

Steve - EricQ will be here around 8am to help with the vent.

  7306   Wed Aug 29 11:47:21 2012 ericqUpdateVACVenting

 [Steve, Eric]

I've been helping Steve vent this morning. The following things were done (from Steve's logbook):

  • Particle counts: 0.5 micron particles, 4200 counts per cubic ft
  • Vertex crane drive checked to be ok
  • Optical Levers set for local damping only
  • Saved some screens
  • PSL shutter and green shutters closed
  • HV Off checked, JAM nuts checked
  • Vac: Close V1, VM1, ans - VA6, open VM3 - RGA, cond: chamber open mode
  • 8AM: VV1 open to N2, regulator set  to 14 psi
  • 8:23AM: 35psi Instrument grade Air

(At this point, I took over the air canisters, while Steve made preparations around the lab. 

  • 9:00AM: 2nd air cylinder, 14 psi 
  • 9:40AM: 3rd air cyl
  • 10:20AM: 4th air cyl
  • 11:00AM: 5th air cyl

With the 5th cylinder, we began approaching 1 atm, so we slowed the regulator down to 5psi. Around 750 torr, Steve opened VV1 to air.

According to Steve, we will be at atmospheric pressure at  ~12:30pm.

  7307   Wed Aug 29 12:46:49 2012 SteveUpdateVACVent completed in 4 hrs

 

ANTS ALERT please watch out for ants. We have them in the control room.

 

 

Attachment 1: vent72.png
vent72.png
Attachment 2: beforeVentOpl.png
beforeVentOpl.png
Attachment 3: beforeVent.png
beforeVent.png
  7321   Thu Aug 30 19:08:08 2012 JenneUpdateVACDogs on BS, ITM chambers checked

I tightened as many of the dog clamps on the bottom of the BS, ITMX and ITMY chambers as I could find.  I used a torque wrench at 45 ft-lbs.  Some of the bolts of the dogs were too long, and I couldn't find an extender thing to accommodate the bolt so I could reach the nut.  None of the bolts moved that I was able to reach.

Steve, we're not doing final final alignment today (we will do it tomorrow), so please go around and double-check my work by checking all of the dogs first thing in the morning.  Thanks.

  7327   Fri Aug 31 10:24:36 2012 SteveUpdateVACchamber dog clamps checked

Quote:

I tightened as many of the dog clamps on the bottom of the BS, ITMX and ITMY chambers as I could find.  I used a torque wrench at 45 ft-lbs.  Some of the bolts of the dogs were too long, and I couldn't find an extender thing to accommodate the bolt so I could reach the nut.  None of the bolts moved that I was able to reach.

Steve, we're not doing final final alignment today (we will do it tomorrow), so please go around and double-check my work by checking all of the dogs first thing in the morning.  Thanks.

 Almost all chamber dog clamps on the floor checked. There are a few exception where it is impossible to to get to the nut. 

Only the OOC nuts turned little bit. So our elastomer discs are holding up well. This means that the chamber anchoring to the floor is good.

  7342   Tue Sep 4 20:25:22 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

  7343   Wed Sep 5 09:50:25 2012 SteveOmnistructureVACbetter in-air "lite" access connector needed

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

Attachment 1: IMG_1612.JPG
IMG_1612.JPG
  7344   Wed Sep 5 10:50:15 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 Can we see the full design?  If we can't lock the mode cleaner with this thing on then it's really of no use.  We want it to be equivalent to the light doors, but allow us to keep the mode cleaner locked.  That's the most important aspect.

  7345   Wed Sep 5 13:11:43 2012 jamieOmnistructureVACbetter in-air "lite" access connector needed

Quote:

Quote:

Quote:

We really need something better to replace the access connector when we're at air.  This tin foil tunnel crap is dumb.  We can't do any locking in the evening after we've put on the light doors.  We need something that we can put in place of the access connector that allows us access to the OMC and IOO tables, while still allowing IMC locking, and can be left in place at night.

