40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 326 of 330  Not logged in ELOG logo
    Reply  Fri Aug 17 18:49:55 2012, Manasa, Update, 40m Upgrading, Optical layout updated 


    
        
            Quote:
        
        
            

           
            
                
           
Entry  Tue Aug 21 18:23:58 2012, Manasa, Update, 40m Upgrading, ETMX table layout 
Optical layout of the current endtable at ETMX has been updated in the svn repository (directory: 40M_Optical Layout). This layout will help in redesigning
the table for the proposed replacement.
Some part numbers of mounts/optics are missing and will be updated once I find them. If you find anything wrong with the layout, do let me know.
Entry  Thu Sep 6 19:21:58 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png
For the current baffle (dia. 40mm) centered along the beamline place at 1.77" from the test mass, the baffle will allow ~8.6mm visibility on the
camera from the center of the test mass (in case of ETMY).
*assuming the pick off mirror is placed at the edge of the tunnel
    Reply  Fri Sep 7 11:58:12 2012, Manasa, Configuration, 40m Upgrading, Baffle problem bfl.png


    
        
            Quote:
        
        
            

           The required diameter for the baffle if it sits on the cage at 1.77" from the test masses: the current baffle (dia. 40mm) centered along
    Reply  Fri Sep 7 13:01:53 2012, Manasa, Configuration, 40m Upgrading, Baffle problem Picture1.png


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Thu Sep 27 19:03:06 2012, Manasa, Update, 40m Upgrading, New ETMX layout - Version 1.0 ETMX_OldNew.png
 I am working towards redesigning the endtables. I've attached the first version of the layout. As per Steve's comment I've tried to leave a 2"
empty space on all sides of the table. It still has to be updated with the whole 40m layout to be more precise about the pickoff and the ingoing beam directions.
    Reply  Thu Sep 27 20:05:57 2012, Koji, Update, 40m Upgrading, New ETMX layout - Version 1.0 
1. I wonder how the mode profiling/matching was considered in the new layout.

I can see the distances between the components and lenses are largely different from the old ones.

This is OK if you plan to go through a new mode matching solution with new lenses. 
    Reply  Fri Sep 28 07:49:30 2012, Steve, Update, 40m Upgrading, New ETMX layout - Version 1.0 
  Where is IP-ANG ? It is good practice to use two mirrors at launching and detecting the beam, so you can walk it - precisely adjust it.
The window can be replaced at  ~$1,500 ea. 10 weeks as optical
quality BK7 with dual AR
Entry  Tue Nov 13 11:30:54 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser ETMX_sch.png
I'm set on the mission to get the new bigger endtables setup for the
auxiliary green laser; now that the tables are already here.
I want to have everything documented in this same thread for future reference. It has been a pain trying to filter relevant elogs.
    Reply  Tue Nov 13 16:18:51 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
With reference to measurements made earlier: elog, 
Beam parameters for Innolight 1W NPRO are:
wx0 = 160 um 
    Reply  Tue Nov 13 20:13:07 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : Circularize the 1W NPRO beam profile 
These fs are too short.


    
        
            Quote:
        
        
            
    Reply  Mon Nov 19 20:03:53 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.pdf
I have attached the possible layout of the optics on the new ETMX endtable. More optics have been added when compared to the early cartoon layout considering
that we need additional steering mirrors for reasons like: the table height in and out-of vac are different and several mounts have restricted movement
in certain degrees of freedom. 
    Reply  Mon Nov 19 20:17:53 2012, Jenne, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 
 
For convenience, I would include a steering mirror in front of the TRX PD.  Also, don't we usually have lenses in the oplev paths?  Also,
also, do we need lenses in front of the green refl and TRX PDs?  Do you have a place in mind for the shutter?  Is there a way to compactify the
    Reply  Mon Nov 19 22:42:14 2012, Koji, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table 

    I don't like the idea to place the cylindrical lenses right in front of the laser. 
    This design requires the CLs to be tilted to avoid direct reflections going into the laser. 
    It is also required that they are made of UV fused silica to avoid thermal lensing.
    Reply  Wed Dec 12 11:04:45 2012, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : ETMX layout on new table ETMX_endtable_New_Model.png
I have updated the layout to fix all the issues brought up. The last couple of 2" green steering mirrors will hold the PZTs for input steering.
I will update with the list of optical components that we will be ordering for this layout. The ETMY endtable layout will be similar to this one, except
that we will have IPANG setup at the empty space in the right top corner.
Entry  Wed Dec 12 14:59:49 2012, Manasa, Configuration, 40m Upgrading, New tip-tilts layout in BSC bs.png
I have updated the BSC layout to include the new tip-tilts. The bigger footprints of the tiptilts are on in the way of the existing
PRM oplev path. So I have recalculated new PRM oplev paths. The proposed layout requires a new oplev mirror to be included.
 
