40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 327 of 348  Not logged in ELOG logo
ID Datedown Author Type Category Subject Text Attachments
  1084   Fri Oct 24 11:42:48 2008 AlbertoUpdateGeneralAbs length: locking the X arm cavity in TEM01/10I went back to lock the arm cavity in either
TEM01 or TEM10 mode. Attached are the results.
We still have several resonances which we
 TRX_armTEM00-plot_09-10_together.png 
  1083   Fri Oct 24 11:21:26 2008 peteConfigurationPSLFSS LO input calibrated in dBmBased on the measurements described in my
previous elog, I created a new calc record
in the file /cvs/cds/caltech/target/c1psl/psl.db
  
  1082   Fri Oct 24 11:09:08 2008 steveUpdateSAFETYmore lexan plates under camerasThe MC2, MC3&1 and BSC-SUS cameras were repositioned
somewhat in the 
process of placing lexan disks under neat
  
  1081   Fri Oct 24 10:06:16 2008 YoichiConfigurationIOOMC gain and FSS gain changedFollowing the measurements of MC and FSS loop
gains, I modified mcup script to set the
MC VCO gain to 2dB (it was -4dB before).
  
  1080   Thu Oct 23 23:09:18 2008 YoichiUpdatePSLMC UGF is now 75kHzI measured three loop transfer functions of
the MC servo.
The blue curve in the first attachment is
 MC_Loop.pngOldAndNew.png 
  1079   Thu Oct 23 21:52:27 2008 YoichiUpdatePSLFSS UGF now 450kHzI measured the open loop transfer function
of the FSS, for the first time after I mitigated
the oscillation.
 FSS_OPLTF.png 
  1078   Thu Oct 23 20:47:28 2008 peteConfigurationPSLFSS LO calibration for MEDMToday I took a quick series of measurements
to calibrate the FSS LO power measurement
in the MEDM.  This was done by using the
 fss_lo_calibration.png 
  1076   Thu Oct 23 18:51:19 2008 AlbertoMetaphysicsComputerseLogI checked it and the latest version of the
elog software, the 2.7.5 (we have the 2.6.5)
has, among new nice features, the very good
  
  1075   Thu Oct 23 18:45:18 2008 AlbertoOmnistructureComputer Scripts / ProgramsPython code for GPIB devices developed for the Absl length experimentI wrote two Python scripts for my measurement
that can be also used/imitated by others:
sweepfrequency. py and HP8590.py. The first
 HP8590.pysweepfrequency.py 
  1074   Thu Oct 23 18:27:04 2008 AlbertoUpdateGeneralAbs length[quote]Here are the measurements I've got
yesterday. The plot shows the transmitted
power after the X arm while sweeping the
 HOM_Frequencies.m 
  1073   Thu Oct 23 18:23:47 2008 AlbertoUpdateGeneralAbs length[quote]Here are the measurements I've got
yesterday. The plot shows the transmitted
power after the X arm while sweeping the
 TRX_plot_06_07_08_together.png 
  1072   Thu Oct 23 15:27:19 2008 AlbertoUpdateGeneralAbs lengthHere are the measurements I've got yesterday.
The plot shows the transmitted power after
the X arm while sweeping the frequency of
 TRX_aplot_03_04_05_together.png 
  1071   Thu Oct 23 11:26:25 2008 steveBureaucracyVACoptosigma forks for vacuumNine short forks from OptoSigma were cleaned,
baked and measured by Bob T.
They passed the LIGO vac compatiblity test
  
  1070   Wed Oct 22 20:50:30 2008 AlbertoOmnistructureComputersGPSToday I measured the GPS clock frequency at
the output of CLOCK_MON in a board on the
same crate where the c1iool0 computer is
  
  1069   Wed Oct 22 17:48:58 2008 YoichiUpdateGeneralLenses for focusing the optical lever laser (Re:divergence of He Ne 1035P)Steve had difficulty in finding lenses for
focusing the HeNe laser for the ITM op-lev.
Following his measurement of the beam divergence,
 BeamProfile.pngBeamPropagation.pngBeamPropagation.zip 
  1068   Wed Oct 22 16:22:53 2008 steveBureaucracySAFETYCaryn received safety trainingCaryn Polatchi has received 40m safety training
on Monday, Oct 20
  