 It is in the shop. It will be ready for the next vent. Koji's dream comes through.

 Can we see the full design?  If we can't lock the mode cleaner with this thing on then it's really of no use.  We want it to be equivalent to the light doors, but allow us to keep the mode cleaner locked.  That's the most important aspect.

 It also needs to be wide enough that the MMT beam can go through, so that we can not only lock the MC, but also work on the rest of the IFO.

  7432   Mon Sep 24 16:59:31 2012 JenneUpdateVACDoors on, ready to pump

[The 40m Family]

The access connector and all heavy doors are back on. 

Jamie put the regular viton EQ stops back on PRM, since he had to adjust the distance between the EQ stops and the PRM anyway.  Jamie also waved an IR card near the IPANG steering mirrors in ETMY, but it was not possible to take a good photo.  Jamie certifies that the beam is centered on both of those 2 optics.

I have centered IPPOS and IPANG QPDs. 

All oplevs need a little realignment, especially ETMY, which had it's lens removed (Rana has a Wall of Shame photo of this, which is why it was removed by him).  Steve will look into this tomorrow, after he starts pumping.

I have turned off all PZT high voltage supplies for in-vac PZTs: The input PZTs, the output PZTs, and the OMC PZTs (which weren't on, but I confirmed they were off).

I have also prepared the 3 low-power items for high power: MC refl's path was changed back to regular BS, AS camera was moved to its nominal position, and IPPOS has its ND filters back.  MC refl and the AS camera will need to be realigned once we're actually at high power tomorrow afternoon.

Long vent, but good work everyone.

  7434   Mon Sep 24 17:47:05 2012 SteveUpdateVAC ready to pump

  The IFO will be at atmosphere  overnight. The annuloses are pumped down. The access connector jam nuts are tightened to 45 ft/lbs

Actual pumpdown will start tomorrow morning.

  7438   Tue Sep 25 17:21:01 2012 SteveUpdateVACpumpdown completed

 IFO P1= 1mTorr,   CC1 = 5e-4 Torr.  The IFO is ready for work. Be free to open the shutter and turn on HV

Jenne will double check the MC -REFL path for 1W power.  There is a manual block on the PSL table.

Atm1,  Pirani gauge at 9 h 10 min

Atm2, Pump configuration of pd#73 at 9h 35 min

 

Attachment 1: pd73.png
pd73.png
Attachment 2: pd73b.png
pd73b.png
  7441   Wed Sep 26 11:03:04 2012 SteveUpdateVACpumpdown completed

 The new cold cathode gauge CC1 is in place. We were at atmosphere for 28 days ......more later

 

Attachment 1: 40mpd73md1.png
40mpd73md1.png
Attachment 2: 28datm.png
28datm.png
  7454   Mon Oct 1 09:02:17 2012 SteveUpdateVACpumpdown reached vacuum normal

Quote:

 The new cold cathode gauge CC1 is in place. We were at atmosphere for 28 days ......more later

 

 cc1 = 2.3e-5 Torr at day 6 vacuum normal

Attachment 1: pd73md6.png
pd73md6.png
Attachment 2: pd73md6b.png
pd73md6b.png
  7461   Tue Oct 2 09:13:16 2012 SteveUpdateVACRGA scan at day 7

Quote:

Quote:

 The new cold cathode gauge CC1 is in place. We were at atmosphere for 28 days ......more later

 

 cc1 = 2.3e-5 Torr at day 6 vacuum normal

 

Attachment 1: pd73md7.png
pd73md7.png
  7491   Fri Oct 5 14:40:55 2012 SteveUpdateVACRGA scan after power outage

Quote:

All the front end machines are back up after the outage.  It looks like none of the front end machines came back up once power was restored, and they all needed to be powered manually.  One of the things I want to do in the next CDS upgrade is put all the front end computers in one rack, so we can control their power remotely.

c1sus was the only one that had a little trouble.  It's timing was for some reason not syncing with the frame builder.  Unclear why, but after restarting the models a couple of times things came back.

