ID |
Date |
Author |
Type |
Category |
Subject |
4983
|
Mon Jul 18 15:51:04 2011 |
steve | Update | SUS | ETMY spectra of oplev error signal |
|
Attachment 1: ETMYopler.png
|
|
4987
|
Tue Jul 19 09:19:14 2011 |
steve | Update | SUS | PRM damping restored |
The PRM watchdogs were tripped. The side was kicked up to 180mV Damping was restored. |
4989
|
Tue Jul 19 10:54:14 2011 |
steve | Update | General | large sensor card can not be found |
Please return sensor card to laser log box so others can use it. We have only one larger fluorescent sensor card. |
5001
|
Wed Jul 20 14:42:34 2011 |
steve | Update | SUS | oplev gains today |
C1:SUS-ETMX_OLPIT_GAIN set to 1.0 OLYAW 1.0
ETMY -0.2 -0.2
ITMY 2.0 -2.0
ITMX 0.5 0.5
BS 0.4 -0.4
PRM 0.5 -0.7
SRM 1.0 1.0
Earlier today Rana and I made power spectra of ETMY_OPLEV_ERROR signals with servo on and off.
It was indicating that the servo is not doing anything. These gain values were not set since IFO rebuilt.
Valera's entries were searched also. He did not do such thing. Rana may know where it is in the elog if it happened. |
5011
|
Thu Jul 21 10:08:30 2011 |
steve | Update | SUS | sus sensor summary |
OSEM voltages to be corrected at upcoming vent: threshold ~ 0.7-1.2V, ( at 22 out of 50 )
ITMX_UL, UR, LL, LR, SD
ITMY_UL
ETMX_UL, UR, LL, LR, SD
ETMY_UL
SRM_UL, UR, LL
MC2_UR_SD
BS_UR, SD
MC3_UL, LR, LL
|
Attachment 1: sus_sensor.png
|
|
5014
|
Thu Jul 21 16:06:35 2011 |
steve | Update | SUS | oplev gains today checked by conlog |
Present values agree with conlog records. It can be concluded that there were no big changes made. There are some 0.1-0.2 gain and one polarity changes during the periods of Valera's visits.
|
5016
|
Fri Jul 22 10:13:41 2011 |
steve | Update | VAC | RGA scan at day 213 |
|
Attachment 1: pd70m213scan.jpg
|
|
5017
|
Fri Jul 22 10:24:34 2011 |
steve | Update | VAC | pressure plot at day 213 |
Dec 21, 2010 we pumped down the MARK4 rebuilt 40m-IFO and the malev has been pumping on it since than |
Attachment 1: p.jpg
|
|
5029
|
Mon Jul 25 11:46:28 2011 |
steve | Update | SUS | ETMY sus problem hunt |
[Kiwamu / Steve]
We checked some electronics noise on the ETMY shadow sensor system.
Noise from the WF, AA board and ADC are below the shadow sensor spectra on ETMY.
It means something funny is going on in the upstream side (including the satelight box and shadow sensors)
OR the coil drivers side are going crazy ??
As Rana pointed out in his entry (#5025), the spectra of the shadow sensors on ETMY were quite bad below 3 Hz. The floor are higher than that of ETMX by factor of 10 or so.
To check if the noise comes from some of the electronics, we disconnected D15-sub from pd to whitening in.
The spectra with/without shadow sensors are attached below.
The curves in brown and green are the ones taken when the shadow sensors were disconnected from the WF board.
So these two curves represent the summed noise of the WF, AA and ADC.
This tells us to look toward the OSEM.
|
Attachment 1: ETMY_AA_ADC.png
|
|
5037
|
Tue Jul 26 11:38:45 2011 |
steve | Update | SUS | ETMY bias checked |
I test drove ETMY biases.
PITCH worked well in slow and fast modes. Slow drive was from the IFO alignment screen C1:SUS-ETMY_PIT_COM and
the fast one from C1:SUS-ETMY_ASCPIT_OFFSET
YAW did not. It was always diagonal. It was specially bad with the fast drive. I compared them with ETMX. ETMX yaw is diagonal a little bit too.
The OPLEV return spots on the qpd ETMX and ETMY are big 5-6 mm diameter. The ETMY spot has weird geometry to qpd. |
5043
|
Wed Jul 27 10:10:12 2011 |
steve | Update | PSL | locking status |
80 days: PMC is drifting |
Attachment 1: 80dpmcMC.jpg
|
|
5047
|
Wed Jul 27 15:38:01 2011 |
steve | Update | VAC | beam traps for vacuum |
We have cleaned, baked, rga scaned traps for vacuum. Thorlabs LB1 on 1" OD ss posts and forks. The effective surface area is 43 x 18 mm of stacked razors.
