    Reply  Sun Mar 6 18:14:45 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_investigation.pdf
Following repeated failure to establish communication between c1vac and the XGS600 controller via Perle IOLAN serial device server, I decided to monitor the
signal voltage of the communication channels (pin#2, pin#3 and pin#5) using an oscilloscope. The result of this investigation is presented
in the attached pdf document. In summary, it seems I have used a crossed wired RS232 serial cable instead of a normal RS232 serial cable, so the c1vac
    Reply  Mon Mar 7 13:53:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_live.pdf
So it appears that my deduction from the pictures of needing a cable swap was correct, however, it turns out that the installed cable was actually
the normal RS232 and what we need instead is the RS232 null cable. After the swap was done, the communication between c1vac and the XGS600 controller became
active. Although, the data makes it all to the to c1vac without any issues, the scope view of it shows that it is mainly utilizing the upper half of
    Reply  Mon Mar 7 14:52:34 2022, Koji, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
Great trouble shoot!

> I guess, the only remaining issue now is the incorrect atmospheric pressure reading of 1000 Torrs. 

This is just a calibration issue. The controller should have the calibration function.
    Reply  Tue Mar 8 12:08:47 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels XGS600_calibration.pdf
OMG, it worked! It was indeed a calibration issue and all I had to do was press the "OK" button after selecting the "CAL" tab beside
the pressure reading. Wow.




Entry  Wed Mar 9 10:23:28 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #1 
Jordan, Chub, Paco

Chub and I went into the lab this morning to leak check the new gate valve after pumping over the weekend. This would be done through the RGA
and spraying helium around the newly installed flanges. The RGA is set to monitor the partial pressure of helium versus time and we visually watch for
Entry  Thu Mar 10 09:39:59 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #2 3-09-2022.PNG3-10-2022.PNG
This morning Chub and I leak checked the manual gate valve with the RGA and helium. There was no change in the helium partial pressure while spraying
helium around the flanges, all looks good.

 
Entry  Tue Mar 29 15:07:11 2022, Tega, Summary, VAC, Opening of MC and ETM chambers 
[Anchal, Chub, Ian, Paco, Tega]

Today, we opened the MC chamber, ETMX chamber and ETMY chamber.
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
[Paco, JC, Ian, Jordan, Chub]

Checking in the morning, I walked over to the Nitrogen tanks to check the levels. Noticed one tank was empty, so I swapped it out. Chub came
over to check the levels and to take note of how many tanks were left available for usage (None). Chub continued to put in a work order for a set of full
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
Today, Tega and I would like to vent the pump spool an dinstall the new FRG-400 Agilent Pressure Gauges (per elog 15703). The attached picture shows
the volume needed to be vented highlighted in red, and the gauges that need to be replaced/removed (purple dot next to the name).

The vent plan is as follows:
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
[Jordan, JC, Tega]

We have installed all the FRGs and updated the VAC medm screens to display their sensor readings. The replacement map is CC# -> FRG#, where
# in [1..4] and PRP1 -> FRG5. We now need to clean up the C1VAC python code so that it is not overloaded with non-function gauges (CC1,CC2,CC3,CC4,PRP1).
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Prior to venting the RGA volume on Tuesday (4/12/2022) I took an RGA scan of the volume to be vented (RGA+TP1 volume+Manual Gate Valve) to see if there
was a difference after replacing the manual gate valve. Attached is the plot from 4/12/22, and an overlay plot to complare 4/12/22 to 12/10/2021, when
the same volume was scanned with the old (defective) manual gate valve.
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
[Jordan, JC]

It was brought to attention during yesterday's meeting that the pressures in the vacuum system were not equivalent althought the valve were
open. So this morning, Jordan and I reviewed the pressure gauges P3 and P4. We attempted to recalibrate, but the gauges were unresponsive. Following this,
    Reply  Thu Apr 21 16:36:56 2022, Tega, Update, VAC, cleanup work for vacuum git repo 
git repo - https://git.ligo.org/40m/vac

