40m QIL Cryo_Lab CTN SUS_Lab CAML OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 328 of 355  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thu May 15 10:40:21 2008, steve, HowTo, General, Lisa Goggin, PhD lisa.JPG
Lisa Goggin successfully defended her thesis on May, 13 2008

"A Search For Gravitational Waves from Perturbed Black Hole Ringdowns in Ligo Data"
Entry  Mon May 19 11:49:57 2008, steve, Update, SUS, etmy oplev laser replaced 
The 9 years old Uniphase HeNe was replaced by a new JDSU 1103P
Power output ~3.5 mW, reflected light back on qpd ~140 microW, 12,800 counts
Andrey will get the ~2.5 mm od spot on the qpd smaller by replacing
Entry  Tue May 20 09:28:42 2008, steve, Bureaucracy, SAFETY, safety traning for 40m 
Tara Chalernsongsak, new gradstudent for K. Libbrecht was introduced to the basics of the 40m operations.
Entry  Thu May 22 11:21:45 2008, steve, Bureaucracy, SAFETY, early surf sudent 
Caltech under grad Eric Mintun received the 40m safety training.
Now he has to read and sign SOP of laser and ifo.
He'll be working with GigE cameras  with Joe
Entry  Wed May 28 14:19:47 2008, steve, Update, PSL, kaleidoscope of psl pslscat.pngpslscat2.png2GigEs.pngperwash.pngetmydisarray.png
atm 1: scattering psl table optics from the top of the output periscope f4, 60s @MOPA 3 W
atm 2: scattering psl table optics from the top of the output periscope f4, 20s
atm 3: competing GigE cameras on the north end of psl table
Entry  Thu May 29 16:32:09 2008, steve, Update, SUS, etmy oplev is back P1020417.pngP1020420.png
I relayed the optics for ETMY-oplev as shown in pictures below.
The reflected beam goes directly to the qpd
Entry  Thu May 29 16:49:49 2008, steve, Bureaucracy, Photos, Yoichi has arrived yoichi.pngbobsn.png
Yoichi had his first 40m meeting. We welcomed him and Tobin, who is visiting, by sugar napoleons that 
Bob made. 
Entry  Wed Jun 4 10:18:52 2008, steve, Update, PSL, wedged SS beam trap trap1.pngtrap2.png
I moved the SS trap over to the psl table.
Texas super # 8 was used from the large shipment.
TXs#8 scattering measured as before, meaning the polishing is good.
Entry  Fri Jun 6 15:56:00 2008, steve, Bureaucracy, SAFETY, Yoichi received safety training 
Yoichi Aso received 40m specific safety training.
Entry  Fri Jun 6 16:10:51 2008, steve, Update, PSL, HEPA filters are running at 100% 
The psl HEPA filters were turned up to run at 100% to accommodate beam trap work on Tuesday, June 3, 2008
Entry  Tue Jun 10 08:37:18 2008, steve, Update, PSL, beam trap is being tested trapss3w.png
High power beam trap is being tested just west of FSS area on psl enclosure.

When the pmc is operating at low power that means that the rest of the 3W is going into the 
Entry  Wed Jun 11 11:45:25 2008, steve, Update, PSL, ss trap works P1020534.pngP1020533.png
The trap works well at 3 W level.  No back reflected beam coming out of the trap on low power
sensing card level. The back scattering was not measured. The trap is insensitive to small pointing variations. 
The SS surface did not show any visible degradation after 16 hrs of 3w exposure at elliptical beam size  4x8 mm 
Entry  Fri Jun 20 17:42:48 2008, steve, Update, PSL, SS trap scattering compared to black glass trap cSSt_1.pngcSSt_2.pngscatset_61908.pngcSSt&wBGt.pngcSStbeam.png
Circular SS304 trap was compared to wedged black glass trap.