    Reply  Thu Jan 10 12:41:06 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : wiki page 
 
I have created a wiki page linked here with all details about the endtable
upgrade.
    Reply  Tue Mar 5 00:24:52 2013, Manasa, Configuration, 40m Upgrading, Endtable upgrade for auxiliary green laser : customized mount 
 Drawing of customized mount for endtable doubler crystal (PV40+PVP2+NP9071) modified and updated on the endtable upgrade wiki page.
    Reply  Tue Mar 19 14:21:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade : INVENTORY Endtable_inventory.pdf
THE INVENTORY FOR ETMY ENDTABLE.
We definitely need the polaris mirror mounts and cylindrical lenses. As for the rest, we can still go ahead and do the swapping without them.
 
    Reply  Tue Mar 19 19:19:50 2013, Jenne, Update, 40m Upgrading, Endtable upgrade : INVENTORY 
Does "Ready (in stock)" for the base plates mean in stock at the company, or in hand and already here in the lab?
For the 2" mirror mounts, are we planning on making a decision soon, or a long time in the future....i.e. is this something that should go
in the temporary solution column?
    Reply  Wed Mar 20 14:00:21 2013, Steve, Update, 40m Upgrading, Endtable upgrade  
As discussed at the 40m meeting: Koji, Manasa and Steve
We are planning to remove the whole 4'x2' optical table ETMY-ISCT with
optics as it is tomorrow morning. 
    Reply  Wed Mar 20 15:51:54 2013, Manasa, Update, 40m Upgrading, Endtable upgrade  Endtable_inventory.pdf


    
        
            Quote:
        
        
            

           As discussed at the 40m meeting: Koji, Manasa and Steve
    Reply  Thu Mar 21 08:11:53 2013, Steve, Update, 40m Upgrading, ETMY table swap 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Thu Mar 21 08:46:46 2013, Manasa, Update, 40m Upgrading, ETMY table swap 
Yes! We are swapping.
I'll be there very soon!
    Reply  Thu Mar 21 17:06:34 2013, Steve, Update, 40m Upgrading, ETMY table is out ETMYtableSupport.jpg


    
        
            Quote:
        
        
            

           Yes! We are swapping.
    Reply  Mon Mar 25 18:07:31 2013, Steve, Update, 40m Upgrading, ETMY table is out shimmingEE.jpg


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Mar 25 18:42:38 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Timeline Endtable_progress.pdf
 Endtable upgrade - timeline and progress chart. End table upgrade wiki page updated.
 
    Reply  Tue Mar 26 16:10:31 2013, Jamie, Update, 40m Upgrading, ETMY table leveling end-tabel-leveling.png
Steve's suggestion for how to level the end table using "swivel leveling mounts":
    Reply  Tue Mar 26 16:36:24 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  optabSTAND.PDFswivvelMountEE.jpg


    
        
            Quote:
        
        
            

           Steve's suggestion for how to level the end table using "swivel leveling mounts":
    Reply  Fri Mar 29 00:27:06 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : Assembly IMG_0433.JPGIMG_0434.JPG
I am currently putting together all components so that they are ready to go on the table once leveling and installation of shield box is done. All dirty
optics were drag wiped. These are stored in the cupboard along the Y arm. 
I could not find the fiber coupling mount on the old endtable. Also the harmonic separator that reflects the trans beam to PDs and camera is labelled
    Reply  Fri Mar 29 16:30:27 2013, Steve, Update, 40m Upgrading, table leveling mounts go here  


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Fri Mar 29 16:35:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade 
 
 My full effort to get the optical table enclosure ready for the lab has failed today.
What I did: cut IR thermashield sheets to size for sides and top and sandwitched them beetween 1" and 1/4" acrylic.
    Reply  Tue Apr 2 17:23:23 2013, Steve, Update, 40m Upgrading, new ETMY optical table & enclosure in place EEopt1d.jpg
 Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm
I have to shim out the enclosure, finish leveling the table and cut surgical tubing O-ring for the top.
 
