40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 328 of 349  Not logged in ELOG logo
ID Date Authorup Type Category Subject
  2801   Thu Apr 15 14:47:28 2010 steveUpdateElectronics25MHZ oscillation of HP4195A

The 1979 vintage RF spectrum analyzer HP4195A  sn2904J01587 shipped out  for repair today to http://www.avalontest.com

It has a 25 MHZ oscillation when you go  below 150 MHZ in your sweep....atm1 with the larger amplitude shows this 25 MHZ

Atm2 is displaying  full sweep-sign scans from 1 to 500 MHZ.....here one can clearly see the three segment of the scan:

1, large amplitude 25 MHZ oscillation dominating the spectrum up to 150 MHZ

2, the mid section from 150 MHZ  to 300 MHZ with medium size amplitude is normal

3, from 300 MHZ to 500 MHZ the amplitude is decreasing.......showing the disadvantage of using a 300 MHZ oscilloscope

 

 

 

Attachment 1: P1060246.JPG
P1060246.JPG
Attachment 2: P1060249.JPG
P1060249.JPG
  2812   Tue Apr 20 07:48:42 2010 steveUpdatePSLion pump HV turned on

We found ref-cavity HV was off yesterday afternoon. It was turned back on.

  2813   Tue Apr 20 08:00:52 2010 steveUpdateSUSETMY damping restored

ETMY sus damping was restored

  2814   Tue Apr 20 09:15:15 2010 steveSummarySAFETYannual safety audit
Attachment 1: safa.PDF
safa.PDF
  2815   Tue Apr 20 10:55:10 2010 steveBureaucracySAFETYKevin Kuns received safety training

The 40m's new undergrad Kevin Kuns was introduced to 40m safety hazards. He is new and needs guidance as specially with 2W laser work.

Peter King will train him on Friday to LIGO-laser standard.

 

  2831   Thu Apr 22 09:03:54 2010 steveOmnistructurePEMaircondition can not be turned off

Koji and I wanted to turn off the IFO-room AC so the wind would not blow on MC1-3. We could not. The switches were probably bypassed when the power transformer was replaced at the last scheduled power outage.

  2842   Mon Apr 26 11:13:28 2010 steveOmnistructurePEMAC on/off is working

Quote:

Koji and I wanted to turn off the IFO-room AC so the wind would not blow on MC1-3. We could not. The switches were probably bypassed when the power transformer was replaced at the last scheduled power outage.

 There is one three position manual/off/auto switch next to the filter for each unit at CES. They have to be in AUTO position when we want to turn AC on/off from the lab.

  2919   Wed May 12 09:16:29 2010 steveUpdateGreen LockingReflection from ETM and ITM !

 

 Now I know why Rana was wearing his bright green pants yesterday. It is nice to see the green beam in the 40m IFO again. It calls for celebration!

I stopped AWG 1Hz drive of ITMYs (south-arm) I still see unblocked beams at the ETMYs table. We have plenty of cleaned razor beam traps to be used. Please block Faraday rejects etc

  2930   Fri May 14 08:18:46 2010 steveUpdateGreen LockingReflection from ETM and ITM !

I stopped AWG  1 Hz drive to ITMYs. ITMXe was also driven or oscillating. ITMXe damping was off, so I turned it on. It did not effect it's oscillation

Attachment 1: itmx1hzos.jpg
itmx1hzos.jpg
  2939   Mon May 17 10:57:16 2010 steveConfigurationSUSdamping restored to ETMYs

ETMY-south sus damping was restored

  2943   Tue May 18 11:54:29 2010 steveConfigurationSAFETYpsl mechanical shutter is not working

As we learned yesterday, the PSL laser power out put mechanical shutter is not working in the remote mode. It only works in local manual mode.

Do not rely on the MEDM screen monitor readout! The position is only changing on the monitor. The main beam must be blocked before the output periscope.

  2947   Tue May 18 15:09:02 2010 steveConfigurationSAFETYPSL output shutter in order again

Quote:

As we learned yesterday, the PSL laser power out put mechanical shutter is not working in the remote mode. It only works in local manual mode.