Seven pieces are mounted on New Focus #9962 1" OD SS vented- pedestrals to 5.5" center height and 5 pieces to 4.875" |
Attachment 1: P1080095.JPG
|
|
5050
|
Wed Jul 27 15:49:56 2011 |
steve | Update | SAFETY | Manuel receives safety training |
Our surf student Manuel Marchiò received 40m specific safety training today. |
Attachment 1: P1080096.JPG
|
|
5055
|
Thu Jul 28 16:26:42 2011 |
steve | Update | SUS | ITMX, ITMY & ETMY OSEM gains adjusted |
OSEM damping gains were adjusted by observing real time dataviewer to get Q of 5
OSEMs were kicked up one by one with 200 counts ~1sec. The error signal was optimized to get 1/2 of exitation amplitude at the 5th sinusoid wave.
C1: SUS-ITMX_SUSPOS_N1 gain 111 -> 65, PIT 7.2 -> 8, YAW 12 -> 6, SIDE 280
ITMY 277 -> 120, 19.2 -> 7, 24 -> 19, 420 -> 470
ETMY 10 -> 32, 20 -> 3, 20 -> 10, 50
ETMX 22 -> 25, 3, 3, -170
ETMX having problems: 1, YAW can not be excited
2, SIDE has no error signal in dataviewer. Sensing voltage on MEDM screen 0.142V
|
5061
|
Fri Jul 29 16:04:51 2011 |
steve | Update | SUS | ETMX, PRM & SRM OSEM gains set |
Jamei fixed the computer. Now I had a healthier ETMX with SIDE signal that allowed me to set gains to get Q of 5
The Y arm restore locked the arm at TRY -out 2.4V, the X arm still did not lock or align to lock. It has some fringes.
ETMX POS gain 22 -> 17, PIT 3 -> 1, YAW 3, SIDE -170 -> -110
PRM 50 -> 30, 1, 2, 50
SRM 55 -> 20, 2.4 -> 1.5, 4.8 -> 2, 140 -> 100
Now all SUS OSEM gains are set |
5080
|
Mon Aug 1 08:52:37 2011 |
steve | Update | VAC | preparation to vent |
Both arms locked easely around 1V transmited. We should recenter oplevs. |
Attachment 1: pztsteering.png
|
|
Attachment 2: vac1Aug2011.png
|
|
Attachment 3: PEM200d.jpg
|
|
5082
|
Mon Aug 1 16:06:05 2011 |
steve | Update | SUS | oplevs are centered |
Kiwamu, Koji and Steve,
Arm aligned separatly and oplev qpds were centered including BS. Than we realigned manually DRM and centered their qpds.
ALL SUS oplevs were centered to resonating cavities. |
5083
|
Mon Aug 1 17:47:37 2011 |
steve | Update | ASC | what is not working |
SUS-ETMY_QPD is not responding. It is reading zero in dataviewer and 4,400 counts on QPD MEDM screen.......must be wrong cable connected
IP-POS is sick. Last time alive 7-19-2011
IP-ANG beam is clipping on pick-up mirror at ETMY chamber. This will have to be fixed at the vent. The qpd itself is responding to light. |
5104
|
Wed Aug 3 09:40:13 2011 |
steve | Update | VAC | vent |
The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table. |
Attachment 1: pzt2011Aug3.png
|
|
5109
|
Wed Aug 3 14:20:49 2011 |
steve | Update | SUS | ITMX and PRM damping restored |
ITMX watchdog tripped around 5 Torr and the PRM around 450 Torr of this vent. They were restored than.
We are at 580 Torr now. |
5111
|
Wed Aug 3 16:18:30 2011 |
steve | Update | VAC | vent is almost finished |
P1 at 750 Torr, Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is blocked at two places inside the enclosure.
The low power 20 mW input MC can be locked tonight.
Next day's - Thursday notes:
We reached 760 Torr of atm in 8 hrs at 1.7 Torr/ min with 5 cylinders of instrument grade air.
Used 500 PSI of nitrogen to get to 20 Torr at first. This flow and the first cylinder of N2 has to be slower next time.
We did the following:
1, oplevs were centered on locked caveties 2 days ago
2, just before vent we rechecked arms pointing, they wre still locking
3,eloged strain gages and turned HVs off at PZT-steering at 1Y3 rack and OMC-PZT ps at 1X2 aux rack. They were actually off.
