    Reply  Wed Apr 21 11:09:57 2021, yehonathan, Update, PSL, Laser amplifier 20210420_171606.jpg20210420_171621.jpg20210420_171611.jpg20210420_171629.jpg20210420_171702.jpg
Entry  Wed Jul 21 18:08:35 2021, yehonathan, Update, Loss Measurement, Loss measurement 
    Reply  Fri Oct 1 14:25:27 2021, yehonathan, Summary, SUS, PRM and BS Angular Actuation transfer function magnitude measurements MICH_PRM_-0.34.pngMICH_PRM_-0.1.png
    Reply  Thu Apr 14 11:52:57 2022, yehonathan, Summary, BHD, Part IIa of BHR upgrade - POY11 debugging Screenshot_2022-04-14_15-53-39.pngPXL_20220414_220616875.jpg
Entry  Thu Apr 21 18:18:42 2022, yehonathan, Update, BHD, POX Alignment POX11_alignment.png
Entry  Fri Aug 2 17:07:33 2019, yehonathan, gautam, Update, Loss Measurement,  
Entry  Mon Feb 13 17:19:41 2017, yinzi, Configuration, , configuring ethernet for raspberry pi Screen_Shot_2017-02-13_at_5.11.52_PM.png
Entry  Fri Sep 21 09:59:09 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_CurrentSetup_AUXYgreen.jpegModeMatchingSolution_Current.pdfModeMatchingSolution_Current_Magnified.pdfModeMatchingSolution_Optimized.pdfModeMatchingSolution_Optimized_Magnified.pdf
Entry  Sun Sep 23 17:38:48 2018, yuki, Update, ASC, Alignment of AUX Y end green beam was recovered 
    Reply  Sun Sep 23 19:32:23 2018, yuki, Configuration, ASC, Y end table upgrade plan Pic_NewSetup0923_AUXYgreen.jpegModeMatchingSolution_Result.pdfModeMatchingSolution_Magnified_0923.jpgpic0923_1.jpgpic0923_2.jpg
    Reply  Mon Sep 24 11:09:05 2018, yuki, Configuration, ASC, Y end table upgrade plan pic0924_1.jpg
    Reply  Tue Sep 25 18:08:50 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Thu Sep 27 14:02:55 2018, yuki, Configuration, ASC, PZT driver board verification PZTdriverSimulationDiagram.pdfPZTdriverSimulationResult.pdfPZTdriverPerformanceCheck_ResultOUT.pdfPZTdriverPerformanceCheck_ResultMON.pdfPZTdriver.asc
    Reply  Sun Sep 30 20:14:51 2018, yuki, Configuration, ASC, QPD calibration QPDcalibrationXaxis.pdfQPDcalibrationYaxis.pdf
    Reply  Mon Oct 1 13:33:55 2018, yuki, Configuration, ASC, QPD calibration Pic_QPDcalibration.jpg
    Reply  Tue Oct 2 18:50:53 2018, yuki, Configuration, ASC, PZT mirror calibration PZTM1calibrationCH2.pdfPZTM1calibrationCH1.pdfPZTM2calibrationCH2.pdfPZTM2calibrationCH1.pdf
    Reply  Wed Oct 3 14:24:40 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Wed Oct 3 18:15:34 2018, yuki, Configuration, ASC, AI board improvement TF_AIboard.pdf
    Reply  Thu Oct 4 00:44:50 2018, yuki, Configuration, ASC, AI board improvement 
    Reply  Thu Oct 4 22:15:30 2018, yuki, Configuration, ASC, Y-end table upgrade AUXYGreenLock20180921.jpgPic_FormerSetup.jpegPic_CurrentSetup1004.jpg
    Reply  Fri Oct 5 17:32:38 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Fri Oct 5 22:49:22 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Sun Oct 7 22:30:42 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_NewLayout1007.jpgYendGreenModeMatching.zip
    Reply  Mon Oct 8 00:46:35 2018, yuki, Configuration, ASC, Y-end table upgrade 
    Reply  Tue Oct 9 23:03:43 2018, yuki, Configuration, LSC, Yarm Green locking was recovered Pic_1Y4.jpgPic_PZTcable.jpg
    Reply  Wed Oct 10 12:38:27 2018, yuki, Configuration, LSC, All hardware was installed 
    Reply  Thu Oct 11 13:40:51 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 12:29:34 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Fri Oct 12 20:20:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Sat Oct 13 20:11:10 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Mon Oct 15 10:32:13 2018, yuki, Update, Computer Scripts / Programs, loss measurements XARM_20181015_1500.pdfYARM_20181015_1500.pdf
    Reply  Mon Oct 15 12:52:54 2018, yuki, Update, Computer Scripts / Programs, additional comments 
    Reply  Mon Oct 15 20:11:56 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Tue Oct 16 00:44:29 2018, yuki, Update, Computer Scripts / Programs, loss measurements 
    Reply  Wed Oct 17 20:46:24 2018, yuki, Configuration, ASC, Y end table upgrade plan 
    Reply  Wed Nov 7 05:16:16 2018, yuki, Update, Computer Scripts / Programs, arm loss measuremenents 
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
Entry  Wed Sep 29 18:28:32 2010, yuta, Update, Computers, aldabella connects to the wireless network 
Entry  Thu Sep 30 14:09:33 2010, yuta, Update, Computers, mariabella connects to the wireless network 
Entry  Thu Sep 30 18:51:50 2010, yuta, Update, Computers, setting up aldabella and mariabella 
Entry  Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber P1060901.JPGP1060904.JPG
Entry  Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table IMG_3627.jpg
Entry  Thu Oct 7 14:39:50 2010, yuta, Update, PSL, measured PMC's laser power-output relation PMCreflect.png
    Reply  Thu Oct 7 16:34:06 2010, yuta, Update, PSL, measured PMC's laser power-output relation PMCvis.png
Entry  Thu Oct 7 17:53:07 2010, yuta, Update, Computers, Farfalla with Firefox, fixed 
Entry  Thu Oct 7 23:24:44 2010, yuta, Update, CDS, checking MC1 suspension damping 
Entry  Mon Oct 11 16:09:10 2010, yuta, Summary, SUS, current OSEM outputs 
Entry  Mon Oct 11 17:31:44 2010, yuta, Update, CDS, Activation of DAQ channels for 8 optics 
Entry  Mon Oct 11 22:04:28 2010, yuta, Update, CDS, damping for MCs are basically working SUS-MC1.pngSUS-MC2.pngSUS-MC3.png
Entry  Tue Oct 12 15:51:18 2010, yuta, Bureaucracy, SAFETY, the 40m squad received safety training from Peter 