  916   Wed Sep 3 18:45:01 2008 AlbertoConfiguration PD3 gainAlberto, Yoichi,

We found that the PD3 servo was unstable
  
  1442   Mon Mar 30 12:29:17 2009 YoichiConfiguration MC1 glitches not seen during the weekendThe attached is the MC trend for the past
12 hours.
There is no MC1 glitches in the OSEM signals.
 MC_drift.pdf 
  1556   Thu May 7 17:59:23 2009 AlbertoConfiguration MC WFSThis afternoon the MC could not get locked.
I
first checked the Osems values at the MC
mirrors and compared them to the trend of
  
  1739   Mon Jul 13 16:59:10 2009 ZachUpdate GigE Phase CameraToday, I moved the router from on top of
the PSL into the control room in order to
perform dark field tests on the GC650 (which
  
  1797   Mon Jul 27 14:43:34 2009 ChrisUpdate PhotodetectorsI found two ThorLabs PDA55 Si photodetectors
that says detect visible light from DC to
10MHz that I'm going to use from now on. 
  
  1907   Fri Aug 14 18:33:02 2009 ClaraUpdate Record of Accelerometer and Seismometer MovementsRather than make a new elog post every
time I move something, I'm going to just
keep updating this Google spreadsheet, which
  
  2984   Tue May 25 17:04:37 2010 KevinUpdate Beam Profile After Mode CleanerI fit the data from the beam profile that
Jenne measured on 5/21/2010. The distances
are measured from halfway between MC1 and
 mcfit.pngmcerrors.png 
  3027   Tue Jun 1 18:39:59 2010 NancyUpdate Lead spheres for the seismographs 
the lead spheres that were placed
below the granite slab have been  flattened
 P6010170.JPGP6010166.JPGP6010164.JPG 
  3168   Wed Jul 7 12:45:00 2010 nancyUpdate Weekly UpdateWednesday after the meeting - Started report,
learnt mode cleaner locking from Kiwamu and
Rana, saw how to move optics on the tables
  
  3560   Sun Sep 12 23:02:53 2010 valeraUpdate PMC mode matchingKiwamu and I found that the first lens
in the PMC mode matching telescope was mislabeled.
It is supposed to be PLCX-25.4-77.3-C and
 pmc.pdfpmc-abcd.tiff 
  3561   Sun Sep 12 23:16:52 2010 valeraUpdate FSS mode matchingThe attached plot shows the beam scans
of the beam leaking from the back mirror
of the PMC to the BS cube that first turns
 fss.pdffssaom-abcd.tifffssrc-abcd.tiff 
  3562   Mon Sep 13 00:19:32 2010 ranaUpdate VCO Driver Output power v. slider control voltageI measured the RF power output of the VCO
Driver box as a function of slider value.
I measured using the Gigatronics Handheld
 vco.png 
  3579   Wed Sep 15 19:29:13 2010 valeraSummary PSL power budget
    
        

            Location
  
  3580   Fri Sep 17 01:36:14 2010 valeraUpdate PMC line widthThe attached plots show the PMC cavity
line width measurement with 1 mW and 160
mW into the PMC. The two curves on each plot
 TEK00009.PNGTEK00010.PNG 
  3897   Thu Nov 11