Finally incorporated the FRGs into the main modbusIOC service and everything seems to be working fine. I have also removed the old sensors (CC1,CC2,CC3,CC4,PTP1,IG1)
from the serial client list and their corresponding EPICS channels. Furthermore, the interlock service python script has been updated so that all occurrence
Entry  Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement IMG_0572.jpegIMG_0573.jpeg
Jordan, JC

While the pumpspool is vented, I thought it would be a convenient time to change out the tip seal on the TP3 forepump. This one had not been
changed since 2018, so as preventative maintence I had JC remove the pump and begin cleaning/installing the new tip seal.
Entry  Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down Screen_Shot_2022-04-29_at_8.46.53_AM.png
Jordan and I, in order to start pumpig down the RGA Volume, we began by opening V7 and VM. Afterwards, we started RP1 and RP3. After this, the pressure
in the line between RP1, RP3, and V6 dropped to 3.4 mTorr. Next, we tried to open V6, although an error message popped up. We haven't been able
to erase it since. But we were able to turn on TP2 with V4 closed. The pressure in that line is reporting 1.4 mTorr.
    Reply  Mon May 2 10:00:34 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement 
[JC, Jordan]

Jordan recieved the new tip seal Friday afternoon and I continued the replacement process in the morning. Finishing up, we proceeded to test
the pump in the Clean and Bake room. The pump's pressure lowered to 110 mTorr, and we continue pumping so the seal can recieve a good fitting.
    Reply  Tue May 3 13:18:47 2022, JC, Update, VAC, RGA Pump Down 
Jordan, Tega, JC

Issue has been resolved. Breaker on RP1 was tripped so the RP1 button was reporting ON, but was not actually on which continuously tripped the
V6 interlock. Breaker was reset, RP1 and RP3 turned on. The V6 was opened to rough out the RGA volume. Once, pressure was at ~100mtorr, V4 was opened to
Entry  Fri May 20 12:42:23 2022, Tega, Update, VAC, Door installation on the end stations 
[JC, Tega, Chub]

Today we installed the 200 lbs doors on the end station chambers.
    Reply  Tue May 24 10:37:09 2022, Tega, Update, VAC, added FRG channels to slow channel ini file 
[Vacuum gauge sensors]

Paco informed me that the FRG sensor EPICS channels are not available on dataviewer, so I added them to slow channels ini file (/opt/rtcds/caltech/c1/chans/daq/C0EDCU.ini).
I also commented out the old CC1, CC2, CC3 and CC4 gauges. A service restart is required for them to become available but this cannot be done right now
Entry  Tue May 24 11:04:53 2022, JC, Update, VAC, Beginning Pumpdown PUMPDOWN-2022-05-24_16-57-59.pngC1VAC_Screenshot_2022-05-24_16-59-27.png
[JC, Jordan, Paco, Chub]

We began with the pumpdown this morning. We started with the annulus volume and proceeded by using the following:

1. Isolate the RGA Volume by closing of valves VM3 and V7.
Entry  Wed Jun 8 16:03:12 2022, Koji, Update, VAC, Power Outage 220608: Vacuum Recovery Screenshot_2022-06-08_16-43-13.png
=== Observation ===


TP1/2/3 failed. AUX RP did not survive the power outage (of course)


=== Initial Recovery of TP2/TP3 ===


Stopped TP1/2/3
Restored RP AUX at the wall breaker module
Restarted TP2/3


=== Rough
    Reply  Wed Jun 15 07:26:35 2022, JC, Update, VAC, Beginning Pumpdown 
[Jordan, JC]

Jordan and I went in to retore the Vacuum System back to it's original state before the power loss on June 8, 2022. The process went smoothly
as we first closed V7 and opened VM3 (in that order).
Entry  Fri Jul 8 14:03:33 2022, JC, HowTo, VAC, Vacuum Preparation for Power Shutdown  Screen_Shot_2022-07-12_at_7.02.14_AM.png
[Koji, JC]

Koji and I have prepared the vacuum system for the power outage on Saturday.


Closed V1 to isolate the main volume.
Closed of VASE, VASV, VABSSCI,VABS, VABSSCO, VAEV, and VAEE.
Closed V6, then
Entry  Mon Jul 11 15:26:12 2022, JC, HowTo, VAC, Startup after Power Outage 
[Koji, Jc]

Koji and I began starting that Vacuum system up.


