ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
2582
|
Tue Feb 9 10:10:58 2010 |
Alberto | Update | ABSL | back to analog | I want to try to do the measurement with
the network analyzer used as local oscillator,
instead of the Marconis that I'm using now. |
|
2679
|
Thu Mar 18 10:46:51 2010 |
Koji | Update | ABSL | PLL reconstructed | Last night (Mar 17) I checked the PLL
setup as Mott have had some difficulty to
get a clean lock of the PLL setting. |
|
2680
|
Thu Mar 18 12:27:56 2010 |
Alberto | Update | ABSL | PLL reconstructed |
|
|
2681
|
Thu Mar 18 13:40:35 2010 |
Koji | Update | ABSL | PLL reconstructed | We use the current PLL just now, but the
renewal of the components are not immediate
as it will take some time. Even so we need |
|
2684
|
Thu Mar 18 21:42:26 2010 |
Koji | Update | ABSL | PLL reconstructed | I checked the setup further more.
I replaced the PD from
NewFocus 1GHz one to Thorlabs PDA255.
|
|
2696
|
Mon Mar 22 22:11:26 2010 |
Mott | Update | ABSL | PLL reconstructed |
It looks like the PLL drifted
alot over the weekend, and we couldn't get |
|
2697
|
Mon Mar 22 23:37:32 2010 |
Mott | Update | ABSL | PLL reconstructed |
We have managed to lock the PLL to
reasonable stability. The RF input is attenuated |
 |
2703
|
Tue Mar 23 18:44:46 2010 |
Mott | Update | ABSL | PLL reconstructed |
After realigning and getting
the lock today, I tried to add in the SR785 |
|
4832
|
Fri Jun 17 16:05:07 2011 |
kiwamu | Update | ABSL | LightWave out of MOPA box | [Suresh / Kiwamu]
We did the following things
: |
|
4840
|
Mon Jun 20 11:38:49 2011 |
kiwamu | Update | ABSL | I-P curve of LightWave M126-1064-700 | The
I-P curve of the LightWave NPRO (M126-1064-700),
which was taken out from the MOPA box, was |
|
4841
|
Mon Jun 20 13:48:25 2011 |
Koji | Update | ABSL | I-P curve of LightWave M126-1064-700 | Hmm. Was the current within the operating
range? (i.e. Is it a 700mW laser or a 1W
one?) |
|
4842
|
Mon Jun 20 16:44:02 2011 |
steve | Update | ABSL | I-P curve of LightWave M126-1064-700 |
Put the serial numbers into
the elog. So we can identify the laser and |
|
4855
|
Wed Jun 22 15:24:10 2011 |
kiwamu | Update | ABSL | got a laser controller for LightWave | Peter
King came over to the 40m with a laser controller
and gave it to us. |
 |
4872
|
Thu Jun 23 22:59:45 2011 |
kiwamu | Update | ABSL | I-P curve of LWE | The |
|
4874
|
Fri Jun 24 00:13:24 2011 |
kiwamu | Update | ABSL | beam profile measurement of LWE | The
beam profile of the LWE (LightWave Electronics)
NPRO was measured. |
|
4877
|
Fri Jun 24 07:49:23 2011 |
steve | Update | ABSL | I-P curve of LWE with serial numbers |
|
|
4917
|
Thu Jun 30 03:26:40 2011 |
kiwamu | Update | ABSL | status update | Status
update of the absolute length (ABSL) measurement: |
|
4923
|
Thu Jun 30 14:11:55 2011 |
kiwamu | Update | ABSL | a photo of ABSL setup on the AP table | Here
is a picture of the latest ABSL setup at
the east part of the AP table. |
|
4925
|
Thu Jun 30 21:00:20 2011 |
kiwamu | Update | ABSL | fine alignment done | (Just a quick report)
The
fine alignment of the ABSL laser injection |
|
4939
|
Tue Jul 5 16:09:54 2011 |
kiwamu | Update | ABSL | some photos for ABSL setup | Here
I show two photos of the latest ABSL (ABSolute
Length measurement) setup. |
 |
4940
|
Tue Jul 5 17:38:46 2011 |
kiwamu | Update | ABSL | ABSL laser frequency-locked | In this
past weekend the ABSL laser was successfully |
|
5079
|
Mon Aug 1 04:08:24 2011 |
kiwamu | Update | ABSL | Arm length measurement : cavity kick technique | I made some
attempts to measure the current length of |
|
5095
|
Tue Aug 2 16:55:21 2011 |
rana | Update | ABSL | Arm length measurement : cavity kick technique |
|
|
5117
|
Thu Aug 4 09:42:19 2011 |
Koji | Update | ABSL | ABSL Laser shutter closed | The shutter of the ABSL laser is closed
for the vent work. |
|
8257
|
Fri Mar 8 12:57:57 2013 |
Annalisa | Update | ABSL | BS installed on ITMY table | Sendhil and I installed the S polarized
BS on the ITMY table to steer the NPRO beam
through the AR wedge and align it to the |
|
8258
|
Fri Mar 8 13:42:35 2013 |
Jenne | Update | ABSL | BS installed on ITMY table | Re: POY beam reduction.
