40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 330 of 348  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Authorup Type Category Subject Text Attachments
  4938   Tue Jul 5 13:35:56 2011 steveUpdateSUSPRM damping restoredThe PRM sus damping was restored. It's
side rms motion came down from 35 to 4 mV
immediately.     
  
  4952   Thu Jul 7 10:25:34 2011 steveHowToGeneralcleaning out refregeratorPlease ask the owner unless  it is
rotten. Do not put food into garbage can
inside. Take them outside so you are not
  
  4953   Thu Jul 7 13:57:28 2011 steveHowToSAFETYhow not toI found baked allen keys on the top of
the clean optics cabinet.  Somewhat
heavy box that can come down in an earthquake
  
  4960   Mon Jul 11 14:03:37 2011 steveHowTolorehow to visit your old labAlberto is visiting us from Australia.
He brought some terrific presents. It is
going to be very demanding task to wait for
 P1080069.JPG 
  4976   Fri Jul 15 16:14:00 2011 steveUpdateSUSBS oplev error signal spectra   BS_opl_ersig.pdf 
  4981   Mon Jul 18 10:24:48 2011 steveHowToGeneralsolvent bottles for cleaning opticsEach bottle has matched seals. They are
not interchangeable.
It is critical that the solvent do
 P1080090.JPG 
  4983   Mon Jul 18 15:51:04 2011 steveUpdateSUSETMY spectra of oplev error signal   ETMYopler.png 
  4987   Tue Jul 19 09:19:14 2011 steveUpdateSUSPRM damping restoredThe PRM watchdogs were tripped. The side
was kicked up to 180mV Damping was restored.
  
  4989   Tue Jul 19 10:54:14 2011 steveUpdateGenerallarge sensor card can not be foundPlease return sensor card to  laser
log box so others can use it. We have only
one larger fluorescent sensor card.
  
  5001   Wed Jul 20 14:42:34 2011 steveUpdateSUSoplev gains todayC1:SUS-ETMX_OLPIT_GAIN set to 1.0    
OLYAW 1.0
               
  
  5011   Thu Jul 21 10:08:30 2011 steveUpdateSUSsus sensor summaryOSEM voltages to be corrected at upcoming
vent: threshold ~ 0.7-1.2V, ( at 22 out of
50 )
 sus_sensor.png 
  5014   Thu Jul 21 16:06:35 2011 steveUpdateSUSoplev gains today checked by conlog Present values agree with conlog
records. It can be concluded that there were
no big changes made. There are some 0.1-0.2
  
  5016   Fri Jul 22 10:13:41 2011 steveUpdateVACRGA scan at day 213   pd70m213scan.jpg 
  5017   Fri Jul 22 10:24:34 2011 steveUpdateVACpressure plot at day 213Dec 21, 2010 we pumped down the MARK4 rebuilt
40m-IFO and the malev has been pumping on
it since than
 p.jpg 
  5029   Mon Jul 25 11:46:28 2011 steveUpdateSUSETMY sus problem hunt[Kiwamu / Steve]
We checked
 ETMY_AA_ADC.png 
  5037   Tue Jul 26 11:38:45 2011 steveUpdateSUSETMY bias checked 
 I test drove ETMY biases.
PITCH  worked well in slow and
  
  5043   Wed Jul 27 10:10:12 2011 steveUpdatePSLlocking status 80 days: PMC is drifting  80dpmcMC.jpg 
  5047   Wed Jul 27 15:38:01 2011 steveUpdateVACbeam traps for vacuumWe have cleaned, baked, rga scaned traps
for vacuum. Thorlabs LB1 on 1" OD ss
posts and forks. The effective surface area
 P1080095.JPG 
  5050   Wed Jul 27 15:49:56 2011 steveUpdateSAFETYManuel receives safety trainingOur surf student Manuel Marchiò
received 40m specific safety training today.
 P1080096.JPG 
  5055   Thu Jul 28 16:26:42 2011 steveUpdateSUSITMX, ITMY & ETMY OSEM gains adjusted 
OSEM damping gains were adjusted
by observing  real time dataviewer to
  
  5061   Fri Jul 29 16:04:51 2011 steveUpdateSUSETMX, PRM & SRM OSEM gains setJamei fixed the computer. Now I had a healthier
ETMX with SIDE signal that allowed me to
set gains to get Q of 5
  
  5080   Mon Aug 1 08:52:37 2011 steveUpdateVACpreparation to ventBoth arms locked easely around 1V transmited. 
We should recenter oplevs.
 pztsteering.pngvac1Aug2011.pngPEM200d.jpg 
  5082   Mon Aug 1 16:06:05 2011 steveUpdateSUSoplevs are centeredKiwamu, Koji and Steve,
Arm aligned separatly and oplev qpds
were centered  including BS. Than we
  
  5083   Mon Aug 1 17:47:37 2011 steveUpdateASCwhat is not workingSUS-ETMY_QPD is not responding. It is reading
zero in dataviewer and 4,400 counts on QPD
MEDM screen.......must be wrong cable connected
  
  5104   Wed Aug 3 09:40:13 2011 steveUpdateVACventThe vacuum system is coming up to atm.
The vent was started with slow N2 flow. The
PSL output is blocked 2 places on the table.
 pzt2011Aug3.png 
  5109   Wed Aug 3 14:20:49 2011 steveUpdateSUSITMX and PRM damping restoredITMX watchdog tripped around 5 Torr 
and the PRM around 450 Torr of this vent.
They were restored than.
  