Do not rely on the MEDM screen monitor readout! The position is only changing on the monitor. The main beam must be blocked before the output periscope.

Ben found the Sorenson 5V ps off. It was turned off since our last scheduled power outage. I wonder what else is running on 5V in the PSL? This power supply should be on the

"alarm handler"  list to avoid future repeat of this condition. However a real safety switch would have confirming position sensors of the shutter open or closed. Is there such thing at the sites?

  2965   Fri May 21 08:28:29 2010 steveConfigurationVACTP3 turned off

Quote:

[Jenne, Kiwamu, and Steve via phone]

Around 9:30pm, Kiwamu and I came back from dinner, and were getting ready to begin the beam scan measurements.  I noticed that one of the vacuum pumps was being very loud.  Kiwamu noted that it is the fore pump for TP3's turbo, which he and Steve replaced in January (elog 2538).  We had not noticed these noises before leaving for dinner, around 8pm.

We called Steve at home, and he could hear the noise through the phone. He said that even though it was really loud, since it was reading 3.3mTorr (on the display of the controller, in the vacuum rack just above head-height) which is close to the nominal value, it should be fine to leave.  He will check it out in the morning.  If it had been reading at or above ~1Torr, that's indicative of it being really bad, and we would have needed to shut it off.

For future reference, in case we need to turn it off, Steve said to use the following procedure:

1. Close VM3, to isolate the RGA, which is what this pump is currently (while we're at atmosphere) pumping on.  I don't know if there are other things which would need to be shut at this stage, if we were at vacuum nominal.

2. Close VM5, which is right in front of TP3, so TP3's pump is just pumping on itself.

3. Push the "Stop" button on the Turbo controller for TP3, in the vacuum rack, about waist level.  Turning off the turbo will also turn off the fore pump.

UPDATE, 1am: The controller in the rack is reading 3.1mTorr, so the pump, while still noisy, still seems to be working.

 The foreline pressure of TP3 is 2.9 mTorr  The drypump is loosing it's bearing and it is very noisy.

V3, V5 closed and TP3 small turbo controller off. This turned off the noisy forepump that has to be replaced.

RGA is running at cc4 2e-6 Torr

The RGA was turned off at cc4 1e-5 Torr

  2970   Fri May 21 16:37:35 2010 steveConfigurationVACtp3's drypump replaced

Bob replaced the tipseal in an other drypump and I swapped it in. TP3 turbo is running again, it's foreline pressure is 40 mTorr. The RGA is still off

  2972   Mon May 24 07:53:57 2010 steveConfigurationPEMair cond. just turned ON

IFO room temp 27.5C , Please remember to turn AC back on !

Attachment 1: acoff.jpg
acoff.jpg
  3024   Tue Jun 1 11:47:14 2010 steveUpdatePEMlead balls on concrete

Quote:

Valera and I put the 2 Guralps and the Ranger onto the big granite slab and then put the new big yellow foam box on top of it.

There is a problem with the setup. I believe that the lead balls under the slab are not sitting right. We need to cut out the tile so the thing sits directly on some steel inserts.

You can see from the dataviewer trend that the horizontal directions got a lot noisier as soon as we put the things on the slab.

 The tiles were cut out in 1.5" ID circle to insure that the 7/16" OD lead balls would not touch the tiles on Wednesday, May 26, 2010

Granite surface plate specifications: grade B, 18" x 24" x 3" , 139 lbs

These balls and granite plate were removed by  Rana in entry log #3018 at 5-31-2010

Attachment 1: P1060269.JPG
P1060269.JPG
  3025   Tue Jun 1 15:51:42 2010 steveUpdatePEMfoam box for good thermal stability

This box was made  to provide good thermal stability for seismometer calibration. There is an inner solid shell of 0.064" Al box that is covered by 2" insulation

inside and outside. The polystyrene foam is "CertiFoam 25 SE " from McMasterCarr #9255K3.

