  12808   Tue Feb 7 16:23:49 2017 SteveUpdateGeneralpower interruption tomorrow                                                                                                                                  
received this note: at 4:11pm Tuesday, Feb
7, 2017
  
  3924   Mon Nov 15 15:02:00 2010 KojiSummaryPSLpower measurements around the PMC[Valera Yuta Kiwamu Koji]
Kiwamu burtrestored c1psl.  We measured
the power levels around the PMC.
  
  6156   Fri Dec 30 22:05:16 2011 kiwamuUpdateLSCpower normalization in LSCNow a power
normalization is doable for the LSC error
 POW_NORM_MTRX.png 
  6158   Tue Jan 3 15:48:39 2012 kiwamuUpdateLSCpower normalization in LSCIt
turned out that the power normalization need
a modification.
  
  6170   Wed Jan 4 16:22:30 2012 kiwamuUpdateLSCpower normalization in LSC : modification doneThe
dynamic power normalization system has been
modified such that the normalization happen
 pow_norm.png 
  4011   Sun Dec 5 22:28:39 2010 ranaSummaryall down cond.power outageLooks like there was a power outage.
The control room workstations
were all off (except for op440m). Rosalba
  
  4012   Mon Dec 6 11:53:20 2010 josephb, kiwamuSummaryall down cond.power outageThe monitors for allegra and rossa's seemed
to be in a weird state after the power outage. 
I turned allegra and rossa on, but didn't
  
  4013   Mon Dec 6 11:57:21 2010 KojiSummaryall down cond.power outageI checked the vacuum system and judged
there is no apparent issue.
The chambers and annulus had been
  
  7476   Thu Oct 4 08:39:58 2012 SteveUpdateGeneralpower outage There had to be a power outage. Laser
and air condition turned back on. The vacuum
 Oct4R2012.png 
  13492   Tue Dec 26 17:24:24 2017 SteveUpdateGeneralpower outageThere was a power outage.

The IFO pressure is 12.8 mTorr-it
and it is not pumped. V1 is still closed.
 powerOutage.png 
  13755   Mon Apr 16 22:09:53 2018 KevinUpdateGeneralpower outage - BLRM recoveryI've been looking into recovering the
seismic BLRMs for the BS Trillium seismometer.
It looks like the problem is probably
 AA.jpgADC.jpg 
  13493   Thu Dec 28 17:22:02 2017 gautamUpdateGeneralpower outage - CDS recovery
I had to manually reboot c1lsc,
c1sus and c1ioo.
I edited the
line in /etc/rt.sh (specifically, on FB /diskless/root.jessie/etc/rt.sh)
 28.png 
  13510   Sat Jan 6 18:27:37 2018 gautamUpdateGeneralpower outage - IFO recoveryMostly back to nominal operating conditions
now.


EX TransMon QPD is not
 EX_QPD_Quad1_Faulty.pdfTrillium_faulty.pdf 
  13503   Thu Jan 4 14:39:50 2018 gautamUpdateGeneralpower outage - timing errorAs mentioned in my previous elog, the CDS
overview screen "DC" indicators
are all RED (everything else is green). Opening
  
  13506   Fri Jan 5 21:54:28 2018 ranaUpdateGeneralpower outage - timing errorRolf came here in the morning, but not
sure what he did or if Jamie remotely did
something. But the screen is green.
 huh.png 
  13507   Fri Jan 5 22:19:53 2018 gautamUpdateGeneralpower outage - timing errorJust putting the relevant line from email
from Rolf which at least identifies the problem
here:
  
  3163   Wed Jul 7 00:15:29 2010 tara,RanaSummaryPSLpower spectral density from RefCav transmitted beam I measured
the RC transmitted light signals here at
the 40m. I made all connections through
 RIN_rftrans.pngtara.png 
  3164   Wed Jul 7 10:42:29 2010 KojiSummaryPSLpower spectral density from RefCav transmitted beam How do you calibrate this to Hz/rtHz?

  
  9506   Fri Dec 20 20:04:01 2013 SteveUpdateVACpower supply replaced with a short vent

    

       
            
 4hrPumpdown.pngpumpdownAfterHickup.pngPSpumpdown.png 
  9508   Fri Dec 20 23:00:41 2013 KojiUpdateVACpower supply replaced with a short ventI'm leaving the 40m now. IFO is aligned. Everything
look good.
  
  9516   Fri Jan 3 11:18:41 2014 SteveSummaryVACpower supply replaced with a short vent

    

       
            
 rebootVENT.png 
  9510   Sat Dec 21 10:53:35 2013 SteveUpdateVACpower supply replaced with a short vent-pumpdown completedThe recovery- pumpdown reached valve configuration 
vacuum normal at 20 hours, cc1 7.7e-6 Torr
 20hrsVacNormal.png 
  6860   Sat Jun 23 18:44:15 2012 steveUpdateGeneralpower surge has no effect on the labI was notified by CIT Utilities that there
was a power surge or short power outage this
after noon.
  
