    Reply  Tue Dec 18 10:43:20 2012, Steve, Update, VAC, vent has completed vent74.pngbvent.pngbefVent.png
 The 40m vacuum envelope is at atm    It took 4.5 hours at ~3 Torr/min speed. Atm1
 
What I did:
    Reply  Tue Dec 18 16:37:40 2012, Steve, Update, VAC, last RGA scan before vent pd74m36d.png36d_vacuum_normal.png
 
 
    Reply  Wed Dec 19 11:53:23 2012, Steve, Update, VAC, AC removed workingatatm.png
 Koji, Manasa, Jenne, Jamie, Bob and Steve
Access connector removed this morning and work has began in the IOO chamber.  BE WARE OF ANTS !
Entry  Thu Jan 17 17:04:49 2013, Steve, Update, VAC, vac monitor screen changed screenmod.png
The COVAC_MONITOR.adl was changed. Ion pump labeled as disconnected means: ion pump controller power turned off and ion pump gate valve control connection
disconnected.
RP2 roughing pump labeled disconnected means:  hardware  disconnected.
Entry  Thu Jan 24 08:28:35 2013, Steve, Update, VAC, when to pumpdown ? 
Reminder: I will be on vacation next week. We would have to put the access connector in tonight if I'm pumping down Friday, tomorrow.
    Reply  Thu Jan 24 14:40:09 2013, Steve, Update, VAC, RGA backgroung Screenshot.png
 RGA background with VM2 open to Maglev at day 37
 
Note: The PAN gauge of the  annulos is at atm.  Please do not vent this 200 ft long annulos line when you venting the annulos of a chamber.
    Reply  Mon Feb 11 16:16:27 2013, Steve, Update, VAC, 55 days at atmoshere atm55d.png
CP Stat 100  sheet-covers were replaced by clean ones on open chambers BS, ITMX,
ITMY and ETMY this morning.
Try to fold the sheets such way that the clean side is facing each other, so they do not accumulate dust.
Entry  Tue Feb 19 08:42:31 2013, Koji, Update, VAC, ETMX door open 
[Steve, Yuta, Koji]
The ETMX heavy door was removed.
Entry  Thu Feb 21 15:21:07 2013, yuta, Update, VAC, all heavy doors on, started pumping down annulus 
[Steve, Manasa, Jenne, Sendhil, Evan, Yuta]

We put heavy doors on ITMX/ITMY/BS chamber and started pumping down from annulus.
    Reply  Thu Feb 21 18:01:27 2013, Steve, Update, VAC, pumpdown at 230 Torr 
 
 We are pumping down with RP1 & RP3 oily roughing pumps at 3 Torr/min speed. The butterfly valve was just removed.
The PSL shutter is open to vacuum at ~100  mW 1064 nm. The inter lock should close it at ~5 mTorr.
    Reply  Thu Feb 21 21:12:42 2013, Koji, Update, VAC, pumpdown at 230 Torr 
[Rana, Yuta, Koji]
21:05 at the pressure of 10torr
V3 closed. RV1 manually closed. RPs were turned off. And the bellows between RV1 and the rughing pumps are disconnected.
    Reply  Fri Feb 22 08:01:25 2013, Steve, Update, VAC, pumpdown continuous 16hrs_pd75.png
 
 Pump down is restarted after 10.5 hrs stop overnight.
    Reply  Fri Feb 22 11:12:16 2013, Steve, Update, VAC, pumpdown completed mag60min.pngpd75at20h.png
 IFO   P1 pressure is 1 mTorr.  It is ready for high power light.
The Maglev took over the pumping at 500 mTorr
 
    Reply  Mon Feb 25 08:22:03 2013, Steve, Update, VAC, pumpdown at day 4 4d.png66d@atm.png
 All normal, IFO pressure 1.5e-5 Torr
RGA is pumped by TP-3 in back ground mode.
 
    Reply  Fri Mar 1 14:50:36 2013, Steve, Update, VAC, pumpdown day 8 bgTP3d7.pngRGAonIFO.png
 Atm1, RGA background scan with TP3 pumping at day 7
Atm2,  IFO  CC1 = 1.1e-5 Torr at day 8
 Vacuum valve VM3 closed and VM2 opened, it switched the RGA to IFO scanning mode. CC4 = 3.5e-6 Torr
Entry  Tue Mar 5 14:59:32 2013, Steve, HowTo, VAC, dry-forepump replaced changingforepump.pngTP3wFp600.jpg
TP3 turbo pump's dry-foreline pump was replaced.
How to do it:
The pump should be replaced when it's performance  <1.0 - 1.3 Torr
    Reply  Wed Mar 6 08:40:03 2013, Steve, Update, VAC, first scan of this pumpdown pd75m12d.pngpd75mRGA12d.png
 Pumpdown 75 - Maglev - day 12
Precondition: 66 days at atm, installed TIP-TILTs with coils that  replaced PZT-Jena input steering
 
