Entry  Fri Jul 13 10:54:55 2018, aaron, Update, VAC, Vent 80 vent80wtiptilts.png
[aaron, steve]

Steve gave me a venting tutorial. I'll record this in probably a bit more detail than is strictly necessary, so I can keep track of some
of the minor details for future reference.
    Reply  Fri Jul 13 16:26:52 2018, Steve, Update, VAC, Vent 80 is completing... @atm.pngvent80_7h.pngventregN2&Air_c.jpg
Steve and Aaron,

6 hrs vent is reaching equlibrium to room air. It took 3 and a half instrument grade air cilynders [ AI UZ300 as labelled ] at 10 psi pressure.
Average vent speed ~ 2 Torr/min
Entry  Mon Jul 16 15:07:19 2018, Koji, Summary, VAC, Oven C vent P_20180716_141512.jpgP_20180716_141601.jpgP_20180716_141610.jpgP_20180716_141827.jpgP_20180716_143901.jpg
[Steve Koji]

- Attachment1: Removed the thermal cap. Checked the temperature of the oven. It was totally cold.

- Attachment2: Confirmed the RGA section was isolated. The pumps for the RGA was left running.
Entry  Mon Jul 16 18:12:00 2018, Koji, Update, VAC, Adding a manual gate valve between TP1 and V1/VM2 P_20180716_155413.jpgP_20180716_155645.jpgP_20180716_155738.jpgP_20180716_162307.jpgP_20180716_172000.jpg
[Steve Koji]

We are in the process of adding a manual gate valve between TP1 (Osaka Maglev) and the other gate valves (I suppose V1 and VM2).
The work is still on going
    Reply  Tue Jul 17 18:16:38 2018, Steve, Summary, VAC, pumpdown 81 at 6 hrs 6x
Precondition:  4 days at atm.   Atm5

HEPA tent used during the vent at ETMY  It reduced partical count 10 fold of 0.5 and 0.3 micron particals. Atm6

New items in vacuum:  Clean manual gate valve [Cetec made] from John Worden with 6" id....as it came from Hanford... [ Throttle able
    Reply  Tue Jul 17 22:25:41 2018, Koji, Summary, VAC, pumpdown 81 at 6 hrs 
10:20PM


Opened VM2 to pump down the RGA section with TP1
Stopped rotary roughing pumps

Manually closed RV1
Closed
V3
Stopped RP1 and RP3
Vented the RP hose




The P1 pressure is 380mTorr. I allowed Gautam to use
    Reply  Wed Jul 18 12:49:08 2018, Steve, Summary, VAC, pumpdown 81 at 6 +4.5hrs manlGateScan.pnghanding_over_Mag.pngTGVw2auxfans_.jpg
The manual gate valve scan was clean. Atm1     TP1 was pumping on it overnight.

                                         
      Pumpdown continued to hand over the pumping to TP1 maglev turbo
    Reply  Wed Jul 18 17:36:50 2018, Steve, Summary, VAC, pumpdown 81 at 6 +9 hrs completed pd81completed.pngpd81@30hrs.png
IFO P1 6e-4 Torr,  manual gate valve is fully open

The annuloses will be pumped down tomorrow.

Valve configuration: vacuum normal, RGA and annuloses are not pumped
    Reply  Thu Jul 19 01:56:25 2018, gautam, Summary, VAC, AUX pump shutdown 
[koji, gautam]

Per Steve's instructions, we did the following:


TP3fl pressure reading was 65 torr.
TP3 controller reported pumping current of ~0.18A, temperature of 24C.
We throttled
    Reply  Thu Jul 19 11:01:03 2018, Steve, Summary, VAC, pd81 @ 2e-5 Torr pd81@2days.png
Cold cathode gauge just turned on.
    Reply  Thu Jul 19 13:35:30 2018, Steve, Summary, VAC, annuloses pumped  AnsPumped.png
Roughing down the annuloses required closing V1 for 13 minutes

IFO is 2.2e-5 Torr
    Reply  Mon Jul 23 09:58:52 2018, Steve, Summary, VAC, RGA scan at day 6 pd81-560Hz-d6.png
 

 
    Reply  Mon Aug 6 09:34:02 2018, Steve, Update, VAC, RGA scan at day 20 pd81d20.png
 

 
    Reply  Thu Aug 16 07:50:28 2018, Steve, Update, VAC, pumpdown 81 at day 30 pd81d30.png
 

 
    Reply  Thu Aug 16 14:48:14 2018, Steve, Update, VAC, why do we need a root pump? 6x


Basic Pump Throughput Concepts

What is Pump Throughput?