  1067   Wed Oct 22 12:37:47 2008 josephbUpdateComputersNetwork spreadsheetAttached in open office format as well as
excel format is spreadsheet containing all
the devices with IP addresses at the 40m.
 40m_network_10-15-08.ods40m_network_10-15-08.xls 
  1066   Wed Oct 22 09:42:41 2008 AlbertoDAQComputersc1iool0 rebooted and MC autolocker restartedThis morning I found the MC unlocked. The
MC-Down script didn't work because of network
problems in communicating with scipe7, a.k.a.
  
  1065   Tue Oct 21 18:19:42 2008 YoichiConfigurationComputersLISO and Eagle installedI installed LISO, a circuit simulation software,
into the control room linux machines.
I also installed a PCB CAD called Eagle to
 FSS_PC_Path.pdfAD829Stability.pngAD797Stability.pngFreqNoiseByAD829.png 
  1064   Tue Oct 21 17:52:30 2008 ranaSummaryPSLFSS Photo: early OctoberThis is a photo of the FSS board before Yoichi
did his surgery - it was taken with the D40
in macro mode, sitting on the big Gorilla
 fss.jpg 
  1063   Tue Oct 21 16:17:45 2008 YoichiUpdatePSLAD797 Oscillation in the FSS boardI checked each op-amp's output in the FSS
board to see if any indication of slew-rate
saturation can be found.
  
  1062   Tue Oct 21 16:14:42 2008 steveUpdateGeneraldivergence of He Ne 1035PThe ITM oplevs laser diodes are noisy.
They will be replaced by JDS 1035P
SN T8093307 was measured with the beamscanner.
 1035p_divergence.png 
  1061   Mon Oct 20 20:50:09 2008 YoichiConfigurationPSLFSS board chip replacementA quick update.

I changed two AD797s on the FSS board to
  
  1060   Mon Oct 20 16:18:00 2008 AlanConfigurationComputers/cvs/cds restored[quote]I moved missing files in /cvs/cds restored
by Alan and Stuart to the original locations.
I confirmed autoburt runs, and dtt, which
  
  1059   Mon Oct 20 15:02:00 2008 YoichiConfigurationComputers/cvs/cds restoredI moved missing files in /cvs/cds restored
by Alan and Stuart to the original locations.
I confirmed autoburt runs, and dtt, which
  
  1058   Mon Oct 20 12:18:38 2008 AlanUpdateComputer Scripts / Programsburtwb missing on Solaris but installed on linux64[quote]c1lsc stalled this evening, so I powercycled
it.
After that, I tried to lock arms to confirm
  
  1057   Mon Oct 20 09:45:56 2008 steveUpdatePEMPSL HEPA onThe PSL HEPA filter was turned on.
It should be running all times.
The 0.5 micron particle count is up to 20,000
  
  1056   Fri Oct 17 21:41:09 2008 YoichiUpdateComputer Scripts / Programsburtwb missing on Solaris but installed on linux64c1lsc stalled this evening, so I powercycled
it.
After that, I tried to lock arms to confirm
  
  1055   Fri Oct 17 16:43:10 2008 YoichiConfigurationComputersmcup/down scripts on linuxI made some changes to /cvs/cds/caltech/medm/c1/ioo/cmd/medmMCup
and medmMCdown so that those can be run from
medm on linux machines.
  
  1054   Thu Oct 16 16:26:26 2008 peteConfigurationPSLFSS phase matching cable installedRG 405 cable has a solid teflon dielectric,
and a velocity factor of 0.69.  To get the
8.2 degrees of additional phase on the LO
  
  1053   Thu Oct 16 13:12:58 2008 peteConfigurationPSLphase between FSS reference outputsI verified the phase between the FSS reference
outputs (used for LO and RF) using matched
BNC cables.  I measured 0.95 degree (average
  
  1052   Thu Oct 16 09:47:49 2008 YoichiConfigurationPSLFSS ref phase measurements[quote] I fit the bottom (quadratic) portion
of this curve, and found an optimum delay
of 25.8 ns, which can be implemented as 25.81
  