There's still a little red, but it mostly has to do with the fact that c1oaf is busted and not running (it actually crashes the machine when I tried to start it, so this needs to be fixed!).

 The RGA was not effected by the short power outage.

Attachment 1: afterpoweroutaged10.png
afterpoweroutaged10.png
Attachment 2: pd73m10d.png
pd73m10d.png
  7545   Mon Oct 15 08:12:45 2012 SteveUpdateVACblank vac monitor

VME crate  blew its fuse and the fuse housing is hard to access.

Attachment 1: blankvac.png
blankvac.png
  7547   Mon Oct 15 13:07:51 2012 jamieUpdateVACvacuum VME crate broken, replaced, minor vacuum mayhem ensues

Steve and I managed to access the fuse in the vacuum VME crate, but replacing it did not bring it back up.  We decided to replace the entire crate.

We manually checked that the most important valves, VC1, VM1 and V1, were all closed.  We disconnected their power so that they would automatically close, and we wouldn't have to worry about them accidentally opening when we rebooted the system.

We noted where all the cables were, disconnected everything, and removed the crate.  We noted that one of the values switched when we disconnected one of the IPC cables from a VME card.  We'll note which one it was in a followup post.  We thought that was a little strange, since the VME crate was completely unpowered.

Anyway, we removed the crate, swapped in a spare, replaced all the cards and connections, double checked everything, then powered up the crate.  That's when minor chaos ensued.

When the system came back online after about 20 seconds, we heard a whole bunch of valves switching.  Luckily we were able to get the medm screens back up so that we could see what was going on.

Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr.  All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open.  One of the roughing pumps was also turned on.  Other stuff we didn't notice?  Bad.

We ran around and manually unplugged all of the ION pump valves, since I couldn't immediately pull up the vacuum control screen.  Once that was done and we could see that the main volume was closed off we went back to figure out what was going on.

We got the medm vacuum control screen back (/cvs/cds/caltech/medm/c0/ve/VacControl_BAK.adl.  really??)  There was a lot of inconsistency between the readback states of the valves and the switch settings.  Toggling the switches seemed to bring things back in line.  At this point it seemed that we had control of the system again.  The epics readings were consistent with what we were seeing in the vacuum rack.

We went through and closed everything that should have been closed.  The line pressure between the big turbo pump TP1 and the rest of the pumps was up at atmosphere, 700 Torr.  We connected the roughing pumps and pumped down the lines so that we could turn the turbos back on.  Once TP2 and TP3 were up to speed, we turned on TP1 and opened V1 to start pumping the main volume back town.   The main volume is at 7e-4 Torr right now.

 

So there are a couple of problems with the vacuum system.

  • Why the hell did valves open when we rebooted the VME crate?  That's very bad.  That should never happen.  If the system is set to come up to an unsafe state that needs to be fixed ASAP.  The ION pump valves should never have opened.  Nor the annulus valves.
  • Why were the switches and the readbacks showing different states?
  • Apparently there is no control of the turbo pumps through MEDM.  This should be fixed.

I connect belledona, the laptop at the vacuum station to the wired network, so that it's connection would be less flaky.

 

  7549   Mon Oct 15 17:08:01 2012 SteveUpdateVACvacuum is back with some disabled valves

Quote:

Quote:

Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr.  All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open.  One of the roughing pumps was also turned on.  Other stuff we didn't notice?  Bad. 

 Several of the suspensions were kicked pretty hard (600+ mV on some sensors) as a result of this quick vent wind.  All of the suspensions are damped now, so it doesn't look like we suffered any damage to suspensions.

CLOSE CALL on the vacuum system:

Jamie and I disabled V1, VM2 and VM3 gate valves by disconnecting their 120V solenoid actuator before the swap of the VME crate.

