    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg


    
        
            Quote:
        
        
            
            Kiwamu and Steve have started venting the 40m vacuum envelope.
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
There is a planned power outage tomorrow, Saturday from 7am till midnight.
I vented all annulies and switched to ALL OFF configuration. The small region of the RGA is still under vacuum.
The vac-rack: gauges, c1vac1 and UPS turned off.
    Reply  Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal 


    
        
            Quote:
        
        
            
            There is a planned power outage tomorrow, Saturday from 7am till midnight.
Entry  Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18 bg-d18_20100312scan.png
RGA scan of rga-region only at day 18   This is the back ground of the rga with some calibration gas.
Entry  Fri Apr 16 17:46:54 2010, Koji, Update, VAC, Peeting mirrors aligned 
Steve and Koji
We aligned the peeping mirrors to look at the surface of the ITMs. 
They had been misligned as we move the positions of the ITMs, but now they are fine.
Entry  Fri May 21 00:30:44 2010, Jenne, Update, VAC, TP3 fore pump is very loud 
[Jenne, Kiwamu, and Steve via phone]
Around 9:30pm, Kiwamu and I came back from dinner, and were getting ready to begin the beam scan measurements.  I noticed that one of the
vacuum pumps was being very loud.  Kiwamu noted that it is the fore pump for TP3's turbo, which he and Steve replaced in January (elog
    Reply  Fri May 21 08:28:29 2010, steve, Configuration, VAC, TP3 turned off 


    
        
            Quote:
        
        
            
            [Jenne, Kiwamu, and Steve via phone]
Entry  Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced 
Bob replaced the tipseal in an other drypump and I swapped it in. TP3 turbo is running again, it's foreline pressure is 40 mTorr. The RGA is still off
Entry  Fri May 28 13:32:01 2010, alberto, kiwamu, Update, VAC, vacuum work 
We started a vacuum work in this morning. And still it's going on.
 
Although the last night the green team replaced a steering mirror by an 80% reflector on the PLS table, the beam axis to the MC looks fine.
    Reply  Fri May 28 13:51:51 2010, Jenne, Update, VAC, vacuum work 


    
        
            Quote:
        
        
            
            We started a vacuum work in this morning.
    Reply  Fri May 28 14:24:30 2010, Jenne, Update, VAC, vacuum work 
I just got off the phone with Alberto and Kiwamu, and I'm going to try to recalculate things based on their measurements of the distances between MC3
and SM1.  It sounds like the CAD drawings we have aren't totally correct.    I know that when we opened doors just before Christmas we measured the distances between the BS table and the ITM tables, but I don't think
Entry  Wed Jun 23 23:55:03 2010, Katharine, Sharmila, Rana, Steve and Kiwamu, Update, VAC, wiped the BS 
Some unused optics in the BS chamber were removed. 
After that the beam splitter has been drag wiped. 
    Reply  Thu Jun 24 11:16:32 2010, Sharmila, Rana and Kiwamu, HowTo, VAC, Inspection of the BS (sorry, no sounds) 
 
Entry  Thu Jun 24 16:59:24 2010, josephb, Update, VAC, Finished restoring the access connector and door 
[Jenne,  Kiwamu, Steve, Sharmila, Katherine, Joe]
We finished bolting the door on the new ITMX (old ITMY) and putting the access connector section back into place.  We finished with torquing
all the bolts to 40 foot-pounds.
Entry  Tue Jun 29 17:10:49 2010, steve, rana, Update, VAC, slow pumpdown started 
The folding crane was fixed and tested this morning by the NNN rigging company. Pictures will be posted by Steve in the morning.
Afterwards, the ITM-east door was installed, jam-nuts checked. No high voltage was on for the in-vac PZTs.
The annulus spaces were roughed down to 350mTorr by Roughing Pump RP1. For this operation, we removed the low flow valve from the RP1 line.
    Reply  Tue Jun 29 23:49:18 2010, steve, rana, Update, VAC, slow pumpdown started Untitled.png