Attachment 1: albx2.PDF
albx2.PDF
  3033   Wed Jun 2 07:54:55 2010 steveUpdateMOPAlaser headtemp is up

Is the cooling line clogged? The chiller temp is 21C See 1 and 20 days plots

Attachment 1: htemp.jpg
htemp.jpg
Attachment 2: htemp20d.jpg
htemp20d.jpg
  3037   Wed Jun 2 18:09:32 2010 steveUpdatePEMseismometers off of linoleum floor

Steve for Nancy,

Seismometer interface box ac power was turned off, Guralps disconnected and moved. Ranger locked, moved and released. Nancy will describe the rest soon.

 

  3039   Wed Jun 2 21:21:43 2010 steveUpdatePEMseismometers off of linoleum floor

Quote:

Steve for Nancy,

Seismometer interface box ac power was turned off, Guralps disconnected and moved. Ranger locked, moved and released. Nancy will describe the rest soon.

The flattened lead balls were checked for their heights by the calliper, and were all in the range of 9.50 to 9.70 mm.

The rechecking was done by using these balls between two aluminium plates and checking their levelling. When confirmed this, we proceeded to install the balls(no more balls :P ) in their place.

The Guralps were switched off by switching off the power supply to them. The ranger mass was clamped in order to be able to move it. This can be undone by rotating the transport screw counter-clockwise.

We installed the flattened lead ballsin the space made for them. The granite was then placed on it with the help of many other people in the lab.  It was lowered by hanging it on two straps held by people , and then placed in the space marked for it.

Did we then turn on the seismometers? Did we release the locking screw on the Ranger? What happened to Bat-Boy??? Since they make a good mystery I will choose to leave them out of my elog entry.

  3058   Wed Jun 9 10:31:13 2010 steveUpdateSAFETYsafety training

Nancy and Sharmila received introductory early bird surf safety training for the 40m lab.

  3108   Wed Jun 23 17:48:16 2010 steveUpdateMOPAlaser head temp

The laser chiller temp is fluctuating and the power output is decreasing. See 120 days plot.

Yesterday I removed ~300cc water from the overflowing chiller tank.

Attachment 1: htemp120d.jpg
htemp120d.jpg
  3130   Tue Jun 29 08:41:06 2010 steveUpdateMOPAMOPA is dead

I found the laser dead this morning.

The crane people are here to unjam it.

Laser hazard mode is lifted and LASER SAFE MODE is in place. No safety glasses but CRANE HAZARD is still active.

Stay out of the 40m lab !

 

 

Attachment 1: laserisdead.jpg
laserisdead.jpg
  3150   Wed Jun 30 18:16:55 2010 steveUpdateSAFETYSURF safety training 2010

40m SURFs Razib Obaid, Nancy Aggarwal, Unknown Bearded SMURF, Megan Daily, Gopal Nataraj, Katharine Larson and Sharmila Dhevi received 40m specific safety training on June 23, 2010.

Attachment 1: DSC_1902.JPG
DSC_1902.JPG
  3152   Thu Jul 1 10:26:34 2010 steveConfigurationVACpd68 at vacuum normal state

Slow pump down _pd68 has reached the vacuum normal state.  CC4_Rga region is pumped now. The RGA is still off.

Precondition to this pump down:                                                                                                                                                                                                                                                           129 days at atm,                                                                                                                                                                                                                                                                                         ITMs replaced. MMT, oplev and other components were removed from BSC, ITMCs. New MMT mirrors are in.                                                                                                             IOO_access_connector was out. The end chambers were not opened.

 

Attachment 1: pd68slow2d.jpg
pd68slow2d.jpg
Attachment 2: pem134d.jpg
pem134d.jpg
  3192   Mon Jul 12 10:23:51 2010 steveUpdatePEMair condition maintenance is today

The AC filters will be checked and/or replaced today. This means the AC will be off for sort periods of time. Temperature and particle count will be effected some what.

See 800 days plot

Attachment 1: pem2y.jpg
pem2y.jpg
  3202   Tue Jul 13 10:02:30 2010 steveUpdateMOPAlaser power is dropping slowly

I have just removed an other 400 cc of water from the chiller.  I have been doing this since the HTEMP started fluctuating.

