Entry  Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started 
Blocked PSL output beam  into IFO
Checked: HV at IOO & OMC are off, jam nuts in position,
Closed V1 and VM3, opened VV1 to N2 regulator
    Reply  Tue Sep 28 00:07:45 2010, kiwamu, Configuration, VAC, Re: slow vent has started P1_history_100927.png
(Koji, Yuta, Kiwamu)
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday, and finished on Tuesday.
Entry  Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber P1060901.JPGP1060904.JPG
(Koji, Kiwamu, Yuta)
Lots of progress for the optics placement in the vacuum chamber.
Entry  Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed 
Kiwamu, Koji, Yutah, Rana, Jan and Steve
We removed the west access connector this afternoon.
Entry  Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table IMG_3627.jpg
YES
! We got the green light coming out from the OMC chamber to the PSL table !
Entry  Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened 
[Steve, Jenne, Suresh, Koji]
The remaining test mass chambers have been opened, and have light doors in place.  Now we can do all of the rest of the IFO alignment, and
then (hopefully) button up before the New Year.
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration
so one has to pay attention that the foreline valves are open.
Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.
Entry  Tue Dec 21 16:20:09 2010, steve, Configuration, VAC, pumpdown has started 
Slow pumpdown of rebuilt IFO-mark4 started
at 3pm today.
We are at 680Torr at this minute with 1.5 Torr/min speed.
Entry  Tue Dec 21 16:34:42 2010, kiwamu, Summary, VAC, All the test masses have been wiped 
 [Jenne and Kiwamu]
 We wiped all the test masses with isopropyl alcohol.
They became apparently much cleaner.
(how to)
Entry  Wed Dec 22 15:47:22 2010, Koji, Update, VAC, Tank closing procedure 
[Jenne Kiwamu Joe Osamu Steve Koji]
Yesterday (21st), we closed the BSC and the four testmass chambers.
We splitted the team into three.
Entry  Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours slowpd12h.jpg
We have reached 200 Torr at 12 hours of slow pumping speed. Kiwamu stopped the pumping for 11 hrs last night .and I restarted it this morning.
Now RV1 is fully open with butterfly valve in place  and the second roughing  pump RP3 was just turned on.
 
    Reply  Wed Dec 22 21:38:47 2010, kiwamu, Configuration, VAC, Re:slow pumpdown at 12 hours 
I stopped the pumping at 9:30 pm. Now we are at 29 torr.


    
        
            Quote: from  #4089
        
        
            
    Reply  Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete slow2dpd.jpg
The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr
The Maglev monitoring MEDM screen "Rotating" indicator is not
working. It is on all times. Please look at Maglev controller monitor for real information.
Entry  Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on pd70d22.jpg
Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.
TP2 dry fore pump was replaced at 910mTorr
    Reply  Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming P1070364.JPGP1070358.JPG


    
        
            
             The upgrade is almost finished. I found that the passive latch lock  is
not closing down all the way. It has about a 3/8" gap.    See Atm. 1 & 2
Entry  Fri Feb 11 09:27:03 2011, steve, Configuration, VAC, RGA scan rgascan20110211.jpgpressurepd70.jpg
The RGA scan is normal at day 52 of this pump down.
Light power BS 1064nm ~25mW, ETMX 532nm ~5mW
Entry  Wed Mar 9 17:29:11 2011, steve, Summary, VAC, single O-ring protection so1.jpgP1070458.JPG
We have one single O-ring on the 40m vacuum envelope. It is on the OOC west side, facing the AP table. This O-ring has to be protected from the force
of this
door. There should be 3 shims  ~120 degrees apart to carry the full load, so it is not the O-ring that is getting squashed.
Entry  Fri May 6 15:59:40 2011, steve, Update, VAC, TP3 fore pump replaced 
Dry fore pump of TP3 replaced by brand new Varian SH-110  at  1.1 Torr_75,208 hrs
The annuloses were closed off for 25 minutes. We are back to VACUUM NORMAL mode.
The TP3 fore line pressure dropped to 44 mTorr at 25 minutes in operation.......9.4mTorr at day 2 with full annulos load
Entry  Fri Jul 22 10:13:41 2011, steve, Update, VAC, RGA scan at day 213 pd70m213scan.jpg
 