The pumpdown started at 4 PM (2300 UTC). At 10 PM, we (Jenne, Jan, and I) opened up the RV1 valve to full open. That's the second inflection point
    Reply  Wed Jun 30 00:45:26 2010, rana, Update, VAC, slow pumpdown stopped for the night 
As per Steve's instructions, at 12:43 AM, I used the following steps to stop the pumpdown until the morning:

    Close RV1 using the 'steering-wheel' wrench.
    Close V3.
    Turn OFF RP1.
    Disconnect RP1 hose at
the plastic disconnect attached to the slow-start throttle valve.
    Reply  Wed Jun 30 15:24:04 2010, steve,kiwamu, Update, VAC, slow pumpdown copmlete slowpd.jpgbutterfly.JPG


    
        
            Quote:
        
        
            
            
Entry  Thu Jul 1 10:26:34 2010, steve, Configuration, VAC, pd68 at vacuum normal state pd68slow2d.jpgpem134d.jpg
Slow pump down _pd68 has reached the vacuum normal state.  CC4_Rga region is pumped now. The RGA is still off.
Precondition to this pump down:                                                                                                                                                                                                                               &nb
Entry  Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started 
The PSL shutter was closed. The beam path  blocked two places. High voltage power supplies to IOO and OMC PZT were checked to be off. Oplevs are
off. 
The south arm green cavity was misaligned yesterday
    Reply  Tue Jul 20 23:52:36 2010, kiwamu, Update, VAC, update: slow vent has started untitled.png
The vent is still going on. At this moment the pressure inside of the chambers is about 630 Torr.
Koji and I have replaced the 2nd instrument grade compressed air cylinder by the 3rd cylinder around 9 pm.
So far the vent speed has been nicely kept at about 1 Torr / min.
    Reply  Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished 
The vent has been finished successfully in this morning.
The vent was finished successfully this morning.
    Reply  Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished 30hvent.jpg


    
        
            Quote:
        
        
            
            The vent has been finished successfully in
Entry  Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started slowpd5hr.jpg
Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed
in the beam path. High voltage power supplies were checked to be off.
Pumping speed ~ 1 Torr/min was achieved at  1/8 of a turn opened roughing valve RV1
    Reply  Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown 


    
        
            Quote:
        
        
            
            Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter
    Reply  Fri Jul 30 22:07:42 2010, Koji, HowTo, VAC, How to stop and start slow pumpdown 
Kiwamu and Koji
The rough pumping was stopped at 230mmTorr. We are going to resume the pumping tomorrow morning.

    RV1 was closed with torque wheel.
    V3 was closed from MEDM
    RP3 wss stopped from MEDM
    The quick
    Reply  Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
I resumed the pumping down. It started from 9:55 am.
    Reply  Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
I stopped the pumping at 14:50 pm because I was going back home. I did the same procedure as Koji
wrote down (see here).
The P1 pressure reached 32 Torr.
Entry  Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr 
I resumed the pumping from 19:00.
Now the valve RV1 is full open. But the pumping is really slow as we are using only one RP.
After 3hrs of pumping, P1 reached 1.2mmtorr but still we need 2hrs of pumping...
    Reply  Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr 
I resumed the pumping today. Now the pressure is 0.48 torr. The pump was stopped.


    
        
            Quote:
        
        
            
    Reply  Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed veryslowpd.jpg


    
        
            Quote:
        
        
            
            Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was
Entry  Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started 
Blocked PSL output beam  into IFO
Checked: HV at IOO & OMC are off, jam nuts in position,
Closed V1 and VM3, opened VV1 to N2 regulator
    Reply  Tue Sep 28 00:07:45 2010, kiwamu, Configuration, VAC, Re: slow vent has started P1_history_100927.png
(Koji, Yuta, Kiwamu)
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
(Steve, Koji, Joe, Kiwamu, Yuta)
Background:
 The vent was started on Monday, and finished on Tuesday.
Entry  Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber P1060901.JPGP1060904.JPG
(Koji, Kiwamu, Yuta)
Lots of progress for the optics placement in the vacuum chamber.
Entry  Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed 
Kiwamu, Koji, Yutah, Rana, Jan and Steve
We removed the west access connector this afternoon.
Entry  Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table IMG_3627.jpg
YES
! We got the green light coming out from the OMC chamber to the PSL table !
Entry  Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened 
[Steve, Jenne, Suresh, Koji]
The remaining test mass chambers have been opened, and have light doors in place.  Now we can do all of the rest of the IFO alignment, and
then (hopefully) button up before the New Year.
Entry  Wed Dec 15 16:04:49 2010, steve, Configuration, VAC, vacuum valves found in default condition 
This condition is created when we run out of nitrogen that holds the valves in set positions. The Maglev and other turbos are still running in this configuration
so one has to pay attention that the foreline valves are open.
Reset  error message on vacuum screen and opened V4 & V5 at 3pm today.
Entry  Tue Dec 21 16:20:09 2010, steve, Configuration, VAC, pumpdown has started 
Slow pumpdown of rebuilt IFO-mark4 started
at 3pm today.
We are at 680Torr at this minute with 1.5 Torr/min speed.
Entry  Tue Dec 21 16:34:42 2010, kiwamu, Summary, VAC, All the test masses have been wiped 
 [Jenne and Kiwamu]
 We wiped all the test masses with isopropyl alcohol.
They became apparently much cleaner.
(how to)
Entry  Wed Dec 22 15:47:22 2010, Koji, Update, VAC, Tank closing procedure 
[Jenne Kiwamu Joe Osamu Steve Koji]
Yesterday (21st), we closed the BSC and the four testmass chambers.
We splitted the team into three.
Entry  Wed Dec 22 17:24:50 2010, steve, Configuration, VAC, slow pumpdown at 12 hours slowpd12h.jpg
We have reached 200 Torr at 12 hours of slow pumping speed. Kiwamu stopped the pumping for 11 hrs last night .and I restarted it this morning.
Now RV1 is fully open with butterfly valve in place  and the second roughing  pump RP3 was just turned on.
 
    Reply  Wed Dec 22 21:38:47 2010, kiwamu, Configuration, VAC, Re:slow pumpdown at 12 hours 
I stopped the pumping at 9:30 pm. Now we are at 29 torr.


    
        
            Quote: from  #4089
        
        
            
    Reply  Thu Dec 23 13:30:09 2010, steve, Configuration, VAC, slow pumpdown complete slow2dpd.jpg
The pump down continued this morning by the removal of the butterfly valve. Two roughing pumps were used to reach 500 mTorr
The Maglev monitoring MEDM screen "Rotating" indicator is not
working. It is on all times. Please look at Maglev controller monitor for real information.
Entry  Tue Jan 11 11:39:45 2011, steve, Update, VAC, RGA is turned on pd70d22.jpg
Joe updated the rga procedure in the wiki and we turned on the filament. It will take a few days to reach thermal equilibrium.
TP2 dry fore pump was replaced at 910mTorr
    Reply  Mon Jan 31 16:12:11 2011, steve, Update, VAC, Vertex crane upgrade shorth coming P1070364.JPGP1070358.JPG


    
        
            
             The upgrade is almost finished. I found that the passive latch lock  is
not closing down all the way. It has about a 3/8" gap.    See Atm. 1 & 2
Entry  Fri Feb 11 09:27:03 2011, steve, Configuration, VAC, RGA scan rgascan20110211.jpgpressurepd70.jpg
The RGA scan is normal at day 52 of this pump down.
Light power BS 1064nm ~25mW, ETMX 532nm ~5mW
Entry  Wed Mar 9 17:29:11 2011, steve, Summary, VAC, single O-ring protection so1.jpgP1070458.JPG
We have one single O-ring on the 40m vacuum envelope. It is on the OOC west side, facing the AP table. This O-ring has to be protected from the force
of this
door. There should be 3 shims  ~120 degrees apart to carry the full load, so it is not the O-ring that is getting squashed.
Entry  Fri May 6 15:59:40 2011, steve, Update, VAC, TP3 fore pump replaced 
Dry fore pump of TP3 replaced by brand new Varian SH-110  at  1.1 Torr_75,208 hrs
The annuloses were closed off for 25 minutes. We are back to VACUUM NORMAL mode.
The TP3 fore line pressure dropped to 44 mTorr at 25 minutes in operation.......9.4mTorr at day 2 with full annulos load