Reverse order step 2 of shutting down electronics. Anthing after, turn
    Reply  Mon Jul 11 17:25:43 2022, Tega, Update, VAC, fixed obsolete reference bug in serial_XGS600 service 
Koji noticed that the FRG sensors were not updating due to reference to an obsolete modbusIOC_XGS service, which was used temporarily to test
the operation of the serial XGS sensor readout to EPICS. The information in this service was later moved into modbusIOC.service but the dependence on the
modbusIOC_XGS.service was not removed from the serial_XGS600.service. This did not present any issue before the shutdown, probably bcos the obsolete service
    Reply  Mon Jul 11 17:41:52 2022, Koji, HowTo, VAC, Startup after Power Outage Screen_Shot_2022-07-11_at_18.13.00.png
- Once the FRG gauge readings are back (see next elog by Tega), I could open V1 to pump down the main vacuum manifold.
- TP2/TP3 were brought back to stand-by mode (slower spinning)
- V7 was closed to separate the annuli side and TP1
Entry  Fri Sep 23 10:05:38 2022, JC, Update, VAC, N2 Interlocks triggered  Screenshot_2022-09-23_10-19-39.pngScreenshot_2022-09-23_10-22-45.png
[Chub, Anchal, Tega, JC]

After replacing an empty tank this morning, I heard a hissing sound coming from the nozzle area. It turns out that this was from the copper tubing.
The tubing we slightly broken and this was comfirmed with soapy water bubbles. This caused the N2 pressure to drop and the Vac interlocks to be triggered.
Entry  Fri Feb 11 16:43:09 2011, steve, Update, VIDEO, MC1 & 3 video monitor P1070415.JPG
I set up video monitoring of MC1 and MC3
Entry  Thu Feb 17 13:20:06 2011, Suresh, Update, VIDEO, Some more labels 
[Larisa, Kiwamu, Steve and Suresh]
 
  We continued the labeling of video cables. All exiting cables which are going to be used used in the new scheme have been labeled.
Entry  Wed Feb 23 16:56:17 2011, Larisa Thorne, Update, VIDEO, Cable laying...continued 
Having finished labeling the existing cables to match their new names, we (Steve, Kiwamu and Larisa) moved on to start laying new cables and labeling
them according to the list.
 
    Reply  Wed Mar 9 16:07:42 2011, kiwamu, Update, VIDEO, cable session 
[Koji, Steve, Suresh, Kiwamu]
The following video cables have been newly laid down :
  - MC1F/MC3F (65 ft.)
Entry  Wed Mar 30 17:01:08 2011, Larisa Thorne, Update, VIDEO, Cable laying...continued 
[Steve, Suresh, Kiwamu, Larisa]
 
Only the PRM/BS cable was laid today.
    Reply  Thu Mar 31 08:31:44 2011, Suresh, Update, VIDEO, Cable laying...continued P1070489.JPGP1070494.JPG
The video work has crossed a milestone.    
Kiwamu and Steve have shifted the three quads from the control room to the Video MUX rack (1Y1) and have wired them to the MUX.
The monitors in the control room have been repositioned and renumbered.  They are now connected directly to the MUX. 
Entry  Thu Apr 7 13:12:23 2011, Koji, HowTo, VIDEO, Video switching tip 
Long time ago, I looked at the manual of the video switcher. 
http://media.extron.com/download/files/userman/Plus_Ultra_MAV_C.pdf
 