The vacuum controller unexpectedly lost control over the swap as Jamie described it. We were lucky not to do any damage! The ion pumps were cold and clean. We have not used them for years so their outgassing possibly  accumulated to reach ~10-50 Torr

I disconnected_ immobilized and labelled the following 6 valves:  the 4 large ion pump gate valves and VC1,  VC2  of the cryo pump. Note: the valves on the cryo pump stayed closed. It is crucial that a warm cry pump is kept closed!

This will not allow the same thing to happen again and protect the IFO from warm cryo contamination.

The down side of this that the computer can not identify vacuum states any longer.

This vacuum system badly needs an upgrade. I will make a list.

Attachment 1: VMEcrateout.png
VMEcrateout.png
Attachment 2: IMG_1725.JPG
IMG_1725.JPG
Attachment 3: warning.png
warning.png
Attachment 4: shortcomings.jpg
shortcomings.jpg
  7564   Wed Oct 17 08:04:31 2012 SteveUpdateVACRoughing pumps on for oil change

PR1, PR2 and RP3 turned on for warming up for oil change. Oil changed with 3.2L of  MVT-19 fluid in each. This substitute for HE-175 will be used at the next oil change - it has 1E-6 Torr vapor pressure.

To finish this job tomorrow: 1, check oil creeping upstream  2, change air filter of air purge if pressure drops <350 mTorr  3, measure venting time of pump

  7582   Fri Oct 19 16:45:39 2012 SteveUpdateVACvent has started

Quote:

 

 VENT NOW and FIX ALIGNMENT!

 PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now.  Jenne is taking over here.

  7584   Fri Oct 19 19:26:42 2012 JenneUpdateVACvent has started

Quote:

Quote:

 

 PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now.  Jenne is taking over here.

 Valves closed, 500 torr.  Steve will finish off Monday morning, then we'll take off doors and get to work.

  7587   Mon Oct 22 09:10:07 2012 SteveUpdateVAC@750Torr

Quote:

Quote:

Quote:

 

 PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now.  Jenne is taking over here.

 Valves closed, 500 torr.  Steve will finish off Monday morning, then we'll take off doors and get to work.

 We are almost at atm.  P1 750 Torr,  We are slowly reaching equilibrium.

Attachment 1: ventOct222012.png
ventOct222012.png
  7594   Tue Oct 23 08:45:00 2012 SteveUpdateVACvent day 3

Quote:

Quote:

Quote:

Quote:

 

 PSL shutter closed, manual block in place, HV turned off. P1 is at 200 Torr now.  Jenne is taking over here.

 Valves closed, 500 torr.  Steve will finish off Monday morning, then we'll take off doors and get to work.

 We are almost at atm.  P1 750 Torr,  We are slowly reaching equilibrium.

 The access connector was removed, BS and ITMY chambers were opened yesterday.

New one piece aluminum shell access connector installed. Jenne lowered the PSL out put into MC to ~100mW

Attachment 1: ventd4.png
ventd4.png
Attachment 2: IMG_1743.JPG
IMG_1743.JPG
  7597   Tue Oct 23 16:18:03 2012 SteveUpdateVACRoughing pumps on for oil change

Leybold D30AQuote:

PR1, PR2 and RP3 turned on for warming up for oil change. Oil changed with 3.2L of MVT-19  fluid in each. This substitute for HE-175 will be used next time.

To finish this job tomorrow: 1, check oil creeping upstream  2, change air filter of air purge if pressure drops <350 mTorr  3, measure venting time of pump

 . Leybold D30A manual is here. Exhaust filter traps were drained. No oil creeping was found. The pump venting time is < 1 minute.

PR-2 needs new secu-valve. PR1 & 2 are in excellent condition.