The manufacturer of a vacuum pump supplies a chart for each pump
showing pumping speed (volume in unit time) vs pressure. The example, for a fictitious pump, shows the pumping speed is substantially
    Reply  Fri Aug 24 10:51:23 2018, Steve, Update, VAC, pumpdown 81 at day 38 d38.png
 

 
    Reply  Wed Aug 29 09:56:00 2018, Steve, Update, VAC, Maglev controller needs service 
TP-1 Osaka maglev controller  [  model TCO10M,  ser V3F04J07 ]  needs maintenance. Alarm led  on indicating  that we need
Lv2 service.

The turbo and the controller are in good working order.
Entry  Fri Sep 21 16:51:43 2018, gautam, Update, VAC, c1vac1 is unresponsive 
Steve pointed out that some of the vacuum MEDM screen fields were reporting "NO COMM". Koji confirmed that this is a c1vac1 problem, likely
the same as reported here and can be fixed using the same procedure.

However, Steve is worried that the interlock won't kick in in case of a vacuum emergency, 
    Reply  Mon Sep 24 15:06:10 2018, gautam, Update, VAC, c1vac1 reboot + TP1 controller replacement beforeReboot.pngafterReboot.pngCC1.png
[steve, gautam]

Following the procedure in this elog, we effected a reset of the vacuum slow machines.
Usually, I just turn the key on these crates to do a power cycle, but Steve pointed out that for the vacuum machines, we
    Reply  Wed Sep 26 10:07:16 2018, Steve, Update, VAC, why reboot c1vac1 NOcomm.pngReboot_&_sawp.pngc1vac1&2_.jpg
Precondition: c1vac1 & c1vac2 all LED warning lights green [ atm3 ], the only error message is in the gauge readings NO COMM, dataviewer will plot
zero [ atm1 ], valves are operational

When our vacuum gauges read " NO COMM " than our INTERLOCKS  do  NOT
    Reply  Thu Oct 4 08:25:50 2018, Steve, Update, VAC, rga scan pd81 at day 78 pd81d78.png
 

 
    Reply  Fri Oct 12 08:27:05 2018, Steve, Update, VAC, drypump forepump.png
Gautam and Steve,

Our TP3 drypump seal is at 360 mT [0.25A load on small turbo]  after one year.  We tried to swap in old spare drypump with new tip 
seal. It was blowing it's fuse, so we could not do it.
    Reply  Fri Oct 12 17:37:03 2018, Steve, Update, VAC, pressure gauge choices  
We want to measure the pressure gradient in the 40m IFO

Our old MKS cold cathodes are out of order. The existing working gauge at the pumpspool
is InstruTech CCM501
    Reply  Mon Oct 15 13:59:42 2018, Steve, Update, VAC, drypump replaced drypump_swap.png
Steve & Bob,

Bob removed the head cover from the housing to inspect the condition of the the tip seal. The tip seal was fine but the viton cover seal had
a bad hump. This misaligned the tip seal and it did not allow it to rotate.
    Reply  Mon Oct 22 15:19:05 2018, Steve, Update, VAC, Maglev controller serviced our_controller_is_back.png
Gautam & Steve,

Our controller is back with Osaka maintenace completed. We swapped it in this morning.




Quote:


Entry  Wed Oct 31 17:54:25 2018, gautam, Update, VAC, CC1 hornet power connection restored cc1_Hornet.png
Steve reported to me that the CC1 Hornet gauge was not reporting the IFO pressure after some cable tracing at EX. I found that the power to the unit
had been accidentally disconnected. I re-connected the power and manually turned on the HV on the CC gauge (perhaps this can be automated in the new vacuum
paradigm). IFO pressure of 8e-6 torr is being reported now.
Entry  Tue Nov 6 23:19:06 2018, gautam, Update, VAC, c1vac1 FAIL lights on (briefly) Screenshot_from_2018-11-06_23-18-23.pngScreenshot_from_2018-11-06_23-19-26.png
Jon and I stuck a extender card into the eurocrate at 1X8 earlier today (~5pm PT), to see if the box was getting +24V DC from the Sorensen or not. Upon
sticking the card in, the FAIL LEDs
on all the VME cards came on. We immediately removed the extender card. Without any intervention from us, after
    Reply  Wed Nov 7 08:32:32 2018, Steve, Update, VAC, c1vac1 FAIL lights on (briefly)...checked Vac_MC_OK.png
The vacuum and MC are OK




