7044
|
Fri Jul 27 14:28:36 2012 |
steve | Update | VAC | cold cathode gauges | Our cold
cathode 423 gauges are 10 years old.
They get insulated by age and show no ionization |
|
7047
|
Mon Jul 30 09:00:18 2012 |
steve | Update | PSL | PMC is still not fixed | The PMC was locking right the way, but
it's transmission would not go up.
Finally I get it back up by moving the "sticky" |
 |
7051
|
Mon Jul 30 15:49:16 2012 |
steve | Update | VAC | cc1 switched |
|
|
7056
|
Tue Jul 31 08:01:22 2012 |
steve | Update | VAC | cc1 switched |
|
|
7071
|
Wed Aug 1 16:38:46 2012 |
steve | Update | SUS | spare SRMU 03 optic moved | SOS optics prepared to be hanged are moved
from the South Flow Bench to S15 Clean Cabinet.
SRMU 03 (1-25-2010) specification |
  |
7087
|
Mon Aug 6 07:59:33 2012 |
steve | Update | SUS | PRM oplevs servo is still bad |
|
|
7088
|
Mon Aug 6 09:46:31 2012 |
steve | Update | IOO | poweroutage turns laser off |
. Power |
|
7089
|
Mon Aug 6 10:53:32 2012 |
steve | Update | VAC | status: vauum normal |
The power outage did not have
any effect on the vacuum system. I |
|
7091
|
Mon Aug 6 16:48:43 2012 |
steve | Update | SUS | SRM oplev is clipping | The SRM oplev beam is clipping. |
|
7106
|
Tue Aug 7 16:11:23 2012 |
steve | Update | SUS | optical table box wall proposal | Sanwiched wall as shown: 1"
clear acrylic, 2 layers of 0.004" thick
"window tint", 1 layer of |
 |
7154
|
Sun Aug 12 01:21:26 2012 |
steve | Update | SAFETY | exit door left unlocked | Caltech security called me at 1am Sunday.
Control room emergency |
|
7160
|
Mon Aug 13 15:31:09 2012 |
steve | Update | General | larger optical tables at the ends | I'm proposing larger
optical tables at the ends to avoid the
existing overcrowding. This would allow the |
 |
7194
|
Wed Aug 15 16:01:47 2012 |
steve | Update | General | larger optical tables at the ends ? | The drawing of the 4' x 2' table
cover can be seen at entry #6190
The new proposed wall #7106 |
|
7248
|
Wed Aug 22 11:41:20 2012 |
steve | Update | General | grout plate for optical table at the ends | Reinforced concrete grout plate for existing
carbon steel stands at the ends.
|
 |
7458
|
Mon Oct 1 17:03:01 2012 |
steve | Update | SUS | ETMY oplev relayed |
|
|
7538
|
Fri Oct 12 16:59:26 2012 |
steve | Update | SUS | TT PITCH damping |
|
|
7544
|
Mon Oct 15 08:08:33 2012 |
steve | Update | SUS | PRM damping restored |
|
|
7652
|
Thu Nov 1 08:48:42 2012 |
steve | Update | Alignment | progress, then setback - trend of BS table shift |
|
  |
7831
|
Fri Dec 14 09:05:04 2012 |
steve | Update | PEM | TT after eq 6.1 |
SRM, ITMY and MC3 moved some
what, but how are the TT? It may worth looking |
|
8240
|
Wed Mar 6 11:33:09 2013 |
steve | Update | SAFETY | safety audit 2013 |
|
|
8287
|
Wed Mar 13 16:04:24 2013 |
steve | Update | SAFETY | laser safety glasses checked | All safety glasses were cleaned in
soapy water by Bob. I measured their transmission
at 1064 nm, 150 mW, beam diameter 1.5 |
|
8309
|
Tue Mar 19 10:30:00 2013 |
steve | Update | SAFETY | crane inspection 2013 |
Professional crane inspector: Fred
Goodbar found two small leaks at the Vertex |
 |
8661
|
Fri May 31 10:25:17 2013 |
steve | Update | safety | first aid kits refilled |
|
|
8687
|
Thu Jun 6 16:33:19 2013 |
steve | Update | safety | updated laser inventory | Updated laser inventory and operator