  1051   Thu Oct 16 09:44:49 2008 YoichiUpdatePSLBad cable for FSSYesterday arount 1:30PM, we lost the LO signal
for the FSS.
I found it was caused by a bad cable connecting
  
  1050   Wed Oct 15 22:07:52 2008 peteConfigurationPSLFSS ref phase measurementsOptimizing the FSS LO/RF phase at 500 kHz,
above the servo band, proved to be noisy
and those measurements were useless.  Today
 phasedelay.png 
  1049   Wed Oct 15 17:40:50 2008 ranaUpdatePSLPMC Offset adjustedI set the PMC servo input offset: closed the
MOPA shutter, zeroed the mixer output with
the offset slider, 
  
  1048   Tue Oct 14 19:24:34 2008 YoichiConfigurationPSLFSS light power reducedRana, Yoichi

To change the gain distribution in the FSS,
  
  1047   Tue Oct 14 19:18:18 2008 YoichiUpdateComputersBootFestRana, Yoichi

Most of the FE computers failed around the
  
  1046   Tue Oct 14 14:19:36 2008 peteConfigurationPSLFSS ref phaseToday I made several measurements which should
yield the optimized phase for the FSS 21.5
MHz reference.  I made two sets of measurements,
  
  1045   Mon Oct 13 18:59:39 2008 YoichiUpdatePSLNPRO EMI and FSS error signal correlationI made a simple loop antenna to measure the
electro-magnetic inteference (EMI) around
the master oscillator NPRO.
 IMG_1692.JPGSpectrum.pngSpectrumFar.pngCoherence.png 
  1044   Mon Oct 13 13:56:03 2008 YoichiUpdatePSLMOPA is not that much in trouble nowThe problem was found to be all to do with
the shutter.
The shutter started to work again, after
  
  1043   Mon Oct 13 13:51:49 2008 peteConfigurationPSLattempt to measure FSS ref phaseOn Friday I began a measurement of the FSS
reference phase.  The setup involves the
following:
  
  1042   Mon Oct 13 11:32:50 2008 YoixhiUpdatePSLMOPA is in trouble nowSteve, Alberto, Yoichi

A quick update.
 powerdrop.png 
  1041   Fri Oct 10 20:03:35 2008 YoichiConfigurationComputersmedm, dataviewer, dtt on 64 bit linuxI compiled EPICS (base, medm and ezca) and
dataviewer for 64 bit linux.
These are installed in /cvs/cds/caltech/apps/linux64/.
  
  1040   Fri Oct 10 13:57:33 2008 AlbertoOmnistructureComputersProblems in locking the X armThis morning for some reason that I didn't
clearly understand I could not lock the Xarm.
The Y arm was not a problem and the Restore
  
  1039   Fri Oct 10 10:20:42 2008 AlbertoOmnistructureComputersFEs are down[quote]
The front-end machines are all down.  Another
cosmic-ray in the RFM, I suppose.  Whoever
  
  1038   Fri Oct 10 00:34:52 2008 robOmnistructureComputersFEs are down
The front-end machines are all down.  Another
cosmic-ray in the RFM, I suppose.  Whoever
  
  1037   Wed Oct 8 23:18:23 2008 YoichiUpdatePSLCorrelation between the Sorensen switching noise and the FSS error signalI took some spectra and coherence function
of the FSS error signal and the +24V Sorensen
power line.
 PowerLineSpe.pngCoherence.png 
  1036   Wed Oct 8 22:23:43 2008 YoichiConfigurationElectronicsElectronics work bench cleanupYesterday, I cleaned up the electronics work
bench. I figured that keeping the work bench
in order has larger effect on the work efficiency
 Cleanup.jpg 
  1035   Wed Oct 8 21:26:20 2008 YoichiUpdatePSLAttempt to replace the DC-DC converter (aborted)Rich, Steve, Yoichi

We opened the MOPA box and inspected our
 DCDC.JPGNPRO.JPG 
  1034   Wed Oct 8 19:17:55 2008 YoichiConfigurationPSLLaser power is slowly recoveringThis afternoon we (rich, steve, yoichi) shutdown
the laser for the DC-DC converter installation.
  
ELOG V3.1.3-