Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed
|
Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work
|
Tue Aug 10 17:21:48 2010, steve, Update, General, PSL optical table is at 30" height    
|
Thu Aug 12 10:56:31 2010, steve, Update, Environment, dusty floor work in progres
|
Thu Aug 12 16:18:46 2010, steve, Update, Environment, tiles and adhesive removed    
|
Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table   
|
Tue Aug 17 14:09:15 2010, steve, Update, PEM, PSL optical table schedule
|
Wed Aug 18 16:42:14 2010, steve, Update, PEM, PSL optical table legs load balanced   
|
Thu Aug 19 16:03:59 2010, steve, Update, PEM, grouting of PSL tripod legs   
|
Fri Aug 20 15:49:14 2010, steve, Update, PEM, grouting is done  
|
Fri Aug 20 16:17:35 2010, steve, Update, PEM, PEM-count channels are not working
|
Mon Aug 23 08:28:27 2010, steve, Update, SUS, ETMY sus damping restored
|
Tue Aug 24 11:23:32 2010, steve, Update, PEM, tripod leg installation completed 7x
|
Wed Aug 25 16:13:32 2010, steve, Summary, PEM, PSL optical table is back into operation at 32.75" level    
|
Fri Aug 27 11:27:33 2010, steve, Update, PEM, crane safety document
|
Tue Aug 31 10:44:17 2010, steve, Update, PEM, concrete sealed
|
Tue Aug 31 13:31:00 2010, steve, Update, PEM, room temp lowered
|
Tue Aug 31 14:47:53 2010, steve, Configuration, PEM, toilet upgrade
|
Wed Sep 1 10:54:15 2010, steve, Update, PEM, more crane balancing
|
Thu Sep 2 14:11:17 2010, steve, Summary, PEM, south end crane balancing is completed  
|
Thu Sep 2 16:41:32 2010, steve, Configuration, SAFETY, laser is ON: safety glasses required!
|
Wed Sep 8 16:17:58 2010, steve, Update, PEM, particle counter problem
|
Thu Sep 9 08:23:45 2010, steve, Update, SAFETY, main laser turned off
|
Thu Sep 9 11:17:15 2010, steve, Update, SAFETY, main laser is back ON  
|
Thu Sep 9 11:31:54 2010, steve, Update, PEM, accelerometer cable connection
|
Fri Sep 17 17:35:35 2010, steve, Update, PEM, cleaned up at 1Y1 PSL rack
|
Mon Sep 20 17:10:10 2010, steve, Configuration, PSL, enclosure beam guides to IFO are installed
|
Tue Sep 21 15:33:02 2010, steve, Metaphysics, Treasure, Wagonga alart 
|
Fri Sep 24 16:31:35 2010, steve, Configuration, General, open frame- rack is moved
|
Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started
|
Tue Sep 28 14:12:14 2010, steve, Update, General, vertex crane drive is out of order
|
Thu Sep 30 09:34:58 2010, steve, Update, General, vertex crane trolly drive fixed   
|
Thu Sep 30 13:43:29 2010, steve, Update, SAFETY, propane gas smell in control room
|
Fri Oct 1 16:46:20 2010, steve, Bureaucracy, SAFETY, Yuta received 40m-101-safety training
|
Tue Oct 5 09:26:04 2010, steve, Configuration, PEM, moved accelerometers
|
Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed
|
Thu Oct 7 08:39:39 2010, steve, Bureaucracy, SAFETY, Joonho receives safety training
|
Thu Oct 7 15:21:51 2010, steve, Update, PSL, RF filter for PMC
|
Fri Oct 8 07:41:42 2010, steve, Configuration, SAFETY, 2W laser shutter is closed
|
Fri Oct 8 10:38:03 2010, steve, Configuration, SAFETY, 2W laser shutter is closed 
|
Fri Oct 8 17:36:16 2010, steve, Frogs, Photos, visiting undergrads   
|
Mon Oct 11 10:51:36 2010, steve, Update, SUS, OSEMs, OSEMs, OSEMs...those lovely little OSEMs
|
Tue Oct 12 16:35:17 2010, steve, Configuration, PSL, PSL output monitor in place
|
Mon Oct 18 09:01:48 2010, steve, HowTo, General, How not to
|
Wed Oct 20 16:41:41 2010, steve, Omnistructure, General, laser chiller leaving for MIT
|
Thu Oct 21 10:44:56 2010, steve, Metaphysics, Treasure, 1987 supernova tapes plus....?
|
Wed Oct 27 09:02:29 2010, steve, Update, Electronics, HP4195A is NOT fixed
|
Thu Oct 28 09:16:17 2010, steve, Update, PEM, welding in the vertex area
|
Thu Oct 28 13:01:34 2010, steve, Update, PEM, crane repair guys left for the day
|
Mon Nov 1 10:17:55 2010, steve, Update, General, breakers relabelled  
|
|