    Reply  Fri Dec 11 14:19:22 2009, Koji, Configuration, VAC, pumpdown has started 
    Reply  Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed pd7h.jpgoplevpd8h.jpg
Entry  Thu Jan 21 11:08:30 2010, kiwamu, steve, Update, VAC, Dry Pump replacement DSCN0428.JPG
Entry  Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve  slow.JPG
Entry  Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed 
    Reply  Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back 
Entry  Thu Feb 18 15:39:16 2010, Koji and Steve, Configuration, VAC, valve condition: ALL OFF 
Entry  Fri Feb 19 10:18:19 2010, Jenne, Update, VAC, The P1 vac pressure is almost to 3mTorr VacPressureAlmostShutoffLaser_19Feb2010.png
Entry  Mon Feb 22 11:38:05 2010, joe, jenne and steve, Configuration, VAC, vacuum is back to normal 
Entry  Tue Feb 23 13:37:04 2010, kiwamu and steve, Configuration, VAC, venting the 40m vac envelope 
    Reply  Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak outgleak.jpg
Entry  Tue Feb 23 19:00:45 2010, kiwamu, Configuration, VAC, vent finished 
    Reply  Tue Feb 23 19:07:43 2010, kiwamu and steve, Configuration, VAC, vent is completed vent2010feb23.jpg
Entry  Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off ventd3.jpg
    Reply  Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal 
Entry  Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18 bg-d18_20100312scan.png
Entry  Fri Apr 16 17:46:54 2010, Koji, Update, VAC, Peeting mirrors aligned 
Entry  Fri May 21 00:30:44 2010, Jenne, Update, VAC, TP3 fore pump is very loud 
    Reply  Fri May 21 08:28:29 2010, steve, Configuration, VAC, TP3 turned off 
Entry  Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced 
Entry  Fri May 28 13:32:01 2010, alberto, kiwamu, Update, VAC, vacuum work 
    Reply  Fri May 28 13:51:51 2010, Jenne, Update, VAC, vacuum work 
    Reply  Fri May 28 14:24:30 2010, Jenne, Update, VAC, vacuum work 
Entry  Wed Jun 23 23:55:03 2010, Katharine, Sharmila, Rana, Steve and Kiwamu, Update, VAC, wiped the BS 
    Reply  Thu Jun 24 11:16:32 2010, Sharmila, Rana and Kiwamu, HowTo, VAC, Inspection of the BS (sorry, no sounds) 
Entry  Thu Jun 24 16:59:24 2010, josephb, Update, VAC, Finished restoring the access connector and door 
Entry  Tue Jun 29 17:10:49 2010, steve, rana, Update, VAC, slow pumpdown started 
    Reply  Tue Jun 29 23:49:18 2010, steve, rana, Update, VAC, slow pumpdown started Untitled.png
    Reply  Wed Jun 30 00:45:26 2010, rana, Update, VAC, slow pumpdown stopped for the night 
    Reply  Wed Jun 30 15:24:04 2010, steve,kiwamu, Update, VAC, slow pumpdown copmlete slowpd.jpgbutterfly.JPG
Entry  Thu Jul 1 10:26:34 2010, steve, Configuration, VAC, pd68 at vacuum normal state pd68slow2d.jpgpem134d.jpg
Entry  Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started 
    Reply  Tue Jul 20 23:52:36 2010, kiwamu, Update, VAC, update: slow vent has started untitled.png
    Reply  Wed Jul 21 12:41:31 2010, kiwamu, Update, VAC, vent finished 
    Reply  Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished 30hvent.jpg
Entry  Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started slowpd5hr.jpg
    Reply  Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown 
    Reply  Fri Jul 30 22:07:42 2010, Koji, HowTo, VAC, How to stop and start slow pumpdown 
    Reply  Sat Jul 31 10:12:05 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
    Reply  Sat Jul 31 14:59:33 2010, kiwamu, Update, VAC, Re: How to stop and start slow pumpdown 
Entry  Sat Jul 31 22:35:01 2010, Koji, Update, VAC, Vac-P1 still 1.2mtorr 
    Reply  Sun Aug 1 18:50:35 2010, Koji, Update, VAC, P1 = 0.48 torr 
    Reply  Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed veryslowpd.jpg
Entry  Mon Sep 27 08:59:50 2010, steve, Configuration, VAC, slow vent has started 
    Reply  Tue Sep 28 00:07:45 2010, kiwamu, Configuration, VAC, Re: slow vent has started P1_history_100927.png
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
Entry  Mon Oct 4 19:48:00 2010, yuta, Update, VAC, several mirrors installed to ITMX/BS chamber P1060901.JPGP1060904.JPG
Entry  Tue Oct 5 17:39:21 2010, steve, Configuration, VAC, west access connector removed 
Entry  Tue Oct 5 21:22:46 2010, yuta, Update, VAC, green beam reached PSL table IMG_3627.jpg
Entry  Mon Nov 15 16:09:44 2010, Jenne, Update, VAC, ETMX, ETMY, ITMY chambers opened 