4,,checked jam nuts 6 places x 3
5, turned oplev servos off
6, eloged SUS summery page
7, checked particle counts at ITMY: 1 micron 300, 0.5 micron 3K, 0.3 micron 30K particles / cft-min. All three cranes were wiped 2 days ago.
8, blocked laser into IFO: main 1064 in 1.25W were blocked by manual 2 blocks on PSL table. The PSL output shutter was left open to be triggered by interlock at P1 3 mTorr. It did!
Aux NPRO-AP and green light input at both ends were blocked. |
Attachment 1: vent8h.jpg
|
|
5116
|
Thu Aug 4 08:25:51 2011 |
steve | Update | SUS | sus at atm |
ITMX and PRM moved alot. BS and ITMY just a little based on oplev reference. |
Attachment 1: SUSatm.png
|
|
Attachment 2: oplevsaftervent.png
|
|
5123
|
Fri Aug 5 13:51:51 2011 |
steve | Update | SUS | cross coupling |
We need a plan how to minimize cross coupling in the OSEMs now |
5124
|
Fri Aug 5 14:03:12 2011 |
steve | Update | General | malfunctioning crane at ETMY |
The horizontal trolley drive stopped working at the east end this morning. It is working intermittently. In the worst case we can take the door off with the manual -Genie- lift.
I'm working with Konecrane to solve the wormgear drive problem. |
5139
|
Mon Aug 8 13:24:00 2011 |
steve | Metaphysics | Treasure | Monday morning |
Quote: |
Just a reminder that a film crew will be here Monday morning, filming Christian Ott for some Discovery channel show.
They are slated to be here from 8am to 12:30pm or so. They will take a couple of shots inside the lab, and the rest of the filming should be of Christian in the control room (which they will "clean up" and fit with "sexy lighting"). I will try to be here the whole time to oversee everything.
|
Konecrane Fred was early this morning. He diagnosed the ETMY crane horizontal drive gear box dead and left just before the film crew showed up.
New gear box should be here by the end of this week for installation.
The lab air quality is high ~20,000 counts of particles of 0.5 micron. Keep an eye on this before you open the chamber. |
Attachment 1: P1080147.JPG
|
|
5140
|
Mon Aug 8 14:21:03 2011 |
steve | Update | PEM | Particle counts controlled |
Quote: |
[Jenne, Kiwamu]
While Kiwamu was finalizing the X green alignment, I started to prepare to remove the ETMY door, and begin checking out its OSEMs, etc, so we could start moving it to it's new place, and figure out why it's been wonky for a while. I ran the particle counter, and we have a factor of ~5 more particles than normal. Kiwamu and I agreed not to open ETMY. Since we had briefly opened the IOO and Output Optics chambers to check the X green's position on the PSL table, we immediately shut those doors. They were probably open for ~15 minutes or so. (Yes Steve, we should have checked before opening any doors, but at least we remembered to check at all, and the doors were only open for a few minutes rather than for a few hours.)
I attach a 24hrs trend of the particle counts, for reference. It looks like it's been a little high for a while, but today it's really dirty in the air.
|
The east end particle count is 155K for 0.3 micron and 15K for 0.5 micron counts/cf min. In order to minimize diffusion of dirt into the IFO we set up the mobile HEPA with CP Stat 100 tent.
This set up gives us practically ZERO inside the tent |
Attachment 1: P1080149.JPG
|
|
Attachment 2: P1080150.JPG
|
|
5142
|
Mon Aug 8 15:52:39 2011 |
steve | Update | VAC | back ground rga scan |
The RGA region is beeing monitored during the vent. This will tell us how clean the RGA itself is.
|
Attachment 1: bg-d5.jpg
|
|
Attachment 2: presBg-d5.jpg
|
|
5158
|
Tue Aug 9 16:40:12 2011 |
steve | Update | General | clean room coat counts |
I measured the particles coming off of new- unused clean room coat. Tyvek, Convertors, Allegiance #9393 measured 10 counts of 0.3 micron at 1 minute and 0 count at 7 minute.
The 0.5 micron size measured 0 at both times. Jenne's used coat measured 20 counts of 0.3 micron and 0 counts for 0.5 micron at 1 minute. ( counts / cf- min)
The HEPA tent background is consistently 0 when it's CP STAT 100 curtains are closed. |
Attachment 1: P1080155.JPG
|
|
5159
|
Tue Aug 9 16:54:47 2011 |
steve | Update | VAC | scratch on vac door |
Jenne found a big scratch on the north vac door of ITMY. Fortunately it does not reach the inner annulos 0 -ring seal.
