Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work  
|
Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered
| +
Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed
| +
Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed
| +
Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed
| +
Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras
| +
Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3
| +
Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work
| +
Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work
| +
Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE.  
| +
Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4
| +
Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1
| +
Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered
| +
Thu Nov 24 01:28:09 2011, kiwamu, Update, General, 1X8 sorensen came back
| +
Fri May 3 12:48:40 2019, gautam, Update, SUS, 1X4/1X5 cable admin
| +
Thu Jul 17 17:08:58 2014, Harry, Update, General, 1X2 Rack Changes
| +
Thu Jul 17 21:01:28 2014, Manasa, Update, General, 1X2 Rack Changes
| +
Thu Jul 17 22:08:14 2014, Koji, Update, General, 1X2 Rack Changes
| +
Mon Sep 24 17:03:39 2012, Jenne, Update, PEM, 1X1 rack power
| +
Tue Nov 10 12:41:23 2020, gautam, Update, IOO, 1W —> IMC
| +
Sat Apr 17 18:30:12 2010, Zach, Update, Green Locking, 1W NPRO output profile
| +
Mon Apr 19 11:31:04 2010, Aidan, Update, Green Locking, 1W NPRO output profile
| +
Tue Apr 20 13:02:14 2010, Zach, Update, Green Locking, 1W NPRO output profile
| +
Tue Apr 20 13:37:36 2010, Jenne, Update, Green Locking, 1W NPRO output profile
| +
Tue Apr 20 19:37:02 2010, Koji, Update, Green Locking, 1W NPRO output profile
| +
Mon Apr 11 17:03:41 2016, Steve, Update, Calibration-Repair, 1W Innolight repair completed
| +
Mon Mar 21 14:29:32 2016, Steve, Update, Calibration-Repair, 1W Innolight laser repair diagnoses
|
Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....?
|
Mon May 24 08:38:26 2021, Chub, Update, Electronics, 18-bit AI, 16-bit AI and 16-bit AA
| +
Tue Nov 17 14:31:25 2015, ericq, Update, CDS, 16Hz frame writing temporarily disabled
| +
Tue Nov 17 20:57:43 2015, ericq, Update, CDS, 16Hz frame writing running again
|
Thu Apr 30 05:49:06 2009, Yoichi, Update, Locking, 166MHz LO phase changed
| +
Fri May 1 01:32:43 2009, Yoichi, Update, Locking, 166MHz LO phase adjustment
| +
Fri May 1 10:04:10 2009, rob, Update, Locking, 166MHz LO phase adjustment
|
Thu Jan 28 09:17:32 2010, Alberto, Update, LSC, 166 Modulation turned off
| +
Mon Jan 25 16:30:37 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
| +
Mon Jan 25 16:46:33 2010, Alberto, Update, ABSL, 166 MHz sideband turned off
| +
Tue Jan 26 03:28:56 2010, rana, Update, ABSL, 166 MHz sideband turned off
|
Thu Dec 10 17:05:21 2009, Alberto, Configuration, LSC, 166 MHz LO SMA-to-Heliax connection repaired
| +
Thu Dec 10 13:10:25 2009, Alberto, Configuration, LSC, 166 LO Disconnected
| +
Thu Dec 10 18:31:44 2009, Alberto, Configuration, LSC, 166 LO Disconnected
| +
Fri Dec 11 09:30:09 2009, Koji, Configuration, LSC, 166 LO Disconnected
| +
Fri Dec 11 11:42:26 2009, Alberto, Configuration, LSC, 166 LO Disconnected
| +
Fri Dec 11 14:12:32 2009, rana, Configuration, LSC, 166 LO Disconnected
| +
Fri Dec 11 19:51:13 2009, Alberto, Configuration, LSC, 166 LO Disconnected
| +
Wed Apr 19 15:46:24 2017, gautam, Update, General, 1611/1811 inventory check
| +
Thu Feb 24 17:42:00 2011, Aidan, Update, Green Locking, 15% of end laser sideband power transmitted through cavity
|
Mon Feb 10 18:03:41 2014, jamie, Update, CDS, 12 core c1sus replacement
| +
Tue Oct 9 23:12:56 2012, Jenne, Update, LSC, 11MHz reconnected to EOM
| +
Fri Apr 15 12:17:39 2011, kiwamu, Update, LSC, 11MHz demod board : funny I-Q phase
|
|