The Neslab bath temp is 20.7C, control room temp 71F

 

Attachment 1: power100d.jpg
power100d.jpg
  3248   Tue Jul 20 08:04:31 2010 steveConfigurationVACslow vent has started

The PSL shutter was closed. The beam path  blocked two places. High voltage power supplies to IOO and OMC PZT were checked to be off. Oplevs are off. 

The south arm green cavity was misaligned yesterday

We would like to keep the vent speed at 1 torr / min. I'm venting with N2 now up to 25 PSI. We have 3 cylinder  of instrument grade air inside the lab. Additional supply will arrive later. It can be as late as 1pm

  3266   Thu Jul 22 08:07:27 2010 steveUpdateVACvent finished

Quote:

The vent has been finished successfully in this morning.

The vent was finished successfully this morning.

 Thanks to Kiwamu, Alberto and Koji

Attachment 1: 30hvent.jpg
30hvent.jpg
  3272   Fri Jul 23 08:15:59 2010 steveUpdatePSLref cavity ion pump

The ref cavity ion pump was running at 7.7kV instead of 5kV

This Digitel SPC-1 20 l/s ion pump should be running at 5kV

  3277   Fri Jul 23 15:32:02 2010 steveUpdatePEMcontrol room AC set point changed

The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F yesterday.

The MOPA headtemp is higher also. The Neslab chiller bath temp peaks around 21.6 C daily. This should be rock solid 20.00 C

It did not have any effect.

Now, I have just lowered the thermostat setting of room 101 from 73 to71F  I  hope Koji can take this.

  3279   Fri Jul 23 16:00:35 2010 steveUpdateSAFETYcrane load test tomorrow

All 3 cranes will be load tested at 1 ton tomorrow morning between 9am and 2pm

Do not come to the 40m lab during this period. We may disturb your experiment.

Please prepare your touchy set ups to take this test.

  3288   Mon Jul 26 08:51:31 2010 steveUpdatePEM lowering AC setpoint by 2F makes PSL happy

Quote:

The control room temp is warmer than usual. The heat exchanger Office Pro 18 set point was lowered from 70 to 68F yesterday.

The MOPA headtemp is higher also. The Neslab chiller bath temp peaks around 21.6 C daily. This should be rock solid 20.00 C

It did not have any effect.

Now, I have just lowered the thermostat setting of room 101 from 73 to71F  I  hope Koji can take this.

 Little change in the AC set temp can make wonders. Neslab chiller bath temp 19.99C is back to normal and daily variation of PSL are much better.

Attachment 1: htempRTemp.jpg
htempRTemp.jpg
  3297   Tue Jul 27 11:43:24 2010 steveUpdatePEMair quality is bad today

The lab is at 30,000 and Pasadena air is at 1.1 e+6 particles /cf min of 0.5 micron.

Attachment 1: pemtoday.jpg
pemtoday.jpg
  3311   Wed Jul 28 14:54:56 2010 steveUpdateSAFETYevacuation drill at the 40m

Head count at the evacuation drill today. I checked  alarms and flashers  at room 104,102,101, 103, 105 and 107. They were really loud and bright. 

Attachment 1: P1060520.JPG
P1060520.JPG
  3331   Fri Jul 30 09:55:34 2010 steveConfigurationVACslow pumpdown has started

Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed in the beam path. High voltage power supplies were checked to be off.

Pumping speed ~ 1 Torr/min was achieved at  1/8 of a turn opened roughing valve RV1

Attachment 1: slowpd5hr.jpg
slowpd5hr.jpg
  3333   Fri Jul 30 14:53:09 2010 steveUpdateGeneralPSL table leg upgrade

Quote:

July
29 Thu BS chamber work: Move cable towers / green steering mirrors / (2 TTs with TT charactrization) / Put the heavy door by 5PM.
30 Fri Pumping down
31 Sat WFS work by Nancy

Aug
1 Sun - 5 Thu WFS work by Nancy
5 Thu PSL Table prep
6 Fri PSL Table prep / Likely to shut down the PSL

9 Mon PSL Table prep / shutting down of the PSL (optional)
10 Tue PSL box Frame lifting
12 Thu PSL table tapping

16 Mon - 17 Tue concrete pouring preparation
19 Thu - 23 Fri Tripod placement
24 Tue - 26 Thu concrete pouring

The PSL table height will be raised to the level of the AP table. This will be done using 6 TMC's Rigid Damped Tripod legs. Their planed positions shown below.