Quote:



Jon and I stuck a extender card into the eurocrate at 1X8 earlier today (~5pm PT), to see if the box was getting
    Reply  Tue Nov 13 16:15:01 2018, Steve, Update, VAC, rga scan pd81 at day 119 pd81-d119.pngpd81-560Hz-d119.png
 

 
    Reply  Fri Nov 16 10:26:12 2018, Steve, Update, VAC, single viton O-rings Single-O-ring.png
The 40m vacuum envelope has one large single O-ring on the OOC west side. All other doors have double O-ring with annuloses.

There are 3  spacers to protect o-ring. They should not be removed!

 
    Reply  Fri Nov 16 15:09:31 2018, Steve, Configuration, VAC, not venting cryo and ion pumps 
Notes on the ion pumps and cryo pump:



Our 4 ion pumps were closed off for a lomg time. I estmated their pressure to be around
~1 Torr. After talking with Koji we decided not to vent them.


It'd be still useful to wire their position sensors. But make sure we do not actuate the valves. 
    Reply  Mon Nov 19 14:59:48 2018, Chub, Update, VAC, Vent 81 
Vent 80 is nearly complete; the instrument is almost to atmosphere.  All four ion pump gate valves have been disconnected, though the position sensors
are still connected,and all annulus valves are open.  The controllers of TP1 and TP3 have been disconnected from AC power. VC1 and VC2 have been disconnected
and must remained closed. Currently, the RGA
    Reply  Mon Nov 19 17:09:00 2018, Steve, Update, VAC, Vent 81 beforeVent82.pngvent81completed.png
Gautam, Aaron, Chub and Steve,




Quote:



Vent 80 is nearly complete; the instrument is almost to atmosphere.  All four ion pump gate valves have been
    Reply  Mon Nov 19 22:01:50 2018, gautam, Update, VAC, Loose nut on valve IMG_7171.JPG
As I was turning off the lights in the VEA, I heard a rattling sound from near the PSL enclosure. I followed it to a valve - I couldn't see a label
on this valve in my brief effort to find one, but it is on the south-west corner of the IMC table, so maybe VABSSCI or VABSSCO? The power cable is somehow
spliced with an attachment that looks to be bringing gas in/out of the valve (See Attachment #1), and the nut on the bottom was loose,
    Reply  Tue Nov 20 13:13:01 2018, gautam, Update, VAC, IMC alignment is okay 
I checked the IMC alignment following the vent, for which the manual beam block placed on the PSL table was removed. The alignment is okay, after minor
touchup, the MC Trans was ~1200 cts which is roughly what it was pre-vent. I've closed the PSL shutter again.
    Reply  Mon Nov 26 15:58:48 2018, Steve, Update, VAC, Vent 81 
Gautam, Aaron, Chub & Steve,

ETMY heavy door replaced by light one.

We did the following:  measured 950 particles/cf min of 0.5 micron at SP table, wiped crane and it's cable, wiped chamber,
    Reply  Tue Nov 27 17:06:51 2018, Steve, Configuration, VAC, Agilent 84FS turbo installed as TP2 
Chub & Steve,

We swapped in our  replacement of Varian V70D "bear-can" turbo as factory clean.

The new
Entry  Wed Dec 19 14:19:15 2018, Koji, Summary, VAC, Plan for pumpoing down test Screenshot_from_2018-12-19_14-49-34.png
We still need elaborated test procedure posted

12/29 Wed


Jon continues to work on valve actuator tests.
Chub continues to work on wiring / fixing wiring.
At the end of
Entry  Wed Dec 19 21:14:50 2018, gautam, Update, VAC, Pumpdown tomorrow  
I just spoke to Jon who asked me to make this elog - we will be ready to test one or more parts of the pumpdown procedure tomorrow (12/20), so
we should proceed as planned to put the heavy doors back on EY and OMC chambers at 9am tomorrow morning. Jon will circulate a more
detailed procedure about the pumpdown steps later today evening.
    Reply  Thu Dec 20 08:38:27 2018, Jon, Update, VAC, Pumpdown tomorrow  
Linked is the pumpdown
procedure, contained in the old 40m documentation. The relevant procedure is "All Off --> Vacuum Normal" on page 11.




