    Reply  Wed Mar 14 13:16:50 2012, kiwamu, Update, LSC, A correction on Noise estimatino in the REFL33Q 
A correction on the previous elog about the REFL33Q noise:
 Rana pointed out that the whitening filter's input referred noise should not be such high (I have estimated it to be at 54 nV/sqrtHz).
In
fact the measurement was done in a condition where no laser is on the photo diode by closing the mechanical shutter at the PSL table.
Therefore
Entry  Mon Feb 9 17:09:51 2009, Yoichi, Update, Computers, A bunch of updates for the network GPIB stuff. 
During the work on ISS, we noticed that netgpibdata.py is very unreliable for SR785.
The problem was caused by flakiness of the "DUMP" command of SR785, which dumps the data from the analyzer to the client.
So I decided to use other GPIB commands to download data from SR785. The new method is a bit slower but much more reliable.
Entry  Thu Feb 18 20:24:48 2021, Koji, Summary, Electronics, A bunch of electronics received IMG_0416.jpeg
Todd provided us a bunch of electronics. I went to Downs to pick them up this afternoon and checked the contents in the box. Basically, the boxes are
pretty comprehensive to produce the following chassis


8 HAM-A coil driver chassis
7 16bit Anti-Aliasing chassis
4 18bit Anti-Imaging chassis
5 16bit Anti-Imaging
    Reply  Sat Feb 20 10:01:48 2021, gautam, Summary, Electronics, A bunch of electronics received 
Will we also be receiving the additional 34 Satellite Amplifier PCBs?
    Reply  Sat Feb 20 16:46:17 2021, Koji, Summary, Electronics, A bunch of electronics received 
We received currently available sets. We are supposed to receive more coil drivers and sat amps, etc. But they are not ready yet.

 
    Reply  Fri Mar 5 00:53:09 2021, Koji, Summary, Electronics, A bunch of electronics received 
Received additional front/rear panels. Updated the original entry and Wiki [Link]

 
    Reply  Fri Mar 5 15:03:28 2021, gautam, Summary, Electronics, A bunch of electronics received 
The PCBs for the D1002593 BIO I/F (5pcs ea of D1001050 and D1001266)
were received (from JLCPCB) today. idk what the status of the parts (digikey?) is.




Quote:


    Reply  Fri Mar 5 15:32:53 2021, Koji, Summary, Electronics, A bunch of electronics received 
The parts will be ordered by Koji The components for the additional BIO I/F have been ordered.
    Reply  Wed Mar 31 03:56:37 2021, Koji, Summary, Electronics, A bunch of electronics received P_20210331_013257.jpgP_20210331_014020.jpg
We have received 9x 18bit DAC adapter boards (D1000654)
Entry  Fri Jun 13 19:09:44 2014, Koji, Update, IOO, A blown fuse found on the euro card crate at 1X2 (IOO) rack. 
[Rana Zach Koji]
We tracked down the MC locking issue to be associated with the power supply problem. 
Replacing a fuse which had incomplete connection with the new one, the MC started locking.
Entry  Mon Apr 4 18:58:44 2011, Bryan, Configuration, Green Locking, A beam of purest green P4040042.JPG
We now have green light at the Y end. 
The set-up (with careful instructions from Kiwamu) - setting up with 100mW of IR
into the oven.
Entry  Wed Nov 17 23:45:20 2010, Jenne, Update, SUS, A bad day for suspensions StatusTable.png
[Jenne, Suresh]
Today has been a downright miserable day in the world of suspension work. Thumbs down to that:  
Entry  Tue Dec 8 09:18:07 2009, Jenne, Update, Computers, A *great* way to start the day.... 
Opening of ETMY has been put on hold to deal with the computer situation.  Currently all front end computers are down.  The DAQ AWGs are flashing
green, but everything else is red (fb40m is also green).  Anyhow, we'll deal with this, and open ETMY as soon as we can.
The computers take priority because we need them to tell us how the optics are doing while we're in the chambers, fitzing around.  We need
    Reply  Mon Oct 22 09:10:07 2012, Steve, Update, VAC, @750Torr ventOct222012.png


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Sat Jun 6 01:44:53 2009, rob , Update, Locking, ? 
Lock acquisition is proceeding smoothly for the most part, but there is a very consistent failure point near the end of the cm_step script.
Near the end of the procedure, while in RF common mode, the sensing for the MCL path of the common mode servo is transitioned from a REFL 166I
signal which comes into the LSC whitening board from the demodulator, to another copy of the signal which has passed through the common mode board, and
    Reply  Sun Jun 7 04:57:39 2009, Yoichi, Update, Locking, ? 