    Reply  Fri Apr 15 02:30:24 2011, Koji, HowTo, VIDEO, Video switching tip 
I have made a small python script to handle the video matrix.
It is too far from the perfection, but I release it as it is already useful in some extent.
The script is in the /cvs/cds/rtcds/caltech/c1/scripts/general directory.
Entry  Wed Apr 20 20:42:55 2011, kiwamu, Update, VIDEO, today's video session DSC_2931_ss.jpgDSC_2938_ss.jpg
[Steve / Suresh / Kiwamu]
90 % of unused video cables have been removed.
Still a couple of video cables are floating around the video MUX. They will be removed in the next week's session.
Entry  Thu Aug 18 22:24:08 2011, jamie, Omnistructure, VIDEO, Updated 'videoswitch' script 
I have updated the 'videoswitch' program that controls the video MUX.  It now includes the ability to query the video mux for the channel mapping:
controls@pianosa:~ 0$ /opt/rtcds/caltech/c1/scripts/general/videoswitch -h
Usage: 
Entry  Thu Jul 19 02:14:37 2012, Jenne, Update, VIDEO, Made a video gui 
I learned a little bit of python scripting while looking at the videoswitch script, and I made a video medm screen. 
Each monitor has a dropdown menu for all the common cameras we use (medm only lets you put a limited # of lines on a dropdown menu...when we want
to add things like OMCR or RCT, we'll need to add another dropdown set)
Entry  Tue Jul 24 18:33:12 2012, Yaakov, Update, VIDEO, Centering the MCR camera 
Jenne and I centered the MCR camera on the AP table.
We moved the camera as far as it could go on its mount without shifting its screws, and adjusted the optic that the camera looks at for the rest
    Reply  Wed Jul 25 11:41:00 2012, Yaakov, Update, VIDEO, Centering the MCR camera 


    
        
            Quote:
        
        
            

           Jenne and I centered the MCR camera
Entry  Wed Nov 28 19:02:41 2007, Andrey, Bureaucracy, WIKI-40M Update, New WIKI-40M page describing Matlab Suspension Modeling 

I created the WIKI-40m page with some details about my today's talk on the 40-m lab meeting.
Entry  Wed Jan 2 11:38:56 2008, tobin, Summary, WIKI-40M Update, wiki spam 
Our wiki keeps getting spammed.  It turns out that you can upload attachments without a password, which is a bug.  I'll ask David Barker whether there's
a fix for this.
Entry  Tue Aug 25 03:30:23 2009, Yoichi, Summary, WIKI-40M Update, Green lock and phase noise PhaseNoise.png
While Koji and I were discussing about the green laser lock, we wondered if the common motion of the cavity mirrors,
which won't be suppressed by the green laser servo, will cause any problem to the locking.
Entry  Wed Oct 21 11:41:29 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry 
 I made a wiki entry for the PSL table diagram under the PSL directory on the 40mHomePage. I tried to use the ImageLink macro to use a resized (smaller)
version of the diagram as a link to the full image, which it is designed to do if there is no target given, but it didn't seem to work. Instead, I had
to create a second page that had the full-sized diagram, and I used ImageLink with a smaller version to link to that page.
    Reply  Wed Oct 21 13:07:54 2009, Koji, Update, WIKI-40M Update, PSL Table Diagram wiki entry 
http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL_Table_Diagram
Thanks. I love this. Could you also put the original file that is editable for future modification by anyone?


    
        
            
Entry  Wed Oct 21 15:07:45 2009, Alberto, Update, WIKI-40M Update, Photodiodes' configuration for the Upgrade 
I uploaded on the Wiki (here) the results of an inventory over our current PDs,
a list of the new ones that we're going to need for the new control scheme.
Entry  Thu Oct 22 15:44:16 2009, Zach, Update, WIKI-40M Update, MOPA diagram 
 I have updated the PSL Diagram wiki page to include MOPA. As with the PSL diagram, clicking the photo on the main page takes you to a larger image.
The inventory is pretty meager as I didn't have time to sit and read labels (if indeed there are any). I will look through the documentation at the 40m
to see if there is a record of what is there. Again, if you know something, please amend the list!!
    Reply  Thu Oct 22 15:49:29 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry 


    
        
            
            Quote:
            
        
        
            
            http://lhocds.ligo-wa.caltech.edu:8000/40m/PSL_Table_Diagram
    Reply  Thu Oct 22 21:58:26 2009, Koji, Update, WIKI-40M Update, PSL Table Diagram wiki entry 
Diagram. I don't want to say PNG is an editable format for this purpose...
You have the PPT, PDF or any drawing format to create this diagram.


    
        
            
    Reply  Thu Oct 22 23:14:54 2009, Zach, Update, WIKI-40M Update, PSL Table Diagram wiki entry 


    
        
            Quote:
        
        
            

           Diagram. I don't want to say PNG is an editable format for this purpose...
ELOG V3.1.3-