  5111   Wed Aug 3 16:18:30 2011 steveUpdateVACvent is almost finishedP1 at 750 Torr,  Vent valve VV1 is
left open to atm. It will reach equilibrium
in an hour. The PSL power is not turned down
 vent8h.jpg 
  5116   Thu Aug 4 08:25:51 2011 steveUpdateSUSsus at atmITMX and PRM moved alot.  BS and  
ITMY just a little based on oplev reference.
 SUSatm.pngoplevsaftervent.png 
  5123   Fri Aug 5 13:51:51 2011 steveUpdateSUScross couplingWe need a plan how to minimize cross coupling
in the OSEMs now
  
  5124   Fri Aug 5 14:03:12 2011 steveUpdateGeneralmalfunctioning crane at ETMYThe horizontal trolley drive stopped working 
at the east end this morning. It is working
intermittently. In the worst case we can
  
  5139   Mon Aug 8 13:24:00 2011 steveMetaphysicsTreasure Monday morning

    

       
            
 P1080147.JPG 
  5140   Mon Aug 8 14:21:03 2011 steveUpdatePEMParticle counts controlled

    

       
            
 P1080149.JPGP1080150.JPG 
  5142   Mon Aug 8 15:52:39 2011 steveUpdateVACback ground rga scanThe RGA region is beeing monitored during
the vent. This will tell us how clean the
RGA itself is.
 bg-d5.jpgpresBg-d5.jpg 
  5158   Tue Aug 9 16:40:12 2011 steveUpdateGeneralclean room coat counts I measured the particles coming off of
new- unused clean room coat. Tyvek, Convertors,
Allegiance #9393 measured  10 counts
 P1080155.JPG 
  5159   Tue Aug 9 16:54:47 2011 steveUpdateVACscratch on vac doorJenne found a big scratch on the north
vac door of ITMY. Fortunately it does not
reach the inner annulos 0 -ring seal.
 P1080152.JPG 
  5166   Wed Aug 10 07:59:33 2011 steveUpdateSUSthis is too dam nice

    

       
            
  
  5184   Thu Aug 11 08:29:28 2011 steveUpdateComputersdataviewer at RosalbaI'm having this problem with DTV every
morning at Rosalba only. It wants to start
with a negative GPS time and it can not connect
 gpsfmb.png 
  5193   Thu Aug 11 15:31:43 2011 steveUpdateGeneralmalfunctioning crane at ETMY

    

       
            
  
  5194   Thu Aug 11 16:07:37 2011 steveUpdateSUSETMY rack cables strain releived   P1080159.JPGP1080160.JPG 
  5212   Fri Aug 12 16:52:49 2011 steveUpdateGeneralChamber illuminator switchI'm looking for an ether net based 
power switch for turning lights on and off
for the vacuum system from MEDM screen. 
  
  5262   Thu Aug 18 10:59:04 2011 steveUpdateTreasurePrepared for drag wiping

    

       
            
  
  5264   Thu Aug 18 15:54:35 2011 steveUpdateSUSdamped and undamped OSEMsdamped sus at atm1 and freeswingging sus
at atm2
 
 5susLL.jpg8freeSUSLL.jpg 
  5268   Fri Aug 19 09:14:56 2011 steveUpdateIOOdegrading laser power at atmLight into the MC is 20 mW at atm, MC_Transmitted
~10 MW = 400 count
The PMC_T is OK but something else
 power@atm.jpg 
  5269   Fri Aug 19 10:26:53 2011 steveUpdateSUSOSEM sensor spectraFree swingging OSEM sensors LL at atm  8freeSUSosemSensors.jpg 
  5270   Fri Aug 19 15:31:53 2011 steveUpdateGeneralpower interruption rescheduled to 10-1-2011       
       
UTILITY
  
  5276   Mon Aug 22 11:40:08 2011 steveUpdateVACcranes checkedCranes are  checked and they are ready
for lifting. At the east end will use the
manual Genei-lift to put door on.
  
  5300   Thu Aug 25 08:12:09 2011 steveUpdateSUSETMY & ITMY wiped, replaced, vac door on


   
        
            
  
  5303   Thu Aug 25 17:14:49 2011 steveUpdateVACclean room fashion changesJamie is modeling our next generation 
in-vac
& clean room bonny suit  that Jenne
 P1080185.JPGP1080183.JPG 
  5306   Fri Aug 26 07:53:59 2011 steveUpdateSUSBroken UL magnet on ITMX

    

       
            
  
  5307   Fri Aug 26 10:45:17 2011 steveUpdateGeneral crane at ETMY is fixed

    

       
            
 P1080190.JPGP1080188.JPG 
ELOG V3.1.3-