40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 329 of 341  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Wed Dec 19 11:53:23 2012, Steve, Update, VAC, AC removed workingatatm.png
    Reply  Mon Jul 29 16:04:40 2013, Steve, Update, VAC, AC removed acout.pngAlAcACa.jpgAlAcACb.jpg
    Reply  Mon Jul 29 16:15:13 2013, Koji, Update, VAC, AC removed 
Entry  Wed Mar 21 10:31:28 2012, steve, Update, SAFETY, AC power to ETMY turned off 
    Reply  Wed Mar 21 11:32:47 2012, steve, Update, SAFETY, AC power to ETMX turned off 
    Reply  Mon Jun 25 08:21:40 2012, steve, Update, General, AC power disturbance on Sat powerdisturbed.png
    Reply  Wed Mar 21 19:12:27 2012, steve, Update, Computers, AC power back on both ends 
    Reply  Mon Apr 26 11:13:28 2010, steve, Omnistructure, PEM, AC on/off is working 
Entry  Fri Nov 7 10:52:57 2008, steve, Update, PEM, AC is back on acf.jpgacc_mc1.jpgtest.jpg
    Reply  Fri Nov 7 15:58:10 2008, rana, Update, PEM, AC is back on mc-acc.pdfmc-acc-quad.pdf
Entry  Wed Nov 23 14:47:14 2011, Jenne, Configuration, Environment, AC in the IFO room was off 
    Reply  Tue Apr 20 10:52:49 2021, Anchal, Paco, Update, SUS, AC gain coil output balancing for IMC POS2PYuncoupled.pdfPIT2PYuncoupled.pdfMC1YAWexc.pdfMC1PITexc.pdf
Entry  Wed Sep 17 19:13:47 2008, Alberto, Update, General, ABSL: status 
Entry  Mon Sep 22 20:00:35 2008, Alberto, Update, General, ABSL: running measurement 
Entry  Wed Sep 17 13:58:36 2008, Alberto, Update, General, ABSL: results from the X arm Sept17_XarmFSRmeasurement_report.ps
Entry  Sun Sep 14 18:30:32 2008, Alberto, Update, General, ABSL: measured X arm 
    Reply  Sun Sep 14 19:29:07 2008, Alberto, Update, General, ABSL: measured X arm 
Entry  Wed Sep 24 17:57:04 2008, Alberto, Update, General, ABSL: FSS Slow Actuator Control 
Entry  Mon Mar 18 12:02:12 2013, Annalisa, Configuration, ABSL, ABSL setup for g-factor measurement of PRC 
Entry  Tue Jul 5 17:38:46 2011, kiwamu, Update, ABSL, ABSL laser frequency-locked RFsetup.png
Entry  Thu Aug 4 09:42:19 2011, Koji, Update, ABSL, ABSL Laser shutter closed 
Entry  Sat Jul 30 00:33:33 2011, Koji, Update, PSL, ABSL Laser crystal temp left largely excited & left unattended for more than 3hours 
    Reply  Sat Jul 30 02:47:43 2011, rana, Update, PSL, ABSL Laser crystal temp left largely excited & left unattended for more than 3hours 
Entry  Wed Jul 20 06:52:01 2011, Suresh, Update, LSC, ABSL - PSL beat lock 
    Reply  Wed May 15 17:38:49 2013, Jamie, Summary, CDS, AA/AI requirements 
Entry  Fri Dec 4 19:23:40 2020, Koji, Update, Electronics, AA/AI board testing ongoing 
Entry  Wed Apr 16 21:11:12 2008, rana, Summary, DAQ, AA/AI Filters for the DAQ & FE systems DAQ_filters_080416.pdf
Entry  Fri Nov 12 20:40:51 2010, josephb, yuta, valera, Configuration, Electronics, AA voltage range 
Entry  Sun Jul 24 20:36:03 2011, haixing, Summary, Electronics, AA filter tolerance analysis 6x
    Reply  Sun Jul 24 20:47:21 2011, rana, Summary, Electronics, AA filter tolerance analysis 
    Reply  Sun Jul 24 22:19:19 2011, haixing, Summary, Electronics, AA filter tolerance analysis low_pass_new.png
    Reply  Tue Jul 26 21:11:40 2011, haixing, Summary, Electronics, AA filter tolerance analysis 
Entry  Thu May 19 12:09:41 2011, josephb, Update, CDS, AA filter box pulled from 1X5, optic suspensions currently off 
    Reply  Thu May 19 17:53:03 2011, steve, Update, CDS, AA filter box modified at 1X5 P1070727.JPG
    Reply  Tue Dec 22 22:11:37 2020, gautam, Update, CDS, AA filt repaired and reinstalled 
Entry  Wed Aug 10 12:28:22 2011, Ishwita , Manuel, Update, PEM, AA board gain pw_gur1_sts1_aug10.png
Entry  Mon Jul 11 10:10:31 2011, Ishwita, Configuration, , AA board  P7080305.JPGseismometers.png
Entry  Sat Jul 16 18:54:05 2011, Ishwita, Manuel, Configuration, Electronics, AA board DSC_3236.JPGpic1.pngDSC_3237.JPG
    Reply  Sun Oct 14 20:51:20 2012, Den, Update, PEM, AA board acc.pngDSC_4747.JPG
    Reply  Mon Oct 15 10:14:22 2012, Den, Update, PEM, AA board 
Entry  Thu May 9 00:05:12 2013, rana, Koji, Jenne, Summary, LSC, AA and AI change AAAI.pdf
    Reply  Thu Oct 28 04:23:38 2010, rana, Update, IOO, A2L prep 
Entry  Thu Jun 21 14:23:22 2018, Udit Khandelwal, Summary, General, A summary of the Tip-TIlt Mirror Holder design changes 1.png2.png3-1.png3-2.png3-3.png
    Reply  Thu Jun 21 14:57:59 2018, Koji, Summary, General, A summary of the Tip-TIlt Mirror Holder design changes 
Entry  Thu Mar 19 02:45:36 2009, Yoichi, Configuration, IOO, A loose wire found for MC1  
    Reply  Thu Mar 19 10:45:43 2009, Yoichi, Configuration, IOO, A loose wire found for MC1  AfterWireFix-1.pdf
    Reply  Wed Dec 4 19:54:27 2019, gautam, Update, LSC, A look to the past DRFPMI_2016March.pdf
Entry  Sat Nov 3 16:20:43 2007, waldman, Summary, OMC, A good day's work 6x
Entry  Fri Mar 4 03:31:35 2011, kiwamu, Update, Green Locking, A first noise budget noise_budget.png
Entry  Mon Sep 7 23:49:14 2020, gautam, Update, BHD, A first look at RF44 scheme 
ELOG V3.1.3-