The legs will be grouted to the floor with concrete.

 http://www.techmfg.com/products/floorplatforms/rigiddampedtripod.htm

Attachment 1: psllegs.PDF
psllegs.PDF
  3336   Fri Jul 30 17:54:55 2010 steveHowToVACHow to stop and start slow pumpdown

Quote:

Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed in the beam path. High voltage power supplies were checked to be off.

Pumping speed ~ 1 Torr/min was achieved at  1/8 of a turn opened roughing valve RV1

 We are at 370 Torr at 9 hrs of  pumping. RV1 is opened to ~ 3/8 turn orifice. We are using one roughing pump RP3  and butterfly valve is in place.

 

How to stop: 1, close RV1 by torque wheel  2, close V3 from MEDM screen  3, turn off RP3 roughing from MEDM screen  4, disconnect metal hose to oily pump

after butterfly valve. This KF-45 O-ring seal should be kept clean 5, place/close  45 mm cover blanks at the end of the hose and and on the 5" nipple.

 

How to start: 1, remove blanks from  hose and nipple 2, reconnect roughing pump hose to RV1 nipple  3, turn on PR3  4, open V3  5, open RV1 by wrench to ~3/8

6, fine tune RV1 opening to 1 Torr/min

 

ESSENTIAL: one operator has to be present when oilly roughing pump is connected to the vac. envelope

  3347   Mon Aug 2 10:26:15 2010 steveConfigurationVACvery slow pumpdown completed

Quote:

Bob and Steve closed BS chamber with the help of the manual Genie lift and the pump down started. The PSL shutter was closed and manual block was placed in the beam path. High voltage power supplies were checked to be off.

Pumping speed ~ 1 Torr/min was achieved at  1/8 of a turn opened roughing valve RV1

 3 days pump down #69 completed. Thanks to Koji  and Kiwamu  who did more roughing on Saturday and Sunday.

Attachment 1: veryslowpd.jpg
veryslowpd.jpg
  3371   Fri Aug 6 08:09:15 2010 steveUpdatePSLPSL preparation work

Quote:

PSL preparation work

Aug 5th 10am-4pm?: (Kiwamu, Alberto, Koji)

  • Removing the unused cables around the PSL table and the control room

Aug 6th 10am-4pm?: (Kiwamu (ex. noon-2pm), Alberto, Koji, Jenne ('till noon) )

  • Labeling the cables to be disconnected / making the records ==> All
  • Removals
    • the big nuts at the side of the PSL table ==> Steve
    • the cable ties on the PSL frame ==> Easy
    • Innolight 2W ==> Kiwamu
    • the green pickoff optics at the edge, if necessary ==> Kiwamu talking with Steve
    • Optics on the shelf ==> Jenne / Koji
    • Oscilloscopes on the shelf ==> Jenne / Koji
    • CCD camera connections (optional, as far as not critical for the operation)
  • Put poles on the table (for the plastic sheet) ==> Alberto / Koji

Aug 9th  9am-5pm: (Steve, Jenne, Alberto, Koji)

  • Disconnecting the cables ==> All
  • Shutting down the PSL ==> Steve/Koji
    • Draining the cooling water  ==> Steve
  • Removals
    • The accelerometers ==> Jenne
    • the PSL chamber ==> Steve
    • Periscopes ==> Alberto
  • Sealing of the table with the plastic sheets

 

  • The chiller is planned to go to MIT

 

Monday, August 9

 We should move the reference cavity too. Will this cavity be pumped while relocated?