Attachment 1: oilchange.jpg
oilchange.jpg
  7605   Wed Oct 24 09:15:12 2012 SteveUpdateVACvacuum rack 24V ps was current limited

Quote:

Quote:

Quote:

Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr.  All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open.  One of the roughing pumps was also turned on.  Other stuff we didn't notice?  Bad. 

 Several of the suspensions were kicked pretty hard (600+ mV on some sensors) as a result of this quick vent wind.  All of the suspensions are damped now, so it doesn't look like we suffered any damage to suspensions.

CLOSE CALL on the vacuum system:

Jamie and I disabled V1, VM2 and VM3 gate valves by disconnecting their 120V solenoid actuator before the swap of the VME crate.

The vacuum controller unexpectedly lost control over the swap as Jamie described it. We were lucky not to do any damage! The ion pumps were cold and clean. We have not used them for years so their outgassing possibly  accumulated to reach ~10-50 Torr

I disconnected_ immobilized and labelled the following 6 valves:  the 4 large ion pump gate valves and VC1,  VC2  of the cryo pump. Note: the valves on the cryo pump stayed closed. It is crucial that a warm cry pump is kept closed!

This will not allow the same thing to happen again and protect the IFO from warm cryo contamination.

The down side of this that the computer can not identify vacuum states any longer.

This vacuum system badly needs an upgrade. I will make a list.

 While I was doing the oil change of the roughing pumps I accidentally touched the 24 V adjustment knob on the power supply.

All valve closed to default condition. I realized that the current indicator was red at 0.2A  and the voltage fluctuated from 3-13V

Increased current limiter to 0.4A and set voltage to 24V     I think this was the reason for the caos of valve switching during the VME swap.

 

Attachment 1: currentlimited24V.jpg
currentlimited24V.jpg
  7669   Mon Nov 5 10:34:48 2012 SteveUpdateVACexisting vacuum documents

Quote:

Quote:

Quote:

Quote:

Apparently all of the ION pump valves (VIPEE, VIPEV, VIPSV, VIPSE) opened, which vented the main volume up to 62 mTorr.  All of the annulus valves (VAVSE, VAVSV, VAVBS, VAVEV, VAVEE) also appeared to be open.  One of the roughing pumps was also turned on.  Other stuff we didn't notice?  Bad. 

 Several of the suspensions were kicked pretty hard (600+ mV on some sensors) as a result of this quick vent wind.  All of the suspensions are damped now, so it doesn't look like we suffered any damage to suspensions.

CLOSE CALL on the vacuum system:

Jamie and I disabled V1, VM2 and VM3 gate valves by disconnecting their 120V solenoid actuator before the swap of the VME crate.

The vacuum controller unexpectedly lost control over the swap as Jamie described it. We were lucky not to do any damage! The ion pumps were cold and clean. We have not used them for years so their outgassing possibly  accumulated to reach ~10-50 Torr

I disconnected_ immobilized and labelled the following 6 valves:  the 4 large ion pump gate valves and VC1,  VC2  of the cryo pump. Note: the valves on the cryo pump stayed closed. It is crucial that a warm cry pump is kept closed!

This will not allow the same thing to happen again and protect the IFO from warm cryo contamination.

The down side of this that the computer can not identify vacuum states any longer.

This vacuum system badly needs an upgrade. I will make a list.

 While I was doing the oil change of the roughing pumps I accidentally touched the 24 V adjustment knob on the power supply.

All valve closed to default condition. I realized that the current indicator was red at 0.2A  and the voltage fluctuated from 3-13V

Increased current limiter to 0.4A and set voltage to 24V     I think this was the reason for the caos of valve switching during the VME swap.

 

 I asked Jamie to read these docs so we can do some troubleshooting while at atmosphere. We have to have the all valve closed DEFAULT condition working-tested.

I'd like to reconnect all valves after this test so the state identification software could work, including interlocks.

Posted the following documents on 40m wiki.