Entry  Tue Mar 19 17:00:14 2013, Steve, Update, VAC, large window quote of Cascade  
Optical quality 6.5" OD window specs and quotes for vacuum view ports and optical table enclosure are on the 40m wiki_ Aux Optics page.
We have just received a very good quote #2  from Cascade  Optical.
    Reply  Mon Jun 3 09:46:40 2013, Steve, Update, VAC, RGA scan at day 100 d100Mpd75.pngd100Mpd75p.pngbadguys.png
 Vacuum normal condition at pumdown day 100
 
    Reply  Mon Jul 15 14:12:15 2013, Steve, Update, VAC, RGA scan at day 144 pd75mRGA144d.pngpd75m144d.png
 Pumpdown 75, vacuum normal condition at day 144
 
    Reply  Tue Jul 23 08:21:31 2013, Steve, Update, VAC, Vent has started beforVent.pngstartVent.png
 
Thanks for the good preparation.  IFO pressure P1=20 Torr 
    Reply  Tue Jul 23 14:00:03 2013, Steve, Update, VAC, the vent is completed Atm.png5cyl.pngventSum1d.png
 The 40m IFO has reached  atmospher in 5 hours. It is ready to open chamber condition. The RGA is pumped with the maglev.
P1 pirani gauge is contact dependent as you see it on the linear plot It will be replaced during this vent.
The venting speed was 2-4 Torr / min
Entry  Tue Jul 23 22:55:13 2013, Jenne, Update, VAC, BS, ITMY doors to be opened in the morning 
We will open the BS and ITMY doors first thing tomorrow morning. I plan to try to be in around 9 am.  The first order of business will be to flip the
folding mirrors that are not currently flipped (SR2, SR3, PR3).
    Reply  Wed Jul 24 10:35:41 2013, Steve, Update, VAC, BS, ITMY doors are removed beforeDoorsOff.pngparticlecount10d.png


    
        
            Quote:
        
        
            

           We will open the BS and ITMY doors first thing tomorrow morning. I plan to try to be in around 9 am.  The first order of business will be
    Reply  Mon Jul 29 16:04:40 2013, Steve, Update, VAC, AC removed acout.pngAlAcACa.jpgAlAcACb.jpg
 Manasa, Eric, Evan, Koji and Steve,
Access connector removed in order to complete alignment. Light aluminum with acetate windows AC installed.
 
    Reply  Mon Jul 29 16:15:13 2013, Koji, Update, VAC, AC removed 
Prior to the access connector removal, Manasa and I aligned the IFO mirrors. 
The arms were locked and aligned by ASS.
Entry  Wed Jul 31 10:27:00 2013, Steve, Update, VAC, instrument grade air is discontinoued 
We have been using Air Liquide Instrument Grade Air for venting the 40m vacuum envelope. It is no longer available.
The replacement is Alphagas 1, total hydrocarbon <0.1% ppm
    Reply  Mon Aug 5 10:50:48 2013, Steve, Update, VAC, RGA background v75bgMd12.png
 RGA background at day 12 of this vent . The maglev is pumping on the rga through VM2
 
    Reply  Tue Aug 6 10:06:29 2013, Steve, Update, VAC, Pumpdown is at 500Torr befPd.png
 The pumpdown has started at 8:38am
Manasa was here to confirm good alignment of the IFO
Inner jam nuts of AC bellow were torqued to 45 ft/lbs and   door nuts were check on opened chambers.
    Reply  Tue Aug 6 16:45:31 2013, Steve, Update, VAC, Pumpdown is completed 8hrPd76.png1mT.png
 IFO  P1=1mT PSL shutter is opened
 
    Reply  Wed Aug 7 10:51:49 2013, Steve, Update, VAC, Pumpdown at 26hrs 26hr.png14datm.png
 Cold cathode gauge CC1 -h (horizontal) just coming on 9.2e-5 Torr
P2 is the fore line pressure of the maglev. One can see the 4 Torr load during switching over to turbo pumping.
CC4  5e-9 Torr is the performance of the maglev pumping on the RGA only.
    Reply  Wed Aug 7 15:36:29 2013, Steve, Update, VAC, TP2 drypump replaced forelinesPs.jpg
 