This is precisely what we have to avoid to preserve our vacuum system!
|
Attachment 1: P1080152.JPG
|
|
5166
|
Wed Aug 10 07:59:33 2011 |
steve | Update | SUS | this is too dam nice |
Quote: |
Suresh and I tweaked the OSEM angles in ETMX yesterday. Last night the ETMs were left free swinging, and today I ran Rana's peakFit scripts on ETMX to check the input diagnolization:

It's well inverted, but the matrix elements are not great:
pit yaw pos side butt
UL 0.3466 0.4685 1.6092 0.3107 1.0428
UR 0.2630 -1.5315 1.7894 -0.0706 -1.1859
LR -1.7370 -1.5681 0.3908 -0.0964 0.9392
LL -1.6534 0.4319 0.2106 0.2849 -0.8320
SD 1.0834 -2.6676 -0.9920 1.0000 -0.1101
The magnets are all pretty well centered in the OSEMS, and we worked at rotating the OSEMS such that the bounce mode was minimized.
Rana and Koji are working on ETMY now. Maybe they'll come up with a better procedure.
|
|
5184
|
Thu Aug 11 08:29:28 2011 |
steve | Update | Computers | dataviewer at Rosalba |
I'm having this problem with DTV every morning at Rosalba only. It wants to start with a negative GPS time and it can not connect to the frame builder.
Normally after a few time of starting it, it will work. |
Attachment 1: gpsfmb.png
|
|
5193
|
Thu Aug 11 15:31:43 2011 |
steve | Update | General | malfunctioning crane at ETMY |
Quote: |
The horizontal trolley drive stopped working at the east end this morning. It is working intermittently. In the worst case we can take the door off with the manual -Genie- lift.
I'm working with Konecrane to solve the wormgear drive problem.
|
Gear box found, it's lead time one week at $825 The crane may be functional round August 25 |
5194
|
Thu Aug 11 16:07:37 2011 |
steve | Update | SUS | ETMY rack cables strain releived |
|
Attachment 1: P1080159.JPG
|
|
Attachment 2: P1080160.JPG
|
|
5212
|
Fri Aug 12 16:52:49 2011 |
steve | Update | General | Chamber illuminator switch |
I'm looking for an ether net based power switch for turning lights on and off for the vacuum system from MEDM screen. This is what I found
Jamie please take a look at it.
|
5262
|
Thu Aug 18 10:59:04 2011 |
steve | Update | Treasure | Prepared for drag wiping |
Quote: |
While waiting for the IFO team to align things (there were already ~5 people working on a ~1 person job...), I got all of our supplies prepped for drag wiping in the morning.
The syringes are still on the flow bench down the Xarm. I put fresh alcohol from unopened spectrometer-grade bottles into our alcohol drag wiping bottles.
The ITMs already had rails for marking their position in place from the last time we drag wiped. I placed marker-rails for both ETMs.
|
We should use the deionizer before drag wiping with isopropanol. |
5264
|
Thu Aug 18 15:54:35 2011 |
steve | Update | SUS | damped and undamped OSEMs |
damped sus at atm1 and freeswingging sus at atm2
|
Attachment 1: 5susLL.jpg
|
|
Attachment 2: 8freeSUSLL.jpg
|
|
5268
|
Fri Aug 19 09:14:56 2011 |
steve | Update | IOO | degrading laser power at atm |
Light into the MC is 20 mW at atm, MC_Transmitted ~10 MW = 400 count
The PMC_T is OK but something else is drifting. |
Attachment 1: power@atm.jpg
|
|
5269
|
Fri Aug 19 10:26:53 2011 |
steve | Update | SUS | OSEM sensor spectra |
Free swingging OSEM sensors LL at atm |
Attachment 1: 8freeSUSosemSensors.jpg
|
|
5270
|
Fri Aug 19 15:31:53 2011 |
steve | Update | General | power interruption rescheduled to 10-1-2011 |
UTILITY & SERVICE INTERRUPTION
**PLEASE POST**
Building: Central Engineering Services (C.E.S.)
Date: Saturday, October 1, 2011
Time: 8:00 a.m. To 9:00 a.m.
Interruption: Electricity
Contact: Mike Anchondo ext. 4999 Tom Brennan 4984
*This interruption is required for maintenance of high voltage switchgear in Campus Sub Station.
(If there is a problem with this Interruption, please notify
the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.)
