40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 326 of 339  Not logged in ELOG logo
    Reply  Thu Jan 20 18:16:29 2022, Anchal, Update, BHD, AS4 set to trigger free swing test 
    Reply  Thu Jan 20 18:41:55 2022, Anchal, Summary, BHD, SR2 set to trigger free swing test 
    Reply  Fri Jan 21 11:24:42 2022, Anchal, Summary, BHD, SR2 Input Matrix Diagonalization performed.  SR2_SUS_InpMat_Diagnolization_20220121.pdfSR2_FreeSwingData_PeakFitting_20220121.pdf
    Reply  Fri Jan 21 16:40:10 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  AS4_SUS_InpMat_Diagnolization_20220121.pdfAS4_FreeSwingData_PeakFitting_20220121.pdf
    Reply  Mon Jan 24 18:53:09 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 placed and OSEMs tuned 
    Reply  Mon Jan 24 20:48:48 2022, Anchal, Update, BHD, AS4 Input Matrix Diagonalization performed.  
    Reply  Tue Jan 25 10:55:02 2022, Anchal, Summary, BHD, Part VIII of BHR upgrade - LO2 input matrix diagonalization performed. 
    Reply  Tue Jan 25 11:02:54 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test failed AS1_freeSwingTestFailed.pdf
    Reply  Tue Jan 25 16:42:03 2022, Anchal, Summary, BHD, Reduced filter gains in all damped new SOS 
    Reply  Thu Jan 27 17:57:35 2022, Anchal, Summary, BHD, Part III of BHR upgrade - Replaced small suspended PR3 with new SOS PR3 and OSEM tuning 
    Reply  Fri Jan 28 16:35:18 2022, Anchal, Summary, BHD, AS1, PR2 and PR3 set to trigger free swing test 
    Reply  Wed Feb 2 16:22:00 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR2 inpute matrix diagonalized PR2_FreeSwingData_PeakFitting_20220125.pdfPR2_SUS_InpMat_Diagnolization_20220202.pdf
    Reply  Wed Feb 2 16:27:57 2022, Anchal, Summary, BHD, Part III of BHR upgrade - PR3 inpute matrix diagonalized PR3_FreeSwingData_PeakFitting_20220125.pdfPR3_SUS_InpMat_Diagnolization_20220202.pdf
    Reply  Wed Feb 2 16:32:02 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 free swing test still not good AS1_FreeSwingData_PeakFitting_20220125.pdfAS1_SUS_InpMat_Diagnolization_20220202.pdf
Entry  Fri Feb 4 10:21:39 2022, Anchal, Summary, General, Complete lab shutdown Vac_Status_Screenshot_2022-02-04_10-19-24.png
    Reply  Wed Feb 9 11:56:24 2022, Anchal, Update, General, Bringing back CDS Screenshot_2022-02-09_12-11-33.png
    Reply  Thu Feb 10 15:41:00 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) 
    Reply  Thu Feb 10 17:57:48 2022, Anchal, Update, General, Scheduled power outage recovery - Locking mode cleaner(s) PXL_20220211_021509819.jpg
    Reply  Fri Feb 11 10:56:38 2022, Anchal, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW 
    Reply  Fri Feb 11 11:17:00 2022, Anchal, Update, General, Scheduled power outage recovery 
    Reply  Fri Feb 11 16:09:11 2022, Anchal, Update, General, Scheduled power outage recovery - Input power increased 
    Reply  Fri Feb 11 17:07:19 2022, Anchal, Update, CDS, [Solved] Huge random numbers flowing into ETMX/ETMY ASC PIT/YAW 
    Reply  Wed Feb 16 15:19:41 2022, Anchal, Update, General, Reconfigured MC reflection path for low power 
    Reply  Wed Feb 23 15:08:57 2022, Anchal, Update, General, Removed extra beamsplitter in MC WFS path 
    Reply  Thu Feb 24 14:32:57 2022, Anchal, Update, General, MC RFPD DCMON channel got stuck to 0 
    Reply  Thu Feb 24 19:26:32 2022, Anchal, Update, General, IMC Locking 
    Reply  Thu Mar 3 15:37:40 2022, Anchal, Summary, CDS, c1teststand restructured 
    Reply  Fri Mar 4 11:04:34 2022, Anchal, Summary, CDS, c1susaux2 system setup and running 40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
    Reply  Mon Mar 7 19:38:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls issues 
    Reply  Mon Mar 14 12:20:05 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis installed BHD_WatchDogs.png40mBHD_C1SUSAUX2_Acromag_Chassis.pdf
    Reply  Tue Mar 15 11:52:34 2022, Anchal, Summary, CDS, c1su2 model updated for sending Run/Acquire Binary Output to Binary Interface card c1su2.pdf
    Reply  Tue Mar 15 14:10:41 2022, Anchal, Summary, CDS, c1su2 model remade, reinstalled, restarted after the update 
    Reply  Tue Mar 15 18:42:37 2022, Anchal, Summary, BHD, Part IX of BHR upgrade - AS1 resuspended and OSEMs tuned 
    Reply  Tue Mar 15 18:45:12 2022, Anchal, Summary, BHD, Part X of BHR upgrade - BHDBS Path setup 
    Reply  Thu Mar 17 17:23:22 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment 
    Reply  Thu Mar 17 19:12:44 2022, Anchal, Summary, CDS, c1auxey1 slow controls acromag chassis installed, not powered 
    Reply  Fri Mar 18 19:10:51 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
    Reply  Mon Mar 21 14:22:52 2022, Anchal, Update, SUS, ETMY Alignmnet offsets needed to be changed 
    Reply  Mon Mar 21 18:24:07 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
    Reply  Mon Mar 21 18:42:06 2022, Anchal, Summary, CDS, c1auxey1 slow controls issues 
    Reply  Thu Mar 24 19:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
    Reply  Fri Mar 25 11:39:14 2022, Anchal, Update, SUS, ETMY SUS Electronics Replacement - Questions 
    Reply  Fri Mar 25 18:20:28 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - Green laser alignment on Yarm 
    Reply  Mon Apr 4 17:03:47 2022, Anchal, Summary, CDS, c1susaux2 slow controls acromag chassis fixed and installed Screenshot_2022-04-04_17-03-26.png
    Reply  Tue Apr 5 18:15:06 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Xarm 
    Reply  Wed Apr 6 12:03:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
    Reply  Thu Apr 7 17:59:51 2022, Anchal, Summary, BHD, Part IIa of BHR upgrade - IR laser alignment on Yarm 
    Reply  Fri Apr 22 12:09:51 2022, Anchal, Update, Coil Drivers, Please update DCC pages 
    Reply  Fri Apr 22 12:15:08 2022, Anchal, Update, BHD, Cable post installation 
    Reply  Mon Apr 25 16:57:57 2022, Anchal, Update, BHD, Cable post installation 
ELOG V3.1.3-