The measurement  set up of entry 529 was changed to define polarization.
Entry  Fri Jun 27 09:20:15 2008, steve, Frogs, PEM, dust particle count is up & alarm handler is on dust3y.jpg
This 3 years plot show the trend of seasons.
When outside air quality goes bad ( 0.5 micron > 1 million ) the lab follows.
I will demonstrate this effect with a 4th of July fire works calibration.
Entry  Mon Jun 30 08:59:23 2008, steve, Update, IOO, IOO-MC_DEMOD_LO is low demlo.jpg_____
The alarm handler is beeping relentlessly: asking for help in high partical count and low demod signal
Entry  Tue Jul 1 09:26:33 2008, steve, Update, Computers, RFM network is down 
 
Entry  Tue Jul 1 10:15:22 2008, steve, Update, PSL, eventfull two days 2d.jpg
The laser recovered from a short temp rise. The MZ was aligned and realigned. The suspentions were kicked up accidentally. 
Now the computers are down. 
    Reply  Wed Jul 2 15:14:42 2008, steve, Update, General, added beam traps 
I placed baked razor beam trap after INJ_SM1 and flipper in the injection path on the AP table

[quote]I have constructed the beam injection optics for the abs length measurement.
Entry  Mon Jul 7 16:30:08 2008, steve, Update, PSL, PSL-PEM 16 days trend pempsl16d.jpg
This morning the laser head temp was up to 20.3C  because the laser chiller was overflowing.
I removed 700 cc water. 
Entry  Tue Jul 8 08:16:56 2008, steve, Update, PSL, PMC problem pmc.jpg
The PMC is unhappy. PMC auto locker is not working.
DC output slider adjust has to be moved from rail to rail before it locks.
Entry  Tue Jul 8 10:20:10 2008, steve, Update, PEM, HEPA turned on hepa.jpg
It is specially important to run the PSL-HEPA filters when inside counts is peaking at 30,000 counts

There is a small label at the hepa on/off switch:
Entry  Wed Jul 9 15:04:22 2008, steve, Metaphysics, Photos, SURFs helping hands surfjob.png
Surf students are helping out with baffle cleaning.
Entry  Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up pmc4d.jpg
Morning alarms:

PMC high voltage is railing, it's auto locker is frosen
Entry  Tue Jul 15 09:47:09 2008, steve, Update, PEM, lab temps and particles temps24d.jpg
All air condtion units were serviced last Friday.
AC filters are trying to control our particle counts but they have no capacity to match bad Pasadena conditions.
IFO room filters at CES were really clean.
Entry  Tue Jul 15 10:24:57 2008, steve, Update, PSL, PMC temp & pzt voltage pmctemp.jpg
The PMC pzt HV was happy with no HEPA temp stability.
Can we thermally insulate the pmc ?
Entry  Wed Jul 16 09:27:17 2008, steve, Update, ALARM, PSL-FSS_RMTEMP alarm is false frmtemp2y.jpg
Morning alarm sound is good for people who does not drink coffee.
Our 40m alarm is on every morning.
Those whom are not here in the morning thinks that this beeping sound is inspirational.
Entry  Thu Jul 17 08:30:15 2008, steve, Update, PSL, PMC relocked manually pmc4d.jpg
The PMC pzt HV and the servo gain adj. are railing at max this morning

Why is it on the decreasing side of FSS_RTTEMP slope?
Entry  Mon Jul 21 10:00:42 2008, steve, Update, PEM, ifo room temp temp5y.jpg
Five years of temp trend with 5 C fluctuation. The campus chilled water supply was upgraded ~ 1 year ago.

I requested our thermostats to be calibrated.
Entry  Mon Jul 21 15:52:22 2008, steve, Bureaucracy, SAFETY, fire alarms test 
The fire alarm test and evacuation drill was successfully completed at 13:45 Wednesday, July 16, 2008

Everybody was on time for the 40m meeting.
Entry  Tue Jul 22 09:24:17 2008, steve, Update, PSL, laser power power120d.jpg
Laser power reality of 120 days
Entry  Tue Jul 22 16:50:09 2008, steve, Metaphysics, Environment, professorial clean up of work bench ranaclup.pngcleanup2.png
Atm1: is showing the spiritual satisfaction after work bench clean up by the professor himself.

