40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 328 of 339  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
    Reply  Wed Jul 27 11:40:48 2016, steve, Summary, SUS, oplev laser summary updated 
    Reply  Fri Sep 16 14:15:28 2016, steve, Update, PEM, partical counts 80days.png
    Reply  Wed Oct 12 15:01:22 2016, steve, Update, SUS, SOS ITM baffles plates are ready baffle7x9_1.5.jpgbaffle_holder.jpgbaffle_top_view.jpg
    Reply  Fri Dec 2 10:57:08 2016, steve, Update, PEM, door seal replaced 1_year_PEM.png
    Reply  Wed Jan 25 10:46:58 2017, steve, Summary, SUS, oplev laser summary updated oplev_sums.png
    Reply  Wed Feb 8 10:16:39 2017, steve, Update, SUS, clipping ITMX oplev ITMX_oplev_clipping.jpgITMX_clipping.jpg
    Reply  Fri Feb 17 10:56:12 2017, steve, Update, PEM, particle counter moved into PSL enclousure from_here.jpgto_here.jpgPSL_particles.png
    Reply  Tue Feb 21 10:08:35 2017, steve, Update, PEM, noisy morning outside_activity.png
    Reply  Wed Feb 22 08:54:17 2017, steve, Update, PEM, PSL enclousure particle count dusty__PSL.png
    Reply  Tue Feb 28 08:04:48 2017, steve, Update, PEM, ETMX damping recovered ETMX.png
    Reply  Mon Mar 20 17:12:08 2017, steve, Update, PEM, particle counter inside of PSL enclousure enclousure_partical_count.png
Entry  Thu Aug 10 09:10:55 2017, steve, Update, General, dataviewer is recovering 7dm.png
    Reply  Mon Aug 28 10:51:21 2017, steve, Update, SUS, ETMX damping recovered ETMX_restored.png
    Reply  Wed Mar 21 10:00:35 2018, steve, Update, General, projector light bulb replaced 
    Reply  Fri May 18 07:41:01 2018, steve, Update, SUS, clipping ITMX oplev 
    Reply  Tue Jul 10 14:20:09 2018, steve, Update, General, projector light bulb replaced 
    Reply  Tue Jul 12 17:30:24 2011, steve,, Update, SUS, BS oplev spectra BS_oplev.jpg
    Reply  Thu Jul 14 09:38:50 2011, steve,, Update, SUS, BS oplev spectra BS_oplev.jpg
    Reply  Thu Jul 14 15:27:08 2011, steve,, Update, SUS, SUS oplev spectras 7x
Entry  Thu Sep 3 10:19:35 2009, steve, alberto, Update, PEM, particle counts and burning hillsides fire6d.jpg40mgarden.JPG40mgarden2.JPGRBLOG-FIRE-SKY.JPG
Entry  Wed Jul 6 16:44:37 2011, steve, kiwamu, Update, SUS, BS oplev spectra BS.jpg
Entry  Fri Sep 30 18:35:42 2011, steve, kiwamu, Update, VAC, vacuum set for poweroutage prepforpoweroutage.png
Entry  Tue Jun 29 17:10:49 2010, steve, rana, Update, VAC, slow pumpdown started 
    Reply  Tue Jun 29 23:49:18 2010, steve, rana, Update, VAC, slow pumpdown started Untitled.png
Entry  Wed Jul 7 17:05:30 2010, steve, rana, Update, SAFETY, Summary of Crane Damage/Malfunction 10x
    Reply  Fri Aug 7 16:11:11 2009, steve, rob, Configuration, VAC, IFO pressure rose to 2.3 mTorr 
Entry  Tue Feb 15 11:57:06 2011, steve, valera, Configuration, PSL, PMC swap P1070421.JPGP1070423.JPG
    Reply  Wed Jun 30 15:24:04 2010, steve,kiwamu, Update, VAC, slow pumpdown copmlete slowpd.jpgbutterfly.JPG
Entry  Wed Jun 18 16:37:54 2008, steve,rana, Update, SAFETY, CO2 test in the east arm co2.png
Entry  Fri Jun 20 08:30:27 2008, stiv, Update, Photos, 40m summer line up 2008 P1020559.pngP1020560.png
    Reply  Fri Jun 22 15:22:39 2018, sudo, Update, CDS, DTT working 
Entry  Wed Mar 2 22:57:57 2011, suresh, Summary, General, Stuff from LLO eLIGO_items_from_LLO_for_Caltech.xls
    Reply  Mon Mar 7 17:58:14 2011, suresh, Summary, General, Stuff from LLO eLIGO_items_from_LLO_for_Caltech_Sheet1.pdf
Entry  Wed Apr 20 22:29:07 2011, suresh, Update, RF System, Plan for LSC rack 1Y2_Rack_Layout.png
Entry  Wed Jul 20 17:43:33 2011, suresh, Update, Computers, restarted the frame builder 
Entry  Thu Jul 21 16:05:15 2011, suresh, Update, IOO, PSL beam into MC realigned 
Entry  Sat Nov 26 07:22:20 2011, suresh, Update, Computers,  
    Reply  Thu Mar 22 17:41:15 2012, suresh, Update, CDS, c1scx and c1scy not properly running 
Entry  Mon Jan 28 21:36:44 2013, tall guy, Frogs, General, small people on notice 
Entry  Thu Oct 28 19:10:26 2010, tara, Update, Electronics, TTFSS for 40m 
    Reply  Mon Apr 11 20:03:05 2011, tara, Update, Electronics, TTFSS for 40m 
Entry  Tue Apr 10 11:08:29 2012, tara, Update, PSL, curved mirror behind AOM removed 
Entry  Wed Jan 16 10:57:37 2013, tara, Summary, IOO, Noise budget for MC mc_nb_TN.pngmc_nb_TN.pngmc_nb_TN.figMC_nb.m.zipmc_nb_TN_2013_01_18.png
Entry  Wed Jul 7 00:15:29 2010, tara,Rana, Summary, PSL, power spectral density from RefCav transmitted beam  RIN_rftrans.pngtara.png
Entry  Tue Jul 13 21:04:49 2010, tara,rana, Summary, PSL, Transfer function of FSS servo TF_FSS_ser.png
Entry  Mon Sep 13 22:51:07 2010, tara,valera, Configuration, PSL, beam scan for RCAV 2010_09_10_w.mat
Entry  Thu Jul 26 01:52:01 2018, terra, Update, Thermal Compensation, heater work update OpLev_thermal_drift.pdfhotColdAll.pdf
Entry  Sat Jul 28 00:45:11 2018, terra, sandrine, Summary, Thermal Compensation, Heater measurements overview 7x
Entry  Sun Feb 24 10:51:58 2008, tf, Frogs, Environment, 40m in phdcomics? 
Entry  Mon Oct 29 23:25:42 2007, tobin, Software Installation, CDS, frames mounted 
ELOG V3.1.3-