Entry  Fri Jul 22 10:24:34 2011, steve, Update, VAC, pressure plot at day 213 p.jpg
Dec 21, 2010 we pumped down the MARK4 rebuilt 40m-IFO and the malev has been pumping on it since than
Entry  Wed Jul 27 15:38:01 2011, steve, Update, VAC, beam traps for vacuum P1080095.JPG
We have cleaned, baked, rga scaned traps for vacuum. Thorlabs LB1 on 1" OD ss posts and forks. The effective surface area is 43 x 18 mm of stacked
razors.
Seven pieces are mounted on New Focus #9962  1" OD SS vented-  pedestrals to 5.5" center height and 5 pieces to 4.875"
Entry  Mon Aug 1 08:52:37 2011, steve, Update, VAC, preparation to vent pztsteering.pngvac1Aug2011.pngPEM200d.jpg
Both arms locked easely around 1V transmited.  We should recenter oplevs.
Entry  Wed Aug 3 09:40:13 2011, steve, Update, VAC, vent pzt2011Aug3.png
The vacuum system is coming up to atm. The vent was started with slow N2 flow. The PSL output is blocked 2 places on the table.
    Reply  Wed Aug 3 11:34:59 2011, kiwamu, Update, VAC, Re: vent 
An important rule during the in-vac work :
   Do not change the incident axis of the X and Y green beams.
Because of the air flows and unusual pressure in the chambers, the DC alignment of the suspensions become less reliable in terms of the beam pointing
Entry  Wed Aug 3 16:18:30 2011, steve, Update, VAC, vent is almost finished vent8h.jpg
P1 at 750 Torr,  Vent valve VV1 is left open to atm. It will reach equilibrium in an hour. The PSL power is not turned down yet. The beam path is
blocked at two places inside the enclosure.
The low power 20 mW  input  MC can be locked tonight.
Entry  Mon Aug 8 15:52:39 2011, steve, Update, VAC, back ground rga scan bg-d5.jpgpresBg-d5.jpg
The RGA region is beeing monitored during the vent. This will tell us how clean the RGA itself is.
 
Entry  Tue Aug 9 16:54:47 2011, steve, Update, VAC, scratch on vac door P1080152.JPG
Jenne found a big scratch on the north vac door of ITMY. Fortunately it does not reach the inner annulos 0 -ring seal.
This is precisely what we have to avoid to preserve our vacuum
system!
Entry  Wed Aug 10 22:47:22 2011, rana, Summary, VAC, Vacuum Workstation (linux3) re-activated 
For some reason the workstation at the vac rack was off and unplugged. Nicole and I plugged its power back in to the EX rack.
I turned it on and it booted up fine; its not dead. To get it on to the network I just made the conversion from 131.215 to 192.168 that Joe had
done on all the other computers several months ago.
Entry  Mon Aug 22 11:40:08 2011, steve, Update, VAC, cranes checked 
Cranes are  checked and they are ready for lifting. At the east end will use the manual Genei-lift to put door on.
Entry  Tue Aug 23 16:23:33 2011, Jenne, Update, VAC, Access connector in place 
[Steve, Bob, Jamie, Kiwamu, Valera, Jenne]
The access connector is now in place, in preparation for pump-down.  Tomorrow (hopefully) we will do all the other doors.
 
Entry  Thu Aug 25 17:14:49 2011, steve, Update, VAC, clean room fashion changes P1080185.JPGP1080183.JPG
Jamie is modeling our next generation  in-vac
& clean room bonny suit  that Jenne and myself already tested.
It is quite bearable with our traditional cleanroom beret-bouffant cap. Please use these in the future.
Entry  Thu Sep 1 11:03:22 2011, steve, Update, VAC, back ground rga scan v70-bg-d29scan.jpgvent70tempres.jpg
The RGA back ground at day 29 of this vent.
Entry  Wed Sep 7 00:47:51 2011, Jenne, Update, VAC, PUMP is a GO! 
Steve and Jamie:  After Jamie checks the ITM free swingings, please put
on the ITM heavy doors and start the pump!  For real this time!!! Yeah!
Entry  Wed Sep 7 12:03:49 2011, steve, Update, VAC, Pump down has started 
Jamie and Steve
We closed ITMX and ITMY chambers and started pumping around 11am
What we did before:
    Reply  Wed Sep 7 18:19:37 2011, steve, HowTo, VAC, stop pump down for overnight 


    
        
            Quote:
        
        
            