Atm2: some items are still waiting to be placed back to their location 
Entry  Mon Aug 4 12:12:20 2008, steve, Configuration, VAC, the ifo is at atm vent3h.jpgUntitled.png
The 40m vac envelope was vented this morning.
P1 is at 760 Torr
Entry  Tue Aug 5 10:23:00 2008, steve, Update, SUS, earthquake and venting effects eq4h.jpgvent4hr.jpg
atm 1, EQ
atm 2, vent 7 days later: venting kicks optic into place to be free,
       PRM: LR magnet gets pushed in and it is stocked, side in free
Entry  Wed Aug 13 17:00:59 2008, steve, Configuration, SUS, BS sat amp removed 
The PRM sat amp is broken. Ben is working on it.
The BS sat amp was removed from the BS sus and it is used with the PRM in
order to damp it for wire stand-off alignment.  
Entry  Thu Aug 14 10:26:45 2008, steve, HowTo, SUS, sus cable pin cheater for out of vac damping suscabmin.png
The 40m D25 vacuum feed troughs give you a mirror image pin count.

Sus damping outside of the vacuum envelope require this cheater cable where
Entry  Thu Aug 14 11:39:06 2008, steve, Update, PEM, particle counter is out of order 
The 40m ifo paricle counter sensor failed last night.
Entry  Fri Aug 15 14:12:31 2008, steve, Bureaucracy, SAFETY, safety glasses required  
The MOPA shutter is opened,
the PSL enclosure is switched to bypass mode,
manual block removed from PMC,
Entry  Fri Aug 15 19:32:49 2008, steve, Configuration, VAC, pumpdown complete pdprm.jpg
I have just reached vacuum normal. The maglev peaked at 49.8C body temp with aux fan on at 3.2 Torr
cc1 1e-4Torr
Entry  Mon Aug 18 09:19:55 2008, steve, Summary, VAC, 11 days at atm ventprm.jpg
It took 11 days to fix earth quake triggered sus problems of ITMX, SRM and PRM
Only ITMX north and BSC north vac doors were removed.
Entry  Thu Aug 21 10:24:20 2008, steve, Configuration, SAFETY, laser safe mode condition 
The MOPA and PSL shutters are closed.
Manual beam blocks are in place.
Enclosure interlock is enabled.
Entry  Thu Aug 21 16:28:59 2008, steve, Configuration, SAFETY, safety glasses required  
I just opened the MOPA shutter so PA is warming up.

High power beam path is cleared and laser safety glasses required. 
Entry  Fri Aug 22 16:06:29 2008, steve, Update, PEM, particle counter replaced, flowbenches & HEPAs checked 
MetOne #2 counter was swapped in (on the top of IOC, facing SW direction, at ~75 deg upwards)
with channel one size 0.3 micron and channel two size 1.0 micron.
Sampling time was reduced from 60s to 6 sec at 0.1 cf/min at 25 min rate.
Entry  Mon Aug 25 10:23:53 2008, steve, HowTo, General, cable killer cablkill.pngcablkll2.png
Rack 1Y7 double violation:

BNC cables left to be jammed by door
Entry  Mon Aug 25 10:51:06 2008, steve, Update, PSL, psl headtemp is coming down ht4dw.jpg
The laser water cooler was overflowing this morning.
I removed 500 cc water from the chiller.
Entry  Tue Aug 26 09:58:59 2008, steve, Omnistructure, COC, ETMX is #03 etmx-d40posg_012.jpgetmx03.jpg
This is the picture of ETMX from the upper south west viewport
Entry  Tue Aug 26 15:06:16 2008, steve, Configuration, VAC, rga scan RGA-0808260125.png
Pumpdown 66 PRM-maglev vac normal -day 11
short form: pd66PRM-m-d11
Entry  Fri Aug 29 15:01:45 2008, steve, Update, PSL, MOPA_HTEMP in increasing htcl.jpg
The laser chiller temp is 21.9C ( it should be 20.0C )
Control room temp 73F ok, no obvious block
Entry  Tue Sep 2 10:09:03 2008, steve, Update, PSL, head temp is cooling down 
The chiller was over flowing this morning.
800 cc of water was removed.
PSL-126MOPA_HTEMP peaked at 20.7 C (normal is 18.7 C)
Entry  Fri Sep 5 08:34:03 2008, steve, Update, PSL, MZ locked mzhv.jpg
The MC is happy.
The MZ can be locked if you move the slider by hand.
Entry  Fri Sep 5 10:36:34 2008, steve, Update, PEM, thermostate setting changed 
Some one changed the thermostat (old control room ) setting behind 1Y6 from 73 to 79F
It should be in the elog.
The temp changed from freezing 20 to sunny 25 C 
ELOG V3.1.3-