40m
QIL
Cryo_Lab
CTN
SUS_Lab
CAML
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log, Page 327 of 350 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Fri Oct 23 09:13:45 2009, steve, Summary, VAC, RGA scan 
|
Mon Oct 26 15:40:01 2009, steve, Update, PSL, laser power is down
|
Wed Oct 28 09:12:18 2009, steve, Update, PSL, PMC power on the rise?
|
Wed Oct 28 14:39:10 2009, steve, Update, PEM, after the tour of the 40m
|
Fri Oct 30 09:24:45 2009, steve, HowTo, MOPA, how to squeeze more out of little
|
Fri Nov 6 07:55:59 2009, steve, Update, Computers, RFMnetwork is down
|
Fri Nov 6 09:17:53 2009, steve, Omnistructure, PEM, PSL HEPAs turned on
|
Mon Nov 9 08:43:16 2009, steve, Update, SUS, MC2 damping restored
|
Wed Nov 11 09:48:04 2009, steve, Update, IOO, where is IOO-RFAMPD_DCMON ?
|
Thu Nov 12 09:43:29 2009, steve, Update, PEM, construction has started at CES  
|
Mon Nov 16 09:37:41 2009, steve, Update, PEM, construction is getting noisier  
|
Thu Nov 19 09:25:19 2009, steve, Update, MOPA, water was added to the laser chiller
|
Thu Nov 19 09:48:54 2009, steve, Update, PEM, construction effect
|
Mon Nov 23 10:11:03 2009, steve, Update, PEM, long term temp fluctuation of the 40m lab
|
Mon Nov 23 11:03:00 2009, steve, Update, SUS, jackhammer special well under control 
|
Mon Nov 23 16:28:12 2009, steve, Summary, Cameras, Video swicher options
|
Wed Dec 9 09:07:32 2009, steve, Update, PEM, high seismic activity   
|
Thu Dec 10 08:43:25 2009, steve, Frogs, Environment, diesel fumes are less
|
Thu Dec 10 16:51:35 2009, steve, Update, VAC, pumpdown will start tomorrow morning
|
Fri Dec 11 08:35:04 2009, steve, Configuration, VAC, pumpdown has started
|
Fri Dec 11 15:21:40 2009, steve, Configuration, VAC, pumpdown#67 is completed 
|
Mon Dec 14 11:21:23 2009, steve, Omnistructure, Environment, Ants in the coffee maker
|
Mon Dec 21 08:16:54 2009, steve, Metaphysics, PEM, jackhammering next door
|
Tue Dec 22 10:04:41 2009, steve, Omnistructure, PEM, miracle in the 40m
|
Wed Dec 30 09:57:53 2009, steve, Update, PSL, thirsty water chiller
|
Wed Jan 6 16:48:52 2010, steve, Bureaucracy, SAFETY, copied NPRO key
|
Fri Jan 8 18:20:12 2010, steve, Metaphysics, Treasure, Rob now can concentrate on his thesis  
|
Tue Jan 12 09:14:52 2010, steve, Summary, General, Scattering Measurements of 35W Beam Dumps
|
Tue Jan 12 14:28:01 2010, steve, Summary, Environment, lab temp of 7 years
|
Mon Feb 1 18:33:10 2010, steve, Update, MOPA, Ve half the lazer! 
|
Tue Feb 2 16:10:09 2010, steve, Update, PEM, construction progress next door    
|
Wed Feb 3 07:57:01 2010, steve, Update, PSL, PMC transmission is low
|
Wed Feb 3 11:13:15 2010, steve, Configuration, General, planed power outage for Sat. Feb 20
|
Fri Feb 5 11:01:49 2010, steve, Configuration, VAC, slow pumpdown valve
|
Wed Feb 10 16:27:47 2010, steve, Configuration, General, IFO beam heights
|
Thu Feb 11 15:53:59 2010, steve, Configuration, VAC, PSL output shutter is closed
|
Thu Feb 11 18:53:57 2010, steve, Configuration, VAC, VAC NORMAL is back
|
Thu Feb 18 10:10:43 2010, steve, Configuration, General, 480 V AC power turned off
|
Tue Feb 23 14:56:24 2010, steve, Update, General, ETMX optical table mass
|
Tue Feb 23 16:20:44 2010, steve, Configuration, VAC, outgassing + leak
|
Fri Feb 26 15:32:13 2010, steve, Configuration, VAC, preparation for power outage: vacuum all off
|
Mon Mar 1 08:49:37 2010, steve, Bureaucracy, SAFETY, safety audit
|
Mon Mar 1 11:21:50 2010, steve, Configuration, VAC, vacuum contoller is back to normal
|
Fri Mar 5 11:21:18 2010, steve, Update, SUS, used OSEMs are magnetic
|
Tue Mar 9 09:04:20 2010, steve, Update, PEM, keep vacuum chamber closed
|
Thu Mar 11 15:24:51 2010, steve, Metaphysics, Environment, IFO was well protected
|
Fri Mar 12 17:08:22 2010, steve, Configuration, VAC, bg-RGAscan at d18
|
Mon Mar 15 09:43:47 2010, steve, Update, PEM, more sandblasting today
|
Mon Mar 15 16:39:36 2010, steve, Update, PEM, Guralp2 centered
|
Tue Mar 16 09:37:30 2010, steve, Update, SUS, eq 4.4 seen by oplevs and osems  
|
|