40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 327 of 335  Not logged in ELOG logo
Entry  Thu Oct 18 14:52:35 2007, rana, Routine, ASC, test 
Entry  Fri Jan 27 17:49:41 2017, jamie, Update, CDS, test of new daqd code on fb1 
   +  Reply  Fri Jan 27 20:52:36 2017, gautam, Update, CDS, test of new daqd code on fb1 DCerrors.png
   +  Reply  Sat Jan 28 12:05:57 2017, jamie, Update, CDS, test of new daqd code on fb1 
Entry  Thu Sep 30 11:07:20 2010, josephb, alex, Update, CDS, test points starting to work 
Entry  Fri Nov 20 11:14:22 2009, josephb, alex, Configuration, Computers, test points working on megatron and we may have filters with switch outputs built in 
   +  Reply  Thu Mar 15 17:33:56 2018, Kira, Update, PEM, test setup IMG_20180315_172512.jpg
   +  Reply  Tue Mar 20 16:56:01 2018, Kira, Update, PEM, test setup IMG_20180320_154516.jpgIMG_20180320_145957.jpg
   +  Reply  Tue Mar 20 19:48:10 2018, gautam, Update, PEM, test setup 
   +  Reply  Fri Mar 23 12:00:20 2018, rana, Update, PEM, test setup 
   +  Reply  Fri Mar 23 12:45:08 2018, Kira, Update, PEM, test setup seis_fit.png
   +  Reply  Thu May 17 15:38:19 2018, Kira, Update, PEM, test setup with seismometer IMG_20180517_144420.jpgIMG_20180517_145754.jpgIMG_20180517_151956.jpgIMG_20180517_145121.jpg
   +  Reply  Fri May 18 14:33:34 2018, Kira, Update, PEM, test setup with seismometer seis_temp_can_on.png
   +  Reply  Mon May 21 10:15:35 2018, gautam, Update, PEM, test setup with seismometer 
   +  Reply  Mon May 21 14:17:28 2018, Kira, Update, PEM, test setup with seismometer seis-temp.png
   +  Reply  Tue May 22 14:49:03 2018, Kira, Update, PEM, test setup with seismometer seis-temp-2.png
   +  Reply  Wed May 23 14:50:33 2018, Kira, Update, PEM, test setup with seismometer seis-temp-3.pngseis-temp-full-2.png
Entry  Fri Sep 24 00:56:35 2010, koji, tara, Update, Electronics, testing TTFSS 
Entry  Fri Sep 24 23:47:10 2010, koji, tara, Update, Electronics, testing TTFSS 
   +  Reply  Sat Sep 25 19:01:13 2010, Koji, Update, Electronics, testing TTFSS 
Entry  Tue Aug 30 11:42:29 2011, jamie, Update, CDS, testpoint.par file found to be completely empty 
Entry  Thu Jun 21 09:01:18 2012, steve, Update, STACIS, the resurrection of STACIS -surf IMG_1364.JPG
Entry  Tue Oct 12 15:51:18 2010, yuta, Bureaucracy, SAFETY, the 40m squad received safety training from Peter 
Entry  Fri Jul 11 09:29:02 2008, steve, Update, PSL, the PMC still hangs up pmc4d.jpg
Entry  Mon Sep 13 21:52:53 2010, kiwamu, Update, Green Locking, the X end laser is ON 
   +  Reply  Tue Aug 30 09:51:37 2016, Steve, Update, SUS, the chamber HEPA tents are back ETMYtentHEPA.jpgvented_for_60_days.png
   +  Reply  Wed Aug 31 23:01:02 2016, gautam, Update, SUS, the chamber HEPA tents are back 
Entry  Thu Dec 23 08:54:32 2010, Suresh, Update, elog, the delhi univ syndrome 
Entry  Mon Aug 4 12:12:20 2008, steve, Configuration, VAC, the ifo is at atm vent3h.jpgUntitled.png
Entry  Mon Aug 22 16:33:32 2016, Steve, Update, PEM, the lab temp is up temp.png
   +  Reply  Mon Aug 22 18:35:16 2016, Praful, Update, PEM, the lab temp is up temp_plot.pngtemp_plot.pngtemp_plot.png
   +  Reply  Fri Oct 7 15:36:03 2016, Steve, Update, PEM, the lab temp is up tempUp.pngPEM4d.png
Entry  Fri Nov 2 08:59:30 2007, steve, Bureaucracy, SAFETY, the laser is ON 
Entry  Thu Feb 21 09:56:26 2008, steve, Update, PSL, the laser is back laserisback.jpg
Entry  Fri May 29 18:57:09 2009, steve, Update, PSL, the laser is back laserisback.jpg
Entry  Wed Feb 20 16:24:37 2008, steve, Update, PSL, the laser is recovering slowly laserecoverring.jpg
Entry  Thu Jan 24 11:52:56 2008, steve, Update, PEM, the mud is cleaned up & MOPA shutter is opened 
Entry  Tue Nov 23 10:48:31 2010, Koji, Update, IOO, the plan of the day 
Entry  Mon Sep 8 10:57:49 2008, steve, Update, IOO, the psl and mc are back to normal fss.pngpmcbrick.pngbrick.jpg
   +  Reply  Wed Jan 10 09:49:28 2018, Steve, Update, PEM, the rat is back 
Entry  Mon Oct 29 09:16:31 2007, steve, Routine, VAC, the rga is back rgaisback.jpg
Entry  Thu May 28 18:41:26 2009, steve, Update, PSL, the saga of the chiller is ending 
   +  Reply  Wed Sep 9 10:13:31 2009, steve, Bureaucracy, General, the use of FAX machine, scanner & toaster 
   +  Reply  Fri Jun 29 11:02:00 2012, steve, Update, VAC, the vent is at 500 torr sussum.pngpzt.png
   +  Reply  Tue Jul 23 14:00:03 2013, Steve, Update, VAC, the vent is completed Atm.png5cyl.pngventSum1d.png
   +  Reply  Wed Feb 24 09:06:25 2016, Steve, Update, Treasure, the way it happened IMG_0120.JPG
Entry  Thu Apr 16 16:37:42 2009, Alberto, Update, Auxiliary locking, the zipper  19_3f_Current_40m_plots_SUCCESS.pdf
   +  Reply  Thu Apr 16 17:19:44 2009, Alberto, Update, Auxiliary locking, the zipper  04_3f_Current_40m_plots.pdf11_3f_40mUpgrade_plots.pdf
Entry  Thu Jul 11 09:24:03 2013, Steve, Update, General, there should be nothing left on optable tops 
   +  Reply  Tue Feb 16 09:13:39 2016, Steve, Update, General, there was a power outage & EQ 20160215_power_outage.png
ELOG V3.1.3-