list. They are posted in the 40m wiki and
entry doors of the 40m IFO room. |
|
9090
|
Fri Aug 30 08:08:29 2013 |
steve | Update | safety | fire horns-flashers tested OK |
We had fire alarm tests
and evacuation drills at 1:30pm yesterday. |
|
9653
|
Wed Feb 19 08:07:01 2014 |
steve | Update | safety | annual laser safety glasses check |
All 40m laser safety glasses
are cleaned and measured this morning. |
 |
9672
|
Tue Feb 25 16:54:57 2014 |
steve | Update | safety | safety audit 2014 |
We had our annual safety inspection
today. |
|
9681
|
Thu Feb 27 13:11:13 2014 |
steve | Update | safety | safety audit correction |
|
 |
9699
|
Thu Mar 6 11:43:17 2014 |
steve | Update | General | Guralp control unit | CMG-40T handheld controller unit is missing
its power supply. In order to zero the instrument
one has to apply plus and minus DC voltage. |
 |
9704
|
Fri Mar 7 16:56:17 2014 |
steve | Update | IOO | IOO qpds centered |
|
|
9705
|
Mon Mar 10 09:28:48 2014 |
steve | Update | IOO | IOO pointing 2 days | Morning seconds without adjustment.
|
 |
9725
|
Thu Mar 13 16:05:48 2014 |
steve | Update | safety | safety audit 2014 |
|
|
9730
|
Mon Mar 17 10:50:58 2014 |
steve | Update | safety | 2014 annual crane certification |
|
|
9743
|
Fri Mar 21 14:59:44 2014 |
steve | Update | PEM | controling dust | Please take a look at the table top with
the flashlight before |
|
9748
|
Mon Mar 24 22:13:37 2014 |
steve | Update | General | Power Failure |
|
|
9749
|
Tue Mar 25 14:52:57 2014 |
steve | Update | VAC | vacuum is recovered | Out
gassing plus leak rate 0.15 |
|
9757
|
Fri Mar 28 16:26:20 2014 |
steve | Update | VAC | RGA scan after power failure |
|
|
9802
|
Fri Apr 11 14:57:53 2014 |
steve | Update | LSC | congratulation |
|
 |
9870
|
Mon Apr 28 17:27:29 2014 |
steve | Update | safety | safety audit 2014 |
|
|
9873
|
Tue Apr 29 00:11:03 2014 |
steve | Update | safety | safety audit 2014 | Be aware that
this may affect POP QPD and POP RF Thorlabs |
|
9895
|
Thu May 1 17:14:36 2014 |
steve | Update | PSL | thin window AR measured | CVI broadband AR coating was measured at
the PSL-enclosure table around 9-10am today.
The 2W Innolight first PBS S polarization |
|
9900
|
Fri May 2 08:15:54 2014 |
steve | Update | safety | safety audit 2014 |
Late adition: CHECK all viewport covers. |
|
9902
|
Fri May 2 10:38:29 2014 |
steve | Update | PSL | thin window AR measured |
|
|
9914
|
Tue May 6 09:46:50 2014 |
steve | Update | PEM | cleaning day | Keven and Steve,
We cleaned around the Vertex chambers,
PSL and MC2 floor areas. |
|
9915
|
Tue May 6 10:22:28 2014 |
steve | Update | CDS | c1ioo dolphin fiber |
|
|
9918
|
Tue May 6 18:32:14 2014 |
steve | Update | LSC | TRY 60Hz noise hunt | This
is an effort to get rid of our ground loops
|
|
9921
|
Wed May 7 14:01:36 2014 |
steve | Update | LSC | TRY 60Hz noise hunt |
|
|
9933
|
Thu May 8 17:25:17 2014 |
steve | Update | LSC | TRY 60Hz noise hunt | I
worked at the ETMY-ISCT this morning and |
|
9937
|
Fri May 9 11:23:11 2014 |
steve | Update | Green Locking | decreased X green light power | Green light power decreased from 3 mW to
1 mW at the ETMX-ISCT shutter. More later. |
|
9941
|
Mon May 12 14:42:25 2014 |
steve | Update | endtable upgrade | optical table enclosure wall proposal and table at ETMY |
|
  |