We are able to lock the Yarm with
the beam / gain as it is. I had thought |
|
8303
|
Mon Mar 18 12:02:12 2013 |
Annalisa | Configuration | ABSL | ABSL setup for g-factor measurement of PRC | Motivations
The ABSL
technique has been already used in the past
to measure the |
|
8361
|
Wed Mar 27 21:53:21 2013 |
Annalisa | Update | ABSL | Beat note of ATF auxiliary laser | After measuring the beat note, the "Alberto"
NPRO auxiliary laser has been moved from
the PSL table to the POY table. Its beam |
|
8369
|
Thu Mar 28 23:00:30 2013 |
Annalisa | Update | ABSL | Beat note of ATF auxiliary laser found |
The beat note for the ATF lab laser
has been found. |
|
8495
|
Fri Apr 26 10:50:07 2013 |
Annalisa | Update | ABSL | ATF laser on PSL | The ATF NPRO auxiliary laser has been moved
on the PSL table. All the optics for beat
note measurement are in place and alignment |
|
8590
|
Thu May 16 08:32:05 2013 |
Steve | Update | 40m upgrading | ETMY op table disabled |
All ETMY optical table electronics-
lasers-pds turned off, disconnected in order |
|
8594
|
Fri May 17 00:32:32 2013 |
Annalisa | Update | 40m upgrading | ETMY - progress | [Rana, Annalisa]
GREEN |
|
8595
|
Fri May 17 15:38:51 2013 |
Steve | Update | 40m upgrading | ETMY enclosure is on the way back |
It will arrive around 10 am Monday morning. |
|
8596
|
Fri May 17 16:06:14 2013 |
rana | Update | 40m upgrading | ETMY op table disabled |
TODO:
We need to replace all |
|
8597
|
Fri May 17 18:24:04 2013 |
Annalisa | Update | 40m upgrading | ETMY - progress | I aligned the green beam into the Faraday.
I needed an HWP to have the right polarization
for the light entering the Faraday itself. |
|
8622
|
Thu May 23 00:16:32 2013 |
Annalisa | Update | 40m upgrading | ETMY - progress | [Annalisa, Koji]
GREEN |
|
8637
|
Fri May 24 02:12:50 2013 |
Annalisa | Update | 40m upgrading | ETMY - Mode Matching for green |
Mode
Matching calculation for green beam - Yarm |
  |
8638
|
Fri May 24 11:38:00 2013 |
Koji | Update | 40m upgrading | ETMY - Mode Matching for green | I got confused. Is the mode calculation
in the cavity correct?
Are you sure the wavelength in the |
|
8639
|
Fri May 24 12:50:25 2013 |
Annalisa | Update | 40m upgrading | ETMY - Mode Matching for green |
|
|
8645
|
Sat May 25 02:03:48 2013 |
Annalisa | Update | 40m upgrading | ETMY - Mode Matching for green - new calculation | Mode
matching calculation for green - Yarm
I |
    |
8646
|
Mon May 27 21:38:53 2013 |
Annalisa | Update | 40m upgrading | ETMY - Beam Dumps |
I put many razor dumps along the
IR/green path. The rejected beam from the |
|
8652
|
Tue May 28 22:11:23 2013 |
Annalisa | Update | 40m upgrading | ETMY - Yarm shutter cable |
For some strange reason the
Yarm shutter cable runs up to the POY table, |
|
11521
|
Thu Aug 20 18:08:28 2015 |
Ignacio | Frogs | 40m upgrading | Fatality. Something broke. |
So |
|
12625
|
Fri Nov 18 00:25:08 2016 |
Johannes | Omnistructure | 40m upgrading | Acromag Chassis Development | I had Rich show me his approach to a chassis
for the Acromag modules. The document tree
for his design can be found on the DCC. |
 |
12634
|
Tue Nov 22 13:55:32 2016 |
Johannes | Omnistructure | 40m upgrading | Acromag Chassis | Current Acromag chassis status:
I found out that Acromag offers
DIN rail mounting kits for the open boards, |
|
10130
|
Sat Jul 5 04:18:45 2014 |
Andres | Update | 40m Xend Table upgrade | Adding Two Lenses After the Second Steering Mirror in Order Two Increase the Gouy Phase Difference Between the Sterring Mirrors | I had been working on the Xend table optical
layout update. Since the two steering mirrors
in the Xend green are too close to each, |
7x |
10191
|
Sun Jul 13 17:06:35 2014 |
Andres | Update | 40m Xend Table upgrade | Xarm Table Upgrade Calculation and Diagrams of possible new table layout | Current Mode Matching
and Gouy Phase Between Steering Mirrors |
    |
10195
|
Mon Jul 14 16:19:41 2014 |
Andres | Update | 40m Xend Table upgrade | Took the measurement for the Mode Matching | Nick
and I measured the reflected power of the
green light in locked and unlocked. I'm working |
|
10207
|
Tue Jul 15 22:23:51 2014 |
Andres | Update | 40m Xend Table upgrade | Scan the Xarm for the mode matching | Nick and I with the help of Jenne
scan the green light when the cavity is unlocked.
Nick placed a Beam dump on the IR so that |
|
10226
|
Thu Jul 17 02:57:32 2014 |
Andres | Update | 40m Xend Table upgrade | FInish Calculation on Current X-arm mode Matching | Data and Calculation for the
Xarm Current Mode Matching |
  |