 

http://www.ligo.caltech.edu/~ajw/40m/40mVaccum_T000054-00.pdf
http://www.ligo.caltech.edu/~ajw/40m/40mProcedures.doc 

https://dcc.ligo.org/DocDB/0015/D000338/000/D000338-00.pdf
  7696   Mon Nov 12 09:21:10 2012 SteveUpdateVACpumpdown has started

I'm looking for IOO steering mirror power supplies. I found two so far: one at 1Y3 as Kepco  + 75V and one at OMC_North rack -150V

Are there any more? The OMC is off.

ANSWER: only one of the steering PZT can be driven, so see their power supplies

Attachment 1: beforepd.png
beforepd.png
Attachment 2: IMG_1800.JPG
IMG_1800.JPG
Attachment 3: IMG_1801.JPG
IMG_1801.JPG
  7697   Mon Nov 12 16:52:03 2012 SteveUpdateVACpumpdown has completed

 The pressure is CC1 3e-4 Torr at 8 hours of pumping.  Status: vacuum normal

The IFO is ready for light

 

Attachment 1: pd74.png
pd74.png
Attachment 2: pd74at8h.png
pd74at8h.png
  7703   Tue Nov 13 08:34:11 2012 SteveSummaryVACpumpdown after 24days at atmosphere

 

 

Attachment 1: pd74d1.png
pd74d1.png
Attachment 2: 24datm.png
24datm.png
Attachment 3: pdd1.png
pdd1.png
  7753   Tue Nov 27 09:44:09 2012 SteveUpdateVACpumpdown at 15 days

 It took 15 days to reach 1e-5 Torr

The RGA was turned on yesterday. The rga scan plotting was not working. Den wrote a Python script to log and plot because the Mathlab had trouble receiving data from our old c0raga.

It turned out that the Joe's log&plot system was working today. Thanks Den and Joe.

Here is the first rga scan.

 

Attachment 1: pd74m15d.png
pd74m15d.png
Attachment 2: pd74m15d_rga1d.png
pd74m15d_rga1d.png
  7849   Tue Dec 18 10:43:20 2012 SteveUpdateVACvent has completed

 The 40m vacuum envelope is at atm    It took 4.5 hours at ~3 Torr/min speed. Atm1

 

What I did:

Turned PZT voltages off: 84.1V at OMC-rack location

                                           -  99V at 1Y3 location as PZT_pitch,

                                             56.6V KEPCO at 1Y3 location as PZT_yaw                                           

Took screen shuts of SUS_SUMMARY, yesterday,  Atm3

Turned off OPLEV _SERVOs, today , Atm2

Closed PSL_SHUTTER and green shutters at the ends

 

Set vacuum valves for vent position and opened VM2 for the RGA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachment 1: vent74.png
vent74.png
Attachment 2: bvent.png
bvent.png
Attachment 3: befVent.png
befVent.png
  7853   Tue Dec 18 16:37:40 2012 SteveUpdateVAClast RGA scan before vent

 

 

Attachment 1: pd74m36d.png
pd74m36d.png
Attachment 2: 36d_vacuum_normal.png
36d_vacuum_normal.png
  7856   Wed Dec 19 11:53:23 2012 SteveUpdateVACAC removed

 Koji, Manasa, Jenne, Jamie, Bob and Steve

Access connector removed this morning and work has began in the IOO chamber.  BE WARE OF ANTS !

 

Attachment 1: workingatatm.png
workingatatm.png
  7914   Thu Jan 17 17:04:49 2013 SteveUpdateVACvac monitor screen changed

The COVAC_MONITOR.adl was changed. Ion pump labeled as disconnected means: ion pump controller power turned off and ion pump gate valve control connection disconnected.

RP2 roughing pump labeled disconnected means:  hardware  disconnected.

The actual operational, valve control screen has not been changed yet.

Attachment 1: screenmod.png
screenmod.png
  7936   Thu Jan 24 08:28:35 2013 SteveUpdateVACwhen to pumpdown ?