    
        
            Quote:
        
        
            
            Lock acquisition is proceeding smoothly for the most part, but there is a very consistent failure point near the end
    Reply  Tue Jun 9 23:25:24 2009, rob, Update, Locking, ? 


    
        
            Quote:
        
        
            
            
            
    
Entry  Tue Oct 13 05:48:39 2015, ericq, Update, LSC, :/ 
[ericq, Gautam]

Despite our best efforts, the grappa remains out of reach: the DRFPMI was not locked tonight. 

We spent a fair amount of time with the AUX X laser, as it was glitching madly again.
    Reply  Wed Feb 2 03:27:20 2011, Koji, Summary, Green Locking, 85MHz Freq divider freq_divider.pdfIMG_3816.JPGIMG_3818.JPG
The freq divider was built and installed in the beat detection path.
Attachment 1: Circuit diagram

    Input stage:  Wideband RF amp with DC block at the input and the output. The gain is 10dB typ.
    2nd stage: Ultra fast
Entry  Thu Oct 28 03:07:53 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : a health check VCO_LPF_fit.png
 I did a health check for a 80MHz VCO box. 


I started taking care with the black VCO box, which has been sitting on the SP table and will be used for converting the green beat signal
    Reply  Fri Oct 29 06:20:20 2010, kiwamu, Update, Green Locking, 80MHz VCO for green PLL : VCO calibration calibration.png
 I calibrated the VCO frequency as a function of the applied input voltage.
The range is approximately +/- 5 MHz, which is large enough to cover
the arm's FSR of 3.75MHz.
    Reply  Thu Nov 11 17:47:36 2010, kiwamu, Update, Green Locking, 80MHz VCO : improve PLL hold-in range and put a boost vco_pll.pngVCO_lfb.png
In order to enlarge the hold-in range I modified the control filter and increased
the gain by factor of 25 in the PLL.
It successfully enlarged the range, 
    Reply  Thu Nov 11 13:54:05 2010, kiwamu, Update, Green Locking, 80MHz VCO : about PLL hold-in range range_green.pngPLL.png


The hold-in range of the PLL must be greater than +/- 4MHz
in order to bring the arm cavity to its resonance. 
    Reply  Mon Nov 8 10:48:58 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good vco_pll.pngVCO_PLL.png
I measured the open loop transfer function of the 80MHz VCO's PLL while locking it to Marconi.
 This measurement is for a health check and a characterization of the PLL
    Reply  Mon Nov 8 16:03:46 2010, kiwamu, Update, Green Locking, 80MHz VCO : PLL open loop looks good 


    
        
            Quote:
        
        
            
            I measured the open
Entry  Wed Aug 11 11:51:45 2010, Gopal , Update, WIKI-40M Update, 8.5.10 - 8.11.10 Weekly Update 
Summary of this Week's Activities:
Thursday, August 5: 
X-Displacement Transfer Function Measurement
    Reply  Wed Sep 21 09:04:57 2016, Steve, Update, General, 8 hours recovery progress 8hrs.png
Good 8 hours




Quote:



The misalignment wasn't
Entry  Tue Oct 4 20:34:20 2011, Katrin, Update, Green Locking, 7kHz Peak in servo input YARM servoinput.pngservoinput2.png
[Kiwamu, Katrin]
As reported earlier an oscillation around 7kHz is an the PDH error signal. The lower spectrum show that there is a peak from 6-7kHz.
This peak is somehow  dependent on the modulation frequency. This means the peak can be shifted to a higher frequency when the modulation frequency
Entry  Thu Aug 2 04:58:00 2012, Masha, Update, PEM, 70 Meter Long Guralp 1 Cable BeforeCable.pngAfterCable.pngNewCableStrip.pngNewCableFreq.png
The parts Jenne and I ordered arrived today, so we made a long cable for Guralp
1 using a 24 + 1 wire 70 meter long cable, a female 37-pin DSub, and a 26-pin milspec.
Entry  Wed Jul 14 13:03:04 2010, Gopal , Update, WIKI-40M Update, 7.8.10 - 7.14.10 Weekly Update 
Summary of this Week's Activities:
Wed. 7/7: COMSOL Busbar tutorials; began stack design; began base; Viton rubber research
Thurs. 7/8: Completed Viton rubber research; updated materials; finished designing the base layer
Entry  Wed Aug 4 20:58:22 2010, Gopal, Update, WIKI-40M Update, 7.28.10 - 8.4.10 Weekly Update 
Summary of this week's activities:
7/28:    Finished Y-Translational 4-Stack Analysis
"Tapered Cantilever" COMSOL tutorial
Entry  Wed Jul 28 12:31:00 2010, Gopal, Update, WIKI-40M Update, 7.21.10-7.28.10 Weekly Update 
Summary of this week's activities:
7/21: Frequency Domain Analysis of rectangular bar; discussed with Koji how to convert complex eigenfrequencies into phase factors.
7/23: Created Wiki page about FDA; Journal Club
Entry  Wed Jul 21 11:57:59 2010, Gopal, Update, WIKI-40M Update, 7.14.10-7.21.10 Weekly Update 
Summary of this week's activities:
7/14: Analytical calculation of Viton spring constant; updated Viton values in models; experimental confirmation of COMSOL eigenfrequencies (single
stack layer)
Entry  Wed Oct 12 18:54:02 2011, Katrin, Update, Green Locking, 60 Hz oscillation due to broken BNC cable 
There was a 60 Hz and 120 Hz oscillation on the green PDH photo diode output. After a long search, I could identify that
the source was a broken BNC cable which was connected to the photo diode. I exchanged that BNC cable and the 60 Hz
and 120 Hz are gone :-)
    Reply  Sat Dec 17 00:00:03 2011, kiwamu, Update, Green Locking, 60 Hz line nose gone 


    
        
            Quote from #6126
    
   
        
            
            As
Entry  Thu Oct 21 12:15:02 2010, rana, Update, PEM, 6.9 Mag EQ in Gulf of California 

    
        
            Magnitude

           6.9
        
        
            Date-Time

           
            
                Thursday, October 21, 2010 at 17:53:14 UTC
                Thursday,
Entry  Wed Jul 7 11:35:59 2010, Gopal, Update, WIKI-40M Update, 6.30.10 - 7.7.10 Weekly Update  
Summary of this Week's Activities:
6/30: 2nd and 3rd drafts of Progress Report
7/1: 4th draft and final drafts of Progress Report; submitted to SFP
Entry  Wed Jun 30 11:35:06 2010, Gopal , Update, General, 6.23.10 - 6.30.10 Weekly Update 
Summary of this Week's Activities:
6/23: LIGO Safety Tour; Simulink Controls Tutorial
6/24: Simulink Diagram for Feedback Loop; Constructed Pendulum Transfer Function; Discussion with Dr. Weinstein
Entry  Wed Jun 23 12:31:36 2010, Gopal, Update, General, 6.16.10-6.23.10 Weekly Update 
Summary of This Week's Activities:
6/16: LIGO Orientation; First Weekly Meeting; 40m tour with Jenne; Removed WFS Box Upper Panel, Inserted Cable, Reinstalled panel
6/17: Read Chapter 1 of Control Systems Book; LIGO Safety Meeting; Koji's Talk about PDH Techniques, Fabry-Perot Cavities, and Sensing/Control;
Entry  Fri Mar 13 03:10:35 2015, Jenne, Update, LSC, 6+ CARM->REFL transitions, 1 DARM->AS transition AS55whitening_lockloss_12March2015.pdfMoreDARMB_powerWentDown_12March2015.pngcarm_cm_up_zip.sh.gz
Much more success tonight.  I only started my tally after
I got the CARM transition to work entirely by script, and I have 6 tally marks, so I probably made the CARM to RF-only transition
7 or maybe 8 times tonight in total.  Unfortunately, I only successfully made the DARM transition to AS55 once.   
    Reply  Fri Mar 13 14:11:59 2015, rana, Update, LSC, 6+ CARM->REFL transitions, 1 DARM->AS transition 
Since the DARM_OUT signal is only 500 counts_peak, I don't see why AS55 whitening needs to be switched on. Maybe in a couple weeks after the lock is robust. In any case, its much better to do the
switching BEFORE you're using AS55, not after.
    Reply  Wed Aug 10 15:34:24 2016, Steve, Update, SUS, 6 in-lbs torque driver for wire clamp screw 
The 7.5 in-lb of Wiha seems at the upper end of torque range for a 4-40 SS screw