  7088   Mon Aug 6 09:46:31 2012 steveUpdateIOOpoweroutage turns laser off
. Power
  
  7800   Sat Dec 8 04:12:38 2012 DenUpdateLSCprcl Today I wanted to check that AS and
REFL beams are real and contain proper information
about interferometer. For this I locked YARM
 IMG_0118.JPG 
  8446   Fri Apr 12 02:56:34 2013 DenUpdateLockingprcl angular motionI compared PCRL and XARM angular motions
by misaligning the cavities and measuring
power RIN. Divergence angles for both cavities
 pointing.pngoplev_exc.pdf 
  8447   Fri Apr 12 09:20:32 2013 ranaUpdateLockingprcl angular motion How
is the cavity g-factor accounted for in this
  
  8449   Fri Apr 12 13:21:34 2013 DenUpdateLockingprcl angular motion

    

       
            
  
  8450   Sat Apr 13 03:45:51 2013 ranaUpdateLockingprcl angular motion 
 Maybe its equivalent, but I
would have assumed that the input beam is
  
  8451   Sat Apr 13 23:11:04 2013 DenUpdateLockingprcl angular motion

    

       
            
 pointing.pdf 
  8454   Sun Apr 14 17:56:03 2013 ranaUpdateLockingprcl angular motion

    

       
            
  
  8564   Mon May 13 18:44:04 2013 JenneUpdateLockingprcl angular motionI want to redo this estimate of where RIN
comes from, since Den did this measurement
before I put the lens in front of the POP
 TT_Q_measurements.pdf 
  14437   Wed Feb 6 10:07:23 2019 ChubUpdate pre-construction inspectionThe Central Plant building will be undergoing
seismic upgrades in the near future. 
The adjoining north wall along the Y arm
  
  5591   Fri Sep 30 19:12:56 2011 KojiUpdateGeneralprep for poweroutage 
 [Koji Jenne]
The lasers were shutdown
  
  13383   Tue Oct 17 17:53:25 2017 jamieSummaryLSCprep for tests of Gabriele's neural network cavity length reconstructionI've been preparing for testing Gabriele's
deep
neural network MICH/PRCL reconstruction.
 c1dnn.png 
  13390   Wed Oct 18 12:14:08 2017 jamieSummaryLSCprep for tests of Gabriele's neural network cavity length reconstruction


  
  6892   Fri Jun 29 02:17:40 2012 yutaUpdateIOOprep for the vent - beam attenuating[Koji, Jamie, Yuta]

We attenuated the incident beam (1.2
  
  6893   Fri Jun 29 03:21:32 2012 yutaUpdateGeneralprep for the vent - others1. Turned off high voltage power supplies
for PZT1/2 (input PZTs) and OMC stage 1/2.
They live in 1Y3 rack and AUX_OMC_NORTH rack.
 MEDMscreenshotswithCOW_20120629.png 
  14022   Tue Jun 26 20:59:36 2018 aaronUpdateOMCprep for vent in a couple weeksI checked out the elog from the vent in
October 2016 when the OMC was removed from
the path. In the vent in a couple weeks,
  
  4574   Wed Apr 27 18:14:48 2011 kiwamuUpdateLSCpreparation for DRMI locking : RF status   RF_Work_Status.png 
  2644   Fri Feb 26 15:32:13 2010 steveConfigurationVACpreparation for power outage: vacuum all offThere is a planned power outage tomorrow,
Saturday from 7am till midnight.
I vented all annulies and switched
 ventd3.jpg 
  13806   Wed May 2 10:03:58 2018 SteveHowToSEIpreparation of load cell measurement at ETMXGautam and Steve,

We have calibrated the load 
cells. The support beams height monitoring
 6x 
  13809   Thu May 3 09:56:42 2018 SteveHowToSEIpreparation of load cell measurement at ETMX[ Dennis Coyne'  precision answer
]

  
  13840   Mon May 14 08:55:40 2018 Dennis CoyneHowToSEIpreparation of load cell measurement at ETMXfollow
up email from Dennis 5-13-2018.
  
  5089   Tue Aug 2 02:35:23 2011 kiwamuUpdateGeneralpreparation of the vent : status and planThe vent
will take place on Wednesday.
  
  5078   Sun Jul 31 22:48:35 2011 kiwamuSummaryGeneralpreparation of the vent : status updateStatus
update for the vent preparation:
  
  5080   Mon Aug 1 08:52:37 2011 steveUpdateVACpreparation to ventBoth arms locked easely around 1V transmited. 
We should recenter oplevs.
 pztsteering.pngvac1Aug2011.pngPEM200d.jpg 
  2778   Wed Apr 7 09:00:01 2010 steveHowToPEMprepare to open chamberIn order to minimize the diffusion of more
dust particles into the vented IFO vacuum
envelope
 0.5micron.jpg 
  5950   Fri Nov 18 16:37:14 2011 steveUpdateVACpreparing for ac power interruptionThe vacuum is ready for no AC power for
1 hr on Sunday morning at 10am
 
 planednopower.png 
  10467   Mon Sep 8 08:24:49 2014 SteveUpdateComputer Scripts / Programspreparing vac system to rebootQ and Steve will follow elog 10028
entry to prepare the vacuum system for safe
reboot
  