Check and insure that attached and cut-free cables of PSL have enough room to tolerate the raising of the enclosure by 6"

I had second thoughts about the power line to the OMC. Koji was right, we should disconnect them from the power supplies.

The PSL enclosure doors on the north side will have to be removed some times to move exiting and entering ports.

 

  3394   Tue Aug 10 17:21:48 2010 steveUpdateGeneralPSL optical table is at 30" height

Mike Gerfen, Koji and Steve,

 

Our old ( 6 x 10 x 1 ) ft Newport optical table will have the same height as the neighboring AP table when this job is finished.

Today's work was to elevate the optical table ~ 2400 lbs to 30" clearance to create a workable space below.

 

Atm1,  enclosure frame was raised by 6"

Atm2,  2 pellet jacks and 4x4 technology in the work.

Atm3,  ready for drill and tap with jig plate in place, note 4 Al legs 8" OD. 1/4" wall safely supporting the load

Atm4,  showing clamps that holding 1/2" plywood with jigs

Atm5, We removed the 4 old legs: 6" OD steel, 1/4" wall and 10" high after they were unloaded.

Attachment 1: P1060586.JPG
P1060586.JPG
Attachment 2: P1060583.JPG
P1060583.JPG
Attachment 3: P1060591.JPG
P1060591.JPG
Attachment 4: P1060593.JPG
P1060593.JPG
Attachment 5: P1060597.JPG
P1060597.JPG
  3404   Thu Aug 12 10:56:31 2010 steveUpdateEnvironment dusty floor work in progres

I powered down 1Y1 and 1Y2 instrument racks of MC and RF-systems this morning.

Both racks, SP table, clean tools-parts boxes and MC2 area are also covered with plastics.

Bertin Bros. Construction, Inc is working on the floor preparation. Their head man is Robby Bertin, cell 626. 831.2264

Today's job:

remove tiles, clean off tile glue, drill for ribbed  steel bars, rough clean- surface for good bounding. paint floor with bounding agent

  3410   Thu Aug 12 16:18:46 2010 steveUpdateEnvironmenttiles and adhesive removed

Quote:

I powered down 1Y1 and 1Y2 instrument racks of MC and RF-systems this morning.

Both racks, SP table, clean tools-parts boxes and MC2 area are also covered with plastics.

Bertin Bros. Construction, Inc is working on the floor preparation. Their head man is Robby Bertin, cell 626. 831.2264

Today's job:

remove tiles, clean off tile glue, drill for ribbed  steel bars, rough clean- surface for good bounding. paint floor with bounding agent

Tiles and adhesive removed. There were no dust storms created. Solvent paint- removal made the hole IFO -lab smell like the paint shop.

The south door is open with a fan blowing air inside. The north-west door is open through control room to outside to let air rinse the drying

paint-removal. Koji is  taking lunch break while test riding our new PSL table legs.

Attachment 1: P1060604.JPG
P1060604.JPG
Attachment 2: P1060606.JPG
P1060606.JPG
Attachment 3: P1060603.JPG
P1060603.JPG
Attachment 4: P1060610.JPG
P1060610.JPG
Attachment 5: DSC_2388.JPG
DSC_2388.JPG
  3422   Fri Aug 13 18:32:48 2010 steveUpdatePEM new legs attached to optical table

Koji, Rana and Steve

 

The floor preparation continued today. The really messy part of drilling and jack-hammering the concrete were done in controlled manner.

Particle counts peaked at 106K of 0.3 micron and 13 K of 1.0 micron particles/ cfmin at the top of SP table.

Legs were installed with the help of Koji and strongman Rana. Professor Rana was very useful lifting the 85 lbs legs. 