Reza Ohadi,
Director, Campus Operations & Maintenance |
5276
|
Mon Aug 22 11:40:08 2011 |
steve | Update | VAC | cranes checked |
Cranes are checked and they are ready for lifting. At the east end will use the manual Genei-lift to put door on. |
5300
|
Thu Aug 25 08:12:09 2011 |
steve | Update | SUS | ETMY & ITMY wiped, replaced, vac door on |
Quote: |
We've closed up ETMX:
- the optic was drag wiped
- the suspension tower was put back in place
- earthquake stops were backed off the appropriate number of turns, and de-ionized
- chamber door was put on
|
jamie, jenne, kiwamu, suresh, steve
ETMY and ITMY were treated the same way as ETMX. The BS chamber was closed with heavy vac door yesterday also. The IOO access connector's inner jamnuts are torqued to 45 ft/lbs as all vac door bolts.
The vac envelope is ready for pumpdown condition, except ITMX chamber with light atm door cover.
Jenne will summeries the condition of dust on the TMs before and after the drag wipes. |
5303
|
Thu Aug 25 17:14:49 2011 |
steve | Update | VAC | clean room fashion changes |
Jamie is modeling our next generation in-vac & clean room bonny suit that Jenne and myself already tested.
It is quite bearable with our traditional cleanroom beret-bouffant cap. Please use these in the future.
This will help to avoid the farther degradation of somewhat dusty 40m vac envelope.
It is the required dress code to enter the clean assembly room in the 40m.
We have small, med, large and x-large in stock. I'm getting larger sizes.
It will not allow certain people to climb inside the vacuum chamber in dirty pants. |
Attachment 1: P1080185.JPG
|
|
Attachment 2: P1080183.JPG
|
|
5306
|
Fri Aug 26 07:53:59 2011 |
steve | Update | SUS | Broken UL magnet on ITMX |
Quote: |
Dmass just reminded me that the usual procedure is to bake the optics after the last gluing, before putting them into the chambers. Does anyone have opinions on this?
On the one hand, it's probably safer to do a vacuum bake, just to be sure. On the other hand, even if we could use one of the ovens immediately, it's a 48 hour bake, plus cool down time. But they're working on aLIGO cables, and might not have an oven for us for a while. Thoughts?
|
Follow full procedure for full strength, minimum risk |
5307
|
Fri Aug 26 10:45:17 2011 |
steve | Update | General | crane at ETMY is fixed |
Quote: |
The horizontal trolley drive stopped working at the east end this morning. It is working intermittently. In the worst case we can take the door off with the manual -Genie- lift.
I'm working with Konecrane to solve the wormgear drive problem.
|
New gear box installed and tested by Fred KoneCranes. |
Attachment 1: P1080190.JPG
|
|
Attachment 2: P1080188.JPG
|
|
5309
|
Fri Aug 26 15:59:33 2011 |
steve | Update | General | drawer cabinet moves in |
manufacturer info
Jamie and Shuresh moved in Jenne's 11 drawers cabinet and relocated old note book boxes on the inside of the vac tube. |
Attachment 1: P1080192.JPG
|
|
5322
|
Tue Aug 30 10:49:29 2011 |
steve | Update | SUS | BS & PRM damping restored |
I have restored the damping of BS and PRM. Today is janitor day. He is shaking things around the lab. |
5328
|
Wed Aug 31 11:37:56 2011 |
steve | Update | Green Locking | shutter in place at east end |
Uniblitz mechanical shutter installed in the green beam path at ETMY-ISCT The remote control cable has not been connected. |
5331
|
Thu Sep 1 11:03:22 2011 |
steve | Update | VAC | back ground rga scan |
The RGA back ground at day 29 of this vent. |
Attachment 1: v70-bg-d29scan.jpg
|
|
Attachment 2: vent70tempres.jpg
|
|
5332
|
Thu Sep 1 15:07:45 2011 |
steve | Update | SUS | why ITMY is moving more ? |
Atm1, ITMY and the SRM are on the same isolation stack. So why does the SRM move twice as much?
Atm2, We should check the ITMY SIDE_OSEM before pump down. Anatomically correct, beautiful picture taken by Kiwamu on August 22 |
Attachment 1: itmy_srm_etmx.jpg
|
|
Attachment 2: P8220152.JPG
|
|
5333
|
Thu Sep 1 15:59:46 2011 |
steve | Update | SUS | light doors on at the ITMs |
Suresh, Kiwamu and Steve
Heavy chamber doors replaced by light ones at ITMX-west and ITMY-north locations. |