Thu Oct 18 14:52:35 2007, rana, Routine, ASC, test
| +
Fri Jan 27 17:49:41 2017, jamie, Update, CDS, test of new daqd code on fb1
| +
Fri Jan 27 20:52:36 2017, gautam, Update, CDS, test of new daqd code on fb1
| +
Sat Jan 28 12:05:57 2017, jamie, Update, CDS, test of new daqd code on fb1
|
Thu Sep 30 11:07:20 2010, josephb, alex, Update, CDS, test points starting to work
|
Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in
| +
Thu Mar 15 17:33:56 2018, Kira, Update, PEM, test setup
| +
Tue Mar 20 16:56:01 2018, Kira, Update, PEM, test setup 
| +
Tue Mar 20 19:48:10 2018, gautam, Update, PEM, test setup
| +
Fri Mar 23 12:00:20 2018, rana, Update, PEM, test setup
| +
Fri Mar 23 12:45:08 2018, Kira, Update, PEM, test setup
| +
Thu May 17 15:38:19 2018, Kira, Update, PEM, test setup with seismometer   
| +
Fri May 18 14:33:34 2018, Kira, Update, PEM, test setup with seismometer
| +
Mon May 21 10:15:35 2018, gautam, Update, PEM, test setup with seismometer
| +
Mon May 21 14:17:28 2018, Kira, Update, PEM, test setup with seismometer
| +
Tue May 22 14:49:03 2018, Kira, Update, PEM, test setup with seismometer
| +
Wed May 23 14:50:33 2018, Kira, Update, PEM, test setup with seismometer 
|
Fri Sep 24 00:56:35 2010, koji, tara, Update, Electronics, testing TTFSS
| +
Fri Sep 24 23:47:10 2010, koji, tara, Update, Electronics, testing TTFSS
| +
Sat Sep 25 19:01:13 2010, Koji, Update, Electronics, testing TTFSS
|
Tue Aug 30 11:42:29 2011, jamie, Update, CDS, testpoint.par file found to be completely empty
|
Thu Jun 21 09:01:18 2012, steve, Update, STACIS, the resurrection of STACIS -surf
|
Tue Oct 12 15:51:18 2010, yuta, Bureaucracy, SAFETY, the 40m squad received safety training from Peter
|
Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up
|
Mon Sep 13 21:52:53 2010, kiwamu, Update, Green Locking, the X end laser is ON
| +
Tue Aug 30 09:51:37 2016, Steve, Update, SUS, the chamber HEPA tents are back 
| +
Wed Aug 31 23:01:02 2016, gautam, Update, SUS, the chamber HEPA tents are back
|
Thu Dec 23 08:54:32 2010, Suresh, Update, elog, the delhi univ syndrome
|
Mon Aug 4 12:12:20 2008, steve, Configuration, VAC, the ifo is at atm 
| +
Mon Aug 22 16:33:32 2016, Steve, Update, PEM, the lab temp is up
| +
Mon Aug 22 18:35:16 2016, Praful, Update, PEM, the lab temp is up  
| +
Fri Oct 7 15:36:03 2016, Steve, Update, PEM, the lab temp is up 
|
Fri Nov 2 08:59:30 2007, steve, Bureaucracy, SAFETY, the laser is ON
|
Thu Feb 21 09:56:26 2008, steve, Update, PSL, the laser is back
|
Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back
|
Wed Feb 20 16:24:37 2008, steve, Update, PSL, the laser is recovering slowly
|
Thu Jan 24 11:52:56 2008, steve, Update, PEM, the mud is cleaned up & MOPA shutter is opened
| +
Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day
|
Mon Sep 8 10:57:49 2008, steve, Update, IOO, the psl and mc are back to normal  
| +
Wed Jan 10 09:49:28 2018, Steve, Update, PEM, the rat is back
|
Mon Oct 29 09:16:31 2007, steve, Routine, VAC, the rga is back
|
Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending
| +
Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster
| +
Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr 
| +
Tue Jul 23 14:00:03 2013, Steve, Update, VAC, the vent is completed  
| +
Wed Feb 24 09:06:25 2016, Steve, Update, Treasure, the way it happened
| +
Thu Apr 16 16:37:42 2009, Alberto, Update, Auxiliary locking, the zipper
| +
Thu Apr 16 17:19:44 2009, Alberto, Update, Auxiliary locking, the zipper 
|
Thu Jul 11 09:24:03 2013, Steve, Update, General, there should be nothing left on optable tops
| +
Tue Feb 16 09:13:39 2016, Steve, Update, General, there was a power outage & EQ
|
|