 

Atm1, Drilling holes for ribbed bar reinforcement of concrete

Atm2, Koji and Rana are playing hide and seek while installing legs

Atm3-4, 6 Rigid tripod legs attached by 6x3 of 1/4-20x 7/8 screws. The top plates of the legs were torqued to 108 ft/lbs by Rana

Attachment 1: P1060612.JPG
P1060612.JPG
Attachment 2: P1060626.JPG
P1060626.JPG
Attachment 3: P1060631.JPG
P1060631.JPG
Attachment 4: P1060636.JPG
P1060636.JPG
  3430   Tue Aug 17 14:09:15 2010 steveUpdatePEMPSL optical table schedule

Tuesday, 17 August : fill tunnel, set table height, level table and balance load

Wednesday : grout tripod legs and leave it alone

Thursday : built  guide-form for concrete

Friday :  pour concrete

Monday, 23 August : remove guide forms and clean up

  3435   Wed Aug 18 16:42:14 2010 steveUpdatePEMPSL optical table legs load balanced

 

 Rana, Koji, Alberto and Steve, Tuesday afternoon

 

Atm3, Part of the tunnel under the table was filled with quick drying concrete this morning  to give solid support for tripod legs.

          PVC tube 6 " ID with TEE will able us to connect AP table, PSL table and Control room if needed

Atm4, Table height set to equal AP at  ~32.75 " on copper plates using 5/8-11 x 4.5" set screw-bolt in tripod foot

           Rough leveling was done by 4 individual levels at the four corners with 9" long Stanley cast aluminum levels.

          Load balancing of the total weight  ~ 3000 lbs over  6 legs x3 = ~170 lbs on each jack screw with Snap-On torque wrench at 140 lbs/ft

Atm1, Three crew members at work. Prof. Rana's calibrated right hand was used at jack screws where insufficient space was available for socket head wrench.

Atm2, Table is ready for no shrink grouting now.

         

 

 

 

 

Attachment 1: P1060671.JPG
P1060671.JPG
Attachment 2: P1060674.JPG
P1060674.JPG
Attachment 3: P1060670.JPG
P1060670.JPG
Attachment 4: P1060676.JPG
P1060676.JPG
  3444   Thu Aug 19 16:03:59 2010 steveUpdatePEMgrouting of PSL tripod legs

The 10' x 6' optical table is seating on 6 tripods. Each tripod leg has 3 feet. They are supported by jack screws against copper plates on the concrete floor.                            These set screws allowed us to set the height,  level and distribute the load of the table.

To lock this position of the table grouting is used around the jack screws and between the concrete floor and the tripod feet.

Once the grout set the load will be carried by the hole feet  of 4" x 3.25" x3 = 39 sq inches per tripod leg

 

These ~4" thick grouted islands of 8-9" OD will be covered by 4" concrete. The area between the legs will be filled with 8" thick concrete.

http://www.fivestarproducts.com/techinfo/GroutHandbook.pdf

 

Atm1, http://www.fivestarproducts.com/cementgrouts/specsheets/grout_ss.pdf

         Cement based grout, early height change 0 - 4%, hardened height change 0 - 0.3%

Atm2-3,  pouring grout

Atm4,  south west leg is done

 

Tomorrow: setting up ribbed bars, building frame to hold concrete and pour concrete

Attachment 1: P1060687.JPG
P1060687.JPG
Attachment 2: P1060681.JPG
P1060681.JPG
Attachment 3: P1060686.JPG
P1060686.JPG
Attachment 4: P1060696.JPG
P1060696.JPG
  3448   Fri Aug 20 15:49:14 2010 steveUpdatePEMgrouting is done

The preparation for pouring concrete is continuing. The grout forms were removed. Half inch ribbed steel bars were epoxied into our 4" thick floor.

The concrete holding sides- forms are cut to size. They will be installed on Monday morning and pouring concrete should follow.

We can be planning for cleaning up on Tuesday

 

Atm1, epoxy used bars

Atm2, south west tripod feet grouted

Atm3, ribbed bars are getting ready

Attachment 1: P1060699.JPG
P1060699.JPG
Attachment 2: P1060700.JPG
P1060700.JPG
Attachment 3: P1060704.JPG
P1060704.JPG
  3449   Fri Aug 20 16:17:35 2010 steveUpdatePEMPEM-count channels are not working

C1: PEM-count channels are dead since August 12, 2010

  3455   Mon Aug 23 08:28:27 2010 steveUpdateSUSETMY sus damping restored
ELOG V3.1.3-