40m
QIL
Cryo_Lab
CTN
SUS_Lab
TCS_Lab
OMC_Lab
CRIME_Lab
FEA
ENG_Labs
OptContFac
Mariner
WBEEShop
|
40m Log, Page 326 of 337 |
Not logged in |
 |
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
Tue Jul 28 14:11:14 2020, Jon, Update, VAC, Vac interlock test today 1:30 pm
|
Fri Aug 14 10:10:56 2020, Jon, Configuration, VAC, Vacuum repairs today
|
Sat Aug 15 02:02:13 2020, Jon, Configuration, VAC, Vacuum repairs today
|
Sat Aug 15 15:12:22 2020, Jon, Configuration, VAC, Overhaul of small turbo pump interlocks   
|
Mon Aug 24 08:13:56 2020, Jon, Update, VAC, UPS installation
|
Mon Aug 24 11:25:07 2020, Jon, Update, VAC, UPS installation
|
Wed Aug 26 15:48:31 2020, gautam, Update, VAC, Control screen left open on vacuum workstation
|
Fri Sep 4 15:26:55 2020, Jon, Update, VAC, Vac system UPS installation
|
Fri Sep 4 21:12:51 2020, Jon, Update, VAC, Vac system UPS installation
|
Sat Sep 5 12:01:10 2020, Jon, Update, VAC, Vac system UPS installation 
|
Wed Sep 16 12:03:07 2020, Jon, Update, VAC, Replacing pressure gauges
|
Sat Sep 19 18:07:35 2020, Koji, Update, VAC, TP3 RP failure 
|
Sat Sep 19 19:37:16 2020, not Koji, Update, VAC, TP3 RP failure
|
Mon Sep 21 15:57:08 2020, Jordan, Update, VAC, TP3 Forepump Replacement and Vac reset  
|
Wed Sep 23 08:57:18 2020, gautam, Update, VAC, TP2 running HOT
|
Wed Sep 23 10:06:52 2020, Koji, Update, VAC, TP2 running HOT
|
Wed Sep 23 15:06:54 2020, Jordan, Update, VAC, TP2 Forepump Re-install 
|
Tue Oct 6 14:35:16 2020, Jordan, Update, VAC, Spare forepumps
|
Tue Nov 10 11:59:37 2020, gautam, Update, VAC, Stuck RV2  
|
Wed Nov 18 17:51:50 2020, gautam, Update, VAC, Agilent pressure gauge controller delivered
|
Mon Nov 23 16:33:10 2020, gautam, Update, VAC, More vacuum deliveries
|
Wed Dec 2 12:27:49 2020, Jon, Update, VAC, Replacing pressure gauges
|
Thu Dec 3 10:33:00 2020, gautam, Update, VAC, TrippLite UPS delivered
|
Thu Dec 3 14:53:58 2020, Jon, Update, VAC, Replacing pressure gauges
|
Wed Dec 9 20:14:49 2020, gautam, Update, VAC, UPS failure   
|
Thu Dec 10 11:07:24 2020, Chub, Update, VAC, UPS fault
|
Thu Dec 10 11:17:50 2020, Chub, Update, VAC, UPS fault
|
Thu Dec 10 13:05:52 2020, Jon, Update, VAC, UPS failure 
|
Thu Dec 10 14:29:26 2020, gautam, Update, VAC, UPS failure
|
Wed Jan 6 15:28:04 2021, gautam, Update, VAC, Vac rack UPS batteries replaced
|
Mon Apr 19 09:17:51 2021, Jordan, Update, VAC, Empty N2 Tanks
|
Wed Apr 21 12:56:00 2021, Jordan, Update, VAC, Empty N2 Tanks
|
Wed Apr 28 11:31:40 2021, Jon, Update, VAC, Empty N2 Tanks
|
Wed Sep 1 14:16:21 2021, Jordan, Update, VAC, Empty N2 Tanks
|
Wed Sep 8 18:00:01 2021, Koji, Update, VAC, cronjobs & N2 pressure alert
|
Thu Oct 14 18:30:23 2021, Koji, Summary, VAC, Flange/Cable Stand Configuration
|
Mon Oct 18 10:02:17 2021, Koji, Update, VAC, Vent Started / Completed 
|
Tue Oct 19 10:59:09 2021, Koji, Update, VAC, Vent Started / Completed
|
Tue Oct 19 11:30:39 2021, Koji, Update, VAC, How to vent TP1
|
Wed Oct 20 15:58:27 2021, Koji, Update, VAC, How to vent TP1
|
Mon Dec 6 14:26:52 2021, Koji, Update, VAC, Pumping down the RGA section
|
Tue Dec 7 13:12:50 2021, Koji, Update, VAC, Pumping down the RGA section
|
Wed Dec 8 10:14:43 2021, Jordan, Update, VAC, Pumping down the RGA section 
|
Fri Dec 10 19:22:01 2021, Koji, Update, VAC, Pumping down the RGA section
|
Wed Dec 15 15:06:08 2021, Jordan, Update, VAC, Vacuum Feedthru Install
|
Tue Dec 21 16:35:39 2021, Koji, Update, VAC, ITMX NW feedthru (LO1-1) connector pin bent 
|
Mon Jan 31 10:39:19 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Removal   
|
Thu Feb 3 10:25:59 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Install  
|
Sat Feb 26 01:01:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels
|
Sat Feb 26 15:45:14 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels
|
|