            Jamie and Steve
    Reply  Wed Sep 7 21:45:16 2011, kiwamu, Update, VAC, pump stopped. Pressure is at 450 mtorr vacuum.png
I stopped puming at 9:30 PM and the pressure in P1 is at 450 mtorr.
I followed exactly he procedure that Steve noted on his elog entry.
Here is a plot of the histroy of our pumping today.
    Reply  Thu Sep 8 10:50:44 2011, steve, Update, VAC, pumpdown #71 comleted pd#71.jpgmaglevpd.jpg
Vacuum status:  " vacuum normal"   CC1 pressure 5e-5 Torr
Slow roughing through butterfly valve took 11 hours at 1-2 Torr/min speed.  We had a leak at the metal hose connecting o-ring  that became
visible  at 200 Torr.
Entry  Wed Sep 21 11:35:07 2011, steve, Update, VAC, RGA scan rgascanpd71m14d.jpg
RGA scan with maglev pumping speed at day 14 of the pump down.
The larger inserted box contains the tuning parameters of the SRS  200 amu RGA
Entry  Fri Sep 23 16:25:01 2011, steve, Update, VAC, vac rack UPS battery replaced P1080252.JPGP1080254.JPG
APC Smart -UPS 2200   model: SUA2200RM2U   batteries were replaced by compatible RBC43, 8x  12V5A
Entry  Fri Sep 30 18:35:42 2011, steve, kiwamu, Update, VAC, vacuum set for poweroutage prepforpoweroutage.png
We did the following:
1, closed V1, VM1,  annuloses: VASE, VASV, VABS, VAEV,  VAEE and VA6
2, stop rotation of Maglev-TP1, waited to decellerate and turned off power to it
    Reply  Mon Oct 3 08:38:21 2011, steve, Summary, VAC, Recovery from the power shutdown is completed poweroutage.jpg
 
I failed to start Rana's favorit anciant desktop computer at the vac rack. He has to baby this old beast just a little bit more.
Vacuum status: Vac Normal was reached through Farfalla: Rga was switched back to IFO and and Annuloses are beeing pumped now.
    Reply  Thu Oct 13 21:40:59 2011, rana, Summary, VAC, Recovery from the power shutdown is completed 
 As it turns out Steve is not crazy in this particular instance: the vacuum computer, linux3 , has some issues. I can login just fine, but trying
to open a terminal makes the CPU rail and the RAM max out and eventually the machine freezes.
Under KDE, I can open a terminal OK as root, but if I then try a 'su controls', the same issue happens. Let's wait for Jamie to fix this.
Entry  Fri Oct 28 18:33:59 2011, steve, Update, VAC, leaking nitrogen line fixed allvalvesclosed.png
I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply line to atm. Fixed leak. 
This was done fast so the pumps did not have to be shut down. Pressurized supply line and open valves to
"Vac Normal" condition in the right sequence.
    Reply  Mon Oct 31 08:55:19 2011, steve, Update, VAC, pressure plot at day 53 pd71-m-d53.png


    
        
            Quote:
        
        
            
            I was lucky to notice that the nitrogen supply line to the vacuum valves was leaking. Closed ALL valves. Open supply
Entry  Mon Nov 14 15:46:14 2011, steve, Update, VAC, TP2's forepump changed drypump.png
The foreline pressure of TP2 was 1.4 Torr this morning. This drypump worked well for ten months.
Recently rebuilt  drypump with new seal was swapped in.
This is how you do it: close  V1,  V4 and turn off TP2. Replace drypump and start up TP2
Entry  Fri Nov 18 16:37:14 2011, steve, Update, VAC, preparing for ac power interruption planednopower.png
The vacuum is ready for no AC power for 1 hr on Sunday morning at 10am
 
I did the follwing:
Entry  Sun Nov 20 13:51:54 2011, steve, Update, VAC, vacuum is back up after ac interruption notpumping.png
State condition: Vac Normal,          CC1 ~8e-6 Torr
The IFO pressure peaked at  8.3 mTorr after 2days of not pumping.
    Reply  Fri Jun 8 15:24:08 2012, steve, Update, VAC, RGA scan at day 276 and pressure plots 40m71pdM276d.pngpd71m276d.pngpd71d276.png


    
        
            Quote:
        
        
            

           We tried not to open chambers above 10,000 particles of 0.5 micron cf/min
    Reply  Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr sussum.pngpzt.png


    
        