ID |
Date |
Author |
Type |
Category |
Subject |
Text |
 |
2210
|
Mon Nov 9 12:09:10 2009 |
Alberto | Omnistructure | Environment | BNC Cable Laid Down from South End to East VErtex | I laid down the floor a BNC cable from
the Y End table to the BNC Chamber. The cable
runs next to the east wall. |
|
2211
|
Mon Nov 9 13:17:07 2009 |
Alberto | Configuration | ABSL | NPRO on | I turned the auxialiary NPRO for the AbsL
Experiment on. Its shutter stays closed. |
|
2213
|
Mon Nov 9 13:26:19 2009 |
Alberto | Omnistructure | Environment | Tidying up BNC cables rack around the lab | We have thousands of miles of BNC cables
in the lab but we still don't find one when
we need it. I decided to solve the problem. |
|
2214
|
Mon Nov 9 14:53:47 2009 |
Alberto | Omnistructure | Environment | Tidying up BNC cables rack around the lab | This would be a good trial once you put
the label "BNC only" on
the wall. |
|
2217
|
Mon Nov 9 15:11:02 2009 |
Alberto | Update | LSC | Everything put back as it was |
|
|
2219
|
Mon Nov 9 16:32:36 2009 |
Alberto | Frogs | Environment | Shot of the white board yesterday before erasing | Yesterday Rana and I needed some room on
the white board in the Control Room. We had
to erase some of the stuff present on the |
 |
2220
|
Mon Nov 9 18:27:30 2009 |
Alberto | Frogs | Computers | OMC DCPD Interface Box Disconnected from the power Supply | This afternoon I inadvertently disconnected
one of the power cables coming from the power
supply on the floor next to the OMC cabinet |
|
2226
|
Tue Nov 10 13:02:36 2009 |
Alberto | Update | LSC | X and Y Arm Cavity Poles Measurement | From fitting the arm cavity transfer functions
I got the following values for the cavity
pole frequencies. |
 |
2227
|
Tue Nov 10 17:01:33 2009 |
Alberto | Configuration | IOO | c1ioovme and c1iool0 rebooted | This afternoon, while I was trying to add
the StochMon channels to the frames, I rebooted
the c1ioovme and c1iool0. |
|
2228
|
Tue Nov 10 17:49:20 2009 |
Alberto | Metaphysics | Computers | Test Point Number Mapping | I found this interesting entry by Rana
in the old (deprecated) elog : here
I wonder if Rolf has ever written |
|
2229
|
Tue Nov 10 19:19:57 2009 |
Alberto | Update | ABSL | Rotated polarizer on the PSL table, along the MC input pick off beam | Aligning the beam for the PLL of the AbsL
Experiement I rotated the polarizer along
the path of the MC Input pick off beam (= |
|
2230
|
Tue Nov 10 19:21:53 2009 |
Alberto | Update | ABSL | PLL Alignment | I've been trying to lock the PLL for the
AbsL Experiment but I can't see the beat
(between the auxiliary NPRO and the PSL). |
|
2236
|
Wed Nov 11 12:29:44 2009 |
Alberto | Frogs | PSL | MC Locked on the wrong mode? | This morning, after Steve pointed out that
the readout RFAMPD_DC was zero, I thought
of realigning the beam on the photodiode. |
|
2238
|
Wed Nov 11 15:04:52 2009 |
Alberto | Update | ABSL | Working on the AP table | I've opened the AP table and I'm working
on it. |
|
2239
|
Wed Nov 11 16:18:57 2009 |
Alberto | Update | ABSL | Working on the AP table |
|
|
2249
|
Thu Nov 12 10:45:02 2009 |
Alberto | Update | PSL | Abandoned Frequency Generator | This morning I found a frequency generator
connected to something on the PSL table sitting
on the blue step next to the sliding doors. |
|
2250
|
Thu Nov 12 10:45:36 2009 |
Alberto | Update | ABSL | Working on the AP table | I've opened the AP table and I'm working
on it.
Also auxiliary NPRO turned on and |
|
2252
|
Thu Nov 12 11:34:38 2009 |
Alberto | Update | ABSL | Working on the AP table |
|
|
2253
|
Thu Nov 12 12:50:35 2009 |
Alberto | Update | Computers | StochMon calibrated channels added to the data trend | I added the StochMon calibrated channels
to the data trend by including the following
channel names in the C0EDCU.ini file: |
|
2254
|
Thu Nov 12 12:51:45 2009 |
Alberto | Update | ABSL | Working on the AP table |
|
|
2256
|
Thu Nov 12 16:13:05 2009 |
Alberto | Update | PSL | MC Trans Offset | On Rana's suggestion I checked the MC
transmission QPD (C1:IOO-MC_TRANS_SUM). I
found that the readout is almost zero when |
|
2257
|
Thu Nov 12 16:53:59 2009 |
Alberto | Update | ABSL | Working on the AP table |
|
|
2261
|
Thu Nov 12 18:10:27 2009 |
Alberto | Update | ABSL | PLL Locked | I locked the PLL and made some first measuremtns
of the spectrum of the error signal. I'll
post them later. |
|
2271
|
Sun Nov 15 18:42:10 2009 |
Alberto | Update | Locking | Interferometer fully locked for 3331 seconds | This afternoon, I tried to lock the interferometer
again after a few days.