Quote:


    Reply  Thu Dec 20 10:28:43 2018, gautam, Update, VAC, Heavy doors back on for pumpdown 82 
[Chub, Koji, Gautam]

We replaced the EY and IOO chamber heavy doors by 10:10 am PST. Torquing was done first oen round at 25 ft-lb, next at 45 ft-lb (we trust the
calibration on the torque wrench, but how reliable is this? And how important are these numbers in ensuring a smooth pumpdown?). All went smooth. The interior
    Reply  Fri Dec 21 11:13:13 2018, gautam, Omnistructure, VAC, N2 line valved off VacGauges.pngScreenshot_from_2018-12-21_13-02-06.png
Per the discussion yesterday, I valved off the N2 line in the drill press
room at 11 am PST today morning so as to avoid any accidental software induced gate-valve actuation during the holidays. The line
pressure is steadily dropping...
    Reply  Fri Dec 21 12:57:10 2018, Koji, Omnistructure, VAC, N2 line valved off 
Independent question: Are all the turbo forelines vented automatically? We manually did it for the main roughing line.

 
    Reply  Thu Jan 3 15:08:37 2019, gautam, Omnistructure, VAC, Vac status unknown Screenshot_from_2019-01-03_15-19-51.pngScreenshot_from_2019-01-03_15-14-14.png997B13A9-CAAF-409C-A6C2-00414D30A141.jpeg
Larry W came by the 40m, and reported that there was a campus-wide power glitch (he was here to check if our networking infrastructure was affected).
I thought I'd check the status of the vacuum.


Attachment #1 is a screenshot of the Vac overview MEDM screen. Clearly something
    Reply  Fri Jan 4 10:25:19 2019, Jon, Omnistructure, VAC, N2 line valved off 
Yes, for TP2 and TP3. They both have a small vent valve that opens automatically on shutdown.




Quote:



Independent question: Are all the turbo forelines vented automatically? We manually did it for the main roughing
    Reply  Wed Jan 9 11:07:09 2019, gautam, Update, VAC, New Vac channel logging Screenshot_from_2019-01-09_11-08-28.png
Looks like I didn't restart all the daqd processes last night, so the data was not in fact being recorded to frames. I just restarted everything,
and looks like the data for the last 3 minutes are being recorded . Is it reasonable that the TP1 current channel is reporting 0.75A of current draw now, when the pump is off? Also the temperature
Entry  Wed Jan 9 20:01:25 2019, Jon, Update, VAC, Second pumpdown completed Screenshot_from_2019-01-09_20-00-39.pngIMG_3088.jpg
[Jon, Koji, Chub, Gautam]

Summary

The second pumpdown with the new vacuum system was completed successfully today. A time history is
attached below.
    Reply  Thu Jan 10 10:23:46 2019, gautam, Update, VAC, overnight leak rate OvernightLeak.png
Overnight, the pressure increased from 247 uTorr to 264 uTorr over a period of 30000 seconds. Assuming an IFO volume of 33,000 liters, this corresponds
to an average leak rate of ~20 uTorr L / s.
It'd be interesting to see how this compares with the spec'd leak rates of the Viton O-ring seals and valves/ outgassing rates. The two channels
Entry  Thu Jan 10 11:32:40 2019, Chub, Update, VAC, Manual valve interfaced with CDS 
Connected the manual gate valve status indicator to the Acromag box this morning.  Labeled the temporary cable (a 50' 9p DSUB, will order a
proper sized cable shortly) and the panel RV2.  
Entry  Thu Jan 10 19:59:08 2019, Jon, Update, VAC, Vac System Running Normally on Turbo Pumps Screen_Shot_2019-01-10_at_7.58.24_PM.pngCCs.pngTPs.png
[Jon, Gautam, Chub]

Summary

We continued the pumpdown of the IFO today. The main volume pressure has reached 1.9e-5 torr and is continuing to fall. The
system has performed without issue all day, so we'll leave the turbos continuously running from here on in the normal pumping configuration. Both