Reminder: I will be on vacation next week. We would have to put the access connector in tonight if I'm pumping down Friday, tomorrow.

  7939   Thu Jan 24 14:40:09 2013 SteveUpdateVACRGA backgroung

 RGA background with VM2 open to Maglev at day 37

 

Note: The PAN gauge of the  annulos is at atm.  Please do not vent this 200 ft long annulos line when you venting the annulos of a chamber. The chamber annulos should be closed off to this long 2"  OD. pipe before you vent the annulos of a chamber.

 

Attachment 1: Screenshot.png
Screenshot.png
  8057   Mon Feb 11 16:16:27 2013 SteveUpdateVAC55 days at atmoshere

CP Stat 100  sheet-covers were replaced by clean ones on open chambers BS, ITMX, ITMY and ETMY this morning.

Try to fold the sheets such way that the clean side is facing each other, so they do not accumulate dust.

 

Attachment 1: atm55d.png
atm55d.png
  8106   Tue Feb 19 08:42:31 2013 KojiUpdateVACETMX door open

[Steve, Yuta, Koji]

The ETMX heavy door was removed.

  8129   Thu Feb 21 15:21:07 2013 yutaUpdateVACall heavy doors on, started pumping down annulus

[Steve, Manasa, Jenne, Sendhil, Evan, Yuta]

We put heavy doors on ITMX/ITMY/BS chamber and started pumping down from annulus.

What we did:
  1. Replaced POP55 with AS55 back, because it was not broken.
  2. Centered on AS55, REFL55, REFL11, POPDC PD.
  3. Tried to lock PRMI, but I couldn't lock even MI stably for more than 1 min. I believe this is because it was noisy this morning. But I checked again that REFL/POP/AS beams are coming out without clipping and we have some error signals.
  4. Noticed AS beam has less range in left (on AS camera), so we tweaked OM4 a little to make more room.
  6. Took pictures inside ITMX and BS chambers
  7. Put heavy doors on ITMX/ITMY/BS chambers.
  8. Started pumping down annulus.
  9. Recentered IPANG/IPPOS and oplevs on their QPDs.

POP, REFL, AS:

  8131   Thu Feb 21 18:01:27 2013 SteveUpdateVACpumpdown at 230 Torr

 

 We are pumping down with RP1 & RP3 oily roughing pumps at 3 Torr/min speed. The butterfly valve was just removed.

The PSL shutter is open to vacuum at ~100  mW 1064 nm. The inter lock should close it at ~5 mTorr.

Rana will shut down pumping tonight.

He will close V3 from screen, close RV1 valve with torque wheel, turn off roughing pumps and disconnect hose between RV1 and roughing pumps.

I will restart pumping early morning tomorrow.

 

  8134   Thu Feb 21 21:12:42 2013 KojiUpdateVACpumpdown at 230 Torr

[Rana, Yuta, Koji]

21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs were turned off. And the bellows between RV1 and the rughing pumps are disconnected.

  8135   Fri Feb 22 08:01:25 2013 SteveUpdateVACpumpdown continuous

 

 Pump down is restarted after 10.5 hrs stop overnight.

Attachment 1: 16hrs_pd75.png
16hrs_pd75.png
  8136   Fri Feb 22 11:12:16 2013 SteveUpdateVACpumpdown completed

 IFO   P1 pressure is 1 mTorr.  It is ready for high power light.

The Maglev took over the pumping at 500 mTorr

 

Attachment 1: mag60min.png
mag60min.png
Attachment 2: pd75at20h.png
pd75at20h.png
  8155   Mon Feb 25 08:22:03 2013 SteveUpdateVACpumpdown at day 4

 All normal, IFO pressure 1.5e-5 Torr

RGA is pumped by TP-3 in back ground mode.

 

Attachment 1: 4d.png
4d.png
Attachment 2: 66d@atm.png
66d@atm.png