Wiha 28502 ordered with range 5 -10 in-lb for silver plated 4-40 screws

Do not trust the Venzo torque wrench under 2 Nm ! It miss lead me.
Entry  Mon Sep 14 23:12:49 2015, ericq, Update, LSC, 55MHz modulation phase effect on PRMI PRMI_CAR_0ns.pdfPRMI_CAR_4ns.pdfdelaySweep_nominal.pdf55delay_PRMI_REFL33.pdf
With the adjustable delay line box installed in the 55MHz modulation path, I've measured the PRMI sensing matrix as a function of delay / relative
phase between the 11MHz and 55MHz modulations. The relative frequency difference of 44MHz tells us that this should be cyclical after ~23nsec of delay,
but losses in the delay cable change this; see Koji's elogs about the modulation cancellation setup for details. 
Entry  Wed Mar 25 18:48:11 2015, Koji, Summary, LSC, 55MHz demodulators inspection 
[Koji Den EricG]

We inspected the {REFL, AS, POP}55 demodulators.

Short in short, we did the following changes:
    Reply  Mon Feb 11 16:16:27 2013, Steve, Update, VAC, 55 days at atmoshere atm55d.png
CP Stat 100  sheet-covers were replaced by clean ones on open chambers BS, ITMX,
ITMY and ETMY this morning.
Try to fold the sheets such way that the clean side is facing each other, so they do not accumulate dust.
    Reply  Tue Aug 11 02:40:29 2015, ericq, Update, LSC, 50m delay lines - Rough calibrations 
Jessica will soon ELOG about some measurements suggesting that the conductive connector-ized ALS delay line enclosure is the way to go, when considering
crosstalk between the delay lines. It is currently mounted and hooked up on the LSC rack, though I need to make a bunch of new SMA cables now that
I think a semi-permanent arrangement has been reached. 
Entry  Thu Jun 26 14:06:00 2008, Masha, Update, General, 500mW INNOLIGHT NPRO info 500mW_NPRO.JPG
Below is the placement of 500mW INNOLIGHT NPRO mephisto laser. It is set up on the Symmetric Port table. [IMG]elog:574/1[/IMG]
Entry  Thu May 9 02:19:53 2013, Jenne, Update, Locking, 50% BS installed in POP path 
Koji had the good idea of trying to measure the motion of the POP beam, and feeding that signal to PRM yaw to stabilize the motion.  To facilitate
this, I have installed a 50% beam splitter before the POP 110/22 PD (so also before the camera). 
Before touching anything, I locked the PRM-ITMY half-cavity so that I had a constant beam at POP.  I measured the POP DC OUT to be 58.16 counts. 
Entry  Tue Jul 29 11:50:01 2008, Jenne, Update, Environment, 5.6 Earthquake  
Earthquake Details
Magnitude 5.6
Date-Time
Entry  Thu Jun 4 23:39:23 2009, pete, Update, PEM, 5 days, 20 days of accelerometers acc_5day.pngacc_20days.png
Looks like yesterday was particularly noisy.  It's unclear to me why diurnal variation much more visible in MC1_Y, and why the floor wanders.
 
The first plot shows 5 days.  The second plot shows 20 days.
ELOG V3.1.3-