    Reply  Thu Apr 4 17:23:05 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics 


    
        
            Quote:
        
        
            

            Enclosure is at the east end. It has it's bottom o-ring in place. It will be ready for optics tomorrow around 5pm
    Reply  Fri Apr 5 01:18:34 2013, Manasa, Update, 40m Upgrading, Not a fan of the new plastic box yet 


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Fri Apr 5 01:28:56 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
I started populating the end table; the TRY path to start with. I found that I need to redo the cables/electronics layout around the table as we have
only one cable feedthrough hole with the new box right now. I need another hand with this and will have Annalisa help me tomorrow.
P.S. I misaligned PRM and restored ETMY to get TRY flashes. I tweaked ETMY to see strong TEM00 flashes.
    Reply  Sat Apr 6 09:21:36 2013, rana, Update, 40m Upgrading, Not a fan of the new plastic box yet 
 
 1) We still need to drill and install the thumbscrew latches which secure the lids to the table. We cannot use the tables as
an acoustic enclosure with loose lids.
    Reply  Mon Apr 8 16:37:26 2013, Steve, Update, 40m Upgrading, ETMY enclosure wall transmission 
 
 Enclosure cover #1 transmission measured  in 1064 nm,  156 mW,  P polarization and beam size ~ 1 mm
As condition:  fully assembled, protective layer removed, tinted- adhesive activated on yellow acrylic on top of each other.
    Reply  Tue Apr 9 00:15:18 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : populating the table 
[Den, Annalisa, Manasa]

The Alberto laser was moved from the PSL table. The height of the heat sink rendered a beam height of only 3 inches. I did not want to deal with
    Reply  Tue Apr 9 00:32:57 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 
The TRY path on the end table is temporarily in place to help IFO locking.
The Y arm transmission was steered to get TRY back on the PD and the camera. I found that TRY is a couple of inches off in yaw at the end table
(comparing to the CAD layout and the earlier layout) and I believe it is because of the changes in input pointing.
    Reply  Tue Apr 9 08:37:54 2013, Steve, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : TRY temporarily in place 


    
        
            Quote:
        
        
            

           The TRY path on the end table is temporarily in place to help IFO locking.
    Reply  Tue Apr 9 21:27:48 2013, Jenne, Update, 40m Upgrading, TRY temporarily in place 


    
        
            Quote:
        
        
            

           I've used a Y1 mirror to steer the Y transmission to an R98% BS. The reflected beam falls on PDA520 and the transmitted beam is steered to
    Reply  Wed Apr 10 14:25:04 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : LWE Alberto laser beam profile LWE_Alberto_BP.pngbeam_waist.zip
I measured the beam profile of the Alberto laser (that will be the ETMY end laser) as I found the data inconsistent with the measurements done earlier.
Method
The laser was set to nominal current (ADJ =0) and the output measured 330mW. I used a 99% BS and measured the beam profile of the transmitted light
    Reply  Wed Apr 17 02:20:13 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress TRY_OPL.jpgGRY.jpg
 
Assembly progress: 
1. ETMY oplev setup has been put together. Because of the shift in the TRY path, I had to modify the oplev path on the table as well.
    Reply  Mon Apr 22 17:43:09 2013, Steve, Update, 40m Upgrading, ETMY optical table & enclosure is ready for optics more2.jpg


    
        
            Quote:
        
        
            

           
            
                
           
    Reply  Mon Apr 22 19:48:56 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 
Are 4 of these spring loaded pins enough?  I'm not sure how one pin can hold 2 lids at each point.  It seems like we need 8 pins.
    Reply  Tue Apr 23 15:00:20 2013, Jenne, Update, 40m Upgrading, 4 pins enough? 


    
        
            Quote:
        
        
            

           Are 4 of these spring loaded pins enough?  I'm not sure how one pin can hold 2 lids at each point.  It seems like we need 8 pins.
    Reply  Wed Apr 24 15:27:59 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress: New layout ETMY_endtable_New.png
Layout that will be improved upon over the next few days.
Things that need to be updated:
1. Waist size at all optics
    Reply  Thu May 2 01:19:41 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_0502.png
I started to put together optics at the endtable. I am attaching the  layout with the green blocks showing the optics that are assembled and  will not
be moved henceforth unless somebody contradicts.
1. Power after HWP = 314mW
    Reply  Tue May 7 19:06:45 2013, Manasa, Update, 40m Upgrading, Endtable upgrade for auxiliary green laser : progress ETMY_endtable_New.png
I have updated the waists (W)  and beam diameters (D) at 1064nm optics on the endtable.
I am not able to locate the characteristics of QPD-Y and oplev PD and hence took the beam diameter to be half of the detector surface area to determine
their positions.
ELOG V3.1.3-