40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 328 of 349  Not logged in ELOG logo
    Reply  Mon Apr 5 11:39:41 2010, steve, Update, SUS, ITM-south installation 
    Reply  Mon Apr 5 14:10:06 2010, steve, Update, SUS, sus damping restored  
Entry  Wed Apr 7 09:00:01 2010, steve, HowTo, PEM, prepare to open chamber 0.5micron.jpg
Entry  Thu Apr 15 14:47:28 2010, steve, Update, Electronics, 25MHZ oscillation of HP4195A P1060246.JPGP1060249.JPG
Entry  Tue Apr 20 07:48:42 2010, steve, Update, PSL, ion pump HV turned on 
Entry  Tue Apr 20 08:00:52 2010, steve, Update, SUS, ETMY damping restored 
Entry  Tue Apr 20 09:15:15 2010, steve, Summary, SAFETY, annual safety audit safa.PDF
Entry  Tue Apr 20 10:55:10 2010, steve, Bureaucracy, SAFETY, Kevin Kuns received safety training  
Entry  Thu Apr 22 09:03:54 2010, steve, Omnistructure, PEM, aircondition can not be turned off 
    Reply  Mon Apr 26 11:13:28 2010, steve, Omnistructure, PEM, AC on/off is working 
    Reply  Wed May 12 09:16:29 2010, steve, Update, Green Locking, Reflection from ETM and ITM ! 
    Reply  Fri May 14 08:18:46 2010, steve, Update, Green Locking, Reflection from ETM and ITM ! itmx1hzos.jpg
Entry  Mon May 17 10:57:16 2010, steve, Configuration, SUS, damping restored to ETMYs 
Entry  Tue May 18 11:54:29 2010, steve, Configuration, SAFETY, psl mechanical shutter is not working 
    Reply  Tue May 18 15:09:02 2010, steve, Configuration, SAFETY, PSL output shutter in order again 
    Reply  Fri May 21 08:28:29 2010, steve, Configuration, VAC, TP3 turned off 
Entry  Fri May 21 16:37:35 2010, steve, Configuration, VAC, tp3's drypump replaced 
Entry  Mon May 24 07:53:57 2010, steve, Configuration, PEM, air cond. just turned ON acoff.jpg
    Reply  Tue Jun 1 11:47:14 2010, steve, Update, PEM, lead balls on concrete P1060269.JPG
Entry  Tue Jun 1 15:51:42 2010, steve, Update, PEM, foam box for good thermal stability albx2.PDF
Entry  Wed Jun 2 07:54:55 2010, steve, Update, MOPA, laser headtemp is up htemp.jpghtemp20d.jpg
Entry  Wed Jun 2 18:09:32 2010, steve, Update, PEM, seismometers off of linoleum floor 
    Reply  Wed Jun 2 21:21:43 2010, steve, Update, PEM, seismometers off of linoleum floor 
Entry  Wed Jun 9 10:31:13 2010, steve, Update, SAFETY, safety training 
Entry  Wed Jun 23 17:48:16 2010, steve, Update, MOPA, laser head temp htemp120d.jpg
Entry  Tue Jun 29 08:41:06 2010, steve, Update, MOPA, MOPA is dead laserisdead.jpg
Entry  Wed Jun 30 18:16:55 2010, steve, Update, SAFETY, SURF safety training 2010 DSC_1902.JPG
Entry  Thu Jul 1 10:26:34 2010, steve, Configuration, VAC, pd68 at vacuum normal state pd68slow2d.jpgpem134d.jpg
Entry  Mon Jul 12 10:23:51 2010, steve, Update, PEM, air condition maintenance is today pem2y.jpg
Entry  Tue Jul 13 10:02:30 2010, steve, Update, MOPA, laser power is dropping slowly power100d.jpg
Entry  Tue Jul 20 08:04:31 2010, steve, Configuration, VAC, slow vent has started 
    Reply  Thu Jul 22 08:07:27 2010, steve, Update, VAC, vent finished 30hvent.jpg
Entry  Fri Jul 23 08:15:59 2010, steve, Update, PSL, ref cavity ion pump 
Entry  Fri Jul 23 15:32:02 2010, steve, Update, PEM, control room AC set point changed 
Entry  Fri Jul 23 16:00:35 2010, steve, Update, SAFETY, crane load test tomorrow 
    Reply  Mon Jul 26 08:51:31 2010, steve, Update, PEM, lowering AC setpoint by 2F makes PSL happy htempRTemp.jpg
Entry  Tue Jul 27 11:43:24 2010, steve, Update, PEM, air quality is bad today pemtoday.jpg
Entry  Wed Jul 28 14:54:56 2010, steve, Update, SAFETY, evacuation drill at the 40m P1060520.JPG
Entry  Fri Jul 30 09:55:34 2010, steve, Configuration, VAC, slow pumpdown has started slowpd5hr.jpg
    Reply  Fri Jul 30 14:53:09 2010, steve, Update, General, PSL table leg upgrade psllegs.PDF
    Reply  Fri Jul 30 17:54:55 2010, steve, HowTo, VAC, How to stop and start slow pumpdown 
    Reply  Mon Aug 2 10:26:15 2010, steve, Configuration, VAC, very slow pumpdown completed veryslowpd.jpg
    Reply  Fri Aug 6 08:09:15 2010, steve, Update, PSL, PSL preparation work 
Entry  Tue Aug 10 17:21:48 2010, steve, Update, General, PSL optical table is at 30" height P1060586.JPGP1060583.JPGP1060591.JPGP1060593.JPGP1060597.JPG
Entry  Thu Aug 12 10:56:31 2010, steve, Update, Environment, dusty floor work in progres 
    Reply  Thu Aug 12 16:18:46 2010, steve, Update, Environment, tiles and adhesive removed P1060604.JPGP1060606.JPGP1060603.JPGP1060610.JPGDSC_2388.JPG
Entry  Fri Aug 13 18:32:48 2010, steve, Update, PEM, new legs attached to optical table P1060612.JPGP1060626.JPGP1060631.JPGP1060636.JPG
Entry  Tue Aug 17 14:09:15 2010, steve, Update, PEM, PSL optical table schedule  
    Reply  Wed Aug 18 16:42:14 2010, steve, Update, PEM, PSL optical table legs load balanced P1060671.JPGP1060674.JPGP1060670.JPGP1060676.JPG
Entry  Thu Aug 19 16:03:59 2010, steve, Update, PEM, grouting of PSL tripod legs P1060687.JPGP1060681.JPGP1060686.JPGP1060696.JPG
ELOG V3.1.3-