After a couple of failed attempts, |
|
2302
|
Thu Nov 19 16:04:48 2009 |
Alberto | Configuration | elog | Elog debugging output - Down time programmed today to make changes | We want the elog process to run in verbose
mode so that we can see what's going. The
idea is to track the events that trigger |
|
2303
|
Thu Nov 19 18:49:55 2009 |
Alberto | Configuration | elog | Elog debugging output - Down time programmed today to make changes |
|
|
2308
|
Fri Nov 20 13:54:45 2009 |
Alberto | Omnistructure | Environment | New Paper and Cardboard Recycling Bins Introduced to the 40m | The 40m produces a large amount of paper
and cardboard waste. It would be worth it
if we disposed those kind of garbages for |
 |
2321
|
Tue Nov 24 14:33:22 2009 |
Alberto | Update | ABSL | working on the AP table | I'm working on the AP table. I also opened
the auxiliary NPRO shutter. The auxiliary
beam is on its path on the AP table and PSL |
|
2324
|
Tue Nov 24 19:16:02 2009 |
Alberto | Update | ABSL | working on the AP table |
|
|
2326
|
Wed Nov 25 08:43:08 2009 |
Alberto | Update | ABSL | Working on the AP table | I'm working on the AP table. I also opened
the auxiliary NPRO shutter. The auxiliary
beam is on its path on the AP table and PSL |
|
2328
|
Wed Nov 25 10:20:47 2009 |
Alberto | Update | ABSL | AbsL PLL not able to lock | Last night something happened on the
beat between the PSL beam and the auxiliary
NPRO beam, that spoiled the quality of the |
|
2329
|
Wed Nov 25 11:02:54 2009 |
Alberto | Update | ABSL | AbsL PLL not able to lock |
|
|
2334
|
Wed Nov 25 15:42:27 2009 |
Alberto | Update | ABSL | Working on the AP table |
|
|
2337
|
Wed Nov 25 20:14:58 2009 |
Alberto | Update | ABSL | AbsL PLL not able to lock: problem fixed |
|
|
2338
|
Wed Nov 25 20:24:49 2009 |
Alberto | Update | ABSL | PLL Open Loop Gain Measured | I measured the open loop gain of the PLL
in the AbsL experiment.
I repeated the measurement twice: |
 |
2339
|
Wed Nov 25 20:28:17 2009 |
Alberto | Update | ABSL | Stopped working on the AbsL | I closed the shutter of the NPRO for the
night. |
|
2345
|
Mon Nov 30 10:28:47 2009 |
Alberto | AoG | all down cond. | sea of red |
|
|
2346
|
Mon Nov 30 11:29:40 2009 |
Alberto | AoG | all down cond. | sea of red |
|
|
2350
|
Thu Dec 3 15:55:24 2009 |
Alberto | AoG | LSC | RF AM Stabilizer Output Power | Today I measured the max output power at
the EOM output of one of the RF AM Stabilizers
that we use to control the modulation depth. |
|
2365
|
Tue Dec 8 10:20:33 2009 |
Alberto | DAQ | Computers | Bootfest succesfully completed | Alberto, Kiwamu, Koji,
this morning we found the RFM network
and all the front-ends down. |
|
2376
|
Thu Dec 10 08:40:12 2009 |
Alberto | Update | Computers | Fronte-ends down | I found all the front-ends, except for
C1SUSVME1 and C0DCU1 down this morning. DAQAWG
shows up green on the C0DAQ_DETAIL screen |
|
2378
|
Thu Dec 10 08:50:33 2009 |
Alberto | Update | Computers | Fronte-ends down |
|
|
2384
|
Thu Dec 10 13:10:25 2009 |
Alberto | Configuration | LSC | 166 LO Disconnected | I temporarily disconnected the Heliax cable
that brings the 166MHz LO to the LSC rack.
I'm doing a couple of measurement |
|
2389
|
Thu Dec 10 17:05:21 2009 |
Alberto | Configuration | LSC | 166 MHz LO SMA-to-Heliax connection repaired | I replaced the SMA end connector for the
166 MHZ Local Oscillator signal that goes
to the back of the flange in the 1Y2 rack. |
|
2393
|
Thu Dec 10 18:31:44 2009 |
Alberto | Configuration | LSC | 166 LO Disconnected |
|
|
2396
|
Fri Dec 11 11:42:26 2009 |
Alberto | Configuration | LSC | 166 LO Disconnected |
|
|
2397
|
Fri Dec 11 13:18:17 2009 |
Alberto | Configuration | VAC | pumpdown has started |
|
|
2402
|
Fri Dec 11 19:51:13 2009 |
Alberto | Configuration | LSC | 166 LO Disconnected |
|
|
2413
|
Mon Dec 14 14:16:14 2009 |
Alberto | Update | Treasure | LOCKSTARS |
|
|
2415
|
Mon Dec 14 19:33:04 2009 |
Alberto | Update | General | Arm Cavity Poles measured again after cleaning the optics last week | Last week we vented and we cleaned the
main optics of the arm cavities.
I measured the frequency of the cavity |
  |