 TP2's fore line - dry pump replaced at performance level 600 mTorr after 10,377 hrs of continuous operation.
Where are the foreline pressure gauges? These values are not on the vac.medm screen.
    Reply  Thu Aug 8 07:57:23 2013, Steve, Update, VAC, pumpdown at 48 hrs 48hrsPd76.png


    
        
            Quote:
        
        
            

            
    Reply  Thu Aug 8 10:31:28 2013, Steve, Update, VAC, few reminders of this vent GROUND!.jpgbad_Folding.jpgtoomuchred.jpgBETTERholder.jpg
 1, Vacuum envelope grounds must be connected all times!  After door removal reconnect both cables immediately.
 2, The crane folding had a new issue of getting cut as picture shows.
 3, Too much oplev light is scattered. This picture was taken just before we put on the heavy door.
    Reply  Wed Aug 14 08:24:20 2013, Steve, Update, VAC, pumpdown at day 8 pd76md8.png
 
 
    Reply  Fri Aug 16 09:35:18 2013, Steve, Update, VAC, Vacuum Normal state recognition is back VacuumNormal.pngvacValvesDisabled.jpg


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Aug 19 11:12:54 2013, Steve, Update, VAC, RGA scan at day 13 rgaScan13d.png
 
 
    Reply  Wed Aug 28 11:23:41 2013, Steve, Update, VAC, crane repair sheduled 


    
        
            Quote:
        
        
            

            1, Vacuum envelope grounds must be connected all times!  After door removal reconnect both cables immediately.
    Reply  Wed Aug 28 15:41:42 2013, Steve, Update, VAC, RGA scan at day 23 pd75md23.png
 Valve configuration: Vacuum Normal
pd76-m-d23
 
    Reply  Thu Sep 5 10:47:58 2013, Steve, Update, VAC, vertex crane folding issue 5mmLess.jpg
 
 [Fred Goldbar, Mike Gerfen, Dennis Coyne and Steve]
We inspected the hinge, 1.25" cross pin and I-beams. It is hard to explain what is  causing the folding I-beam corner to jam against
    Reply  Fri Sep 6 09:27:10 2013, Steve, Update, VAC, 31 days after pumpdown day31vac.png


    
        
            Quote:
        
        
            

            Valve configuration: Vacuum Normal
    Reply  Mon Sep 9 15:33:06 2013, Steve, Update, VAC, vertex crane repair is scheduled 


    
        
            Quote:
        
        
            

            
    Reply  Tue Sep 10 09:18:22 2013, Steve, Update, VAC, dry pump is getting loud 
 
 TP3 foreline's dry pump is getting noisier and noisier.  Turbo TP3 is pumping on the annulos. The foreline pressure is 7.2 mTorr and
it is not degrading. It was swapped in March 5, 2013
    Reply  Tue Sep 10 15:43:01 2013, Steve, Update, VAC, TP3' dry pump is replaced 


    
        
            Quote:
        
        
            

            
    Reply  Mon Sep 16 10:57:11 2013, Steve, Update, VAC, RGA scan at day 41 pd76m41dRGA.pngpd76m41d.png


    
        
            Quote:
        
        
            

            Valve configuration: Vacuum Normal
    Reply  Wed Sep 18 14:57:12 2013, Steve, Update, VAC, vertex crane folding arm removed manPower.jpgrotatingHinge.jpgsupportingHinge.jpggullingPin.jpg
 The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
The rotating hinge will be machined and bushing will be added with Zerk fitting or similar. This will allow lubrication in the future.
 see elog #9111
    Reply  Fri Sep 20 16:37:30 2013, Steve, Update, VAC, vertex crane folding arm is back on bushingBottom.jpgfoldingI.jpgnoLoadGap.jpgtrollyway.jpgtrollySee.jpg


    
        
            Quote:
        
        
            

            The folding beam removed as shown. Two man supporting it while I hammering it out. Pin was dry and it gulled into supporting hinges.
    Reply  Mon Sep 30 08:53:22 2013, Steve, Update, VAC, vertex crane repair schedule has changed 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Wed Oct 2 14:25:39 2013, Steve, Update, VAC, vertex crane is still out of order grindingIbeam.jpgcableMoved.jpg500lbs@end.jpg
 
The smoke alarms were turned off and surrounding areas were covered with plastic.
The folding I-beam was ground down to be in level with the main beam.
    Reply  Wed Oct 9 11:48:10 2013, Steve, Update, VAC, RGA scan at day 65 scanRGApd76m65d.pngpd76m65d.png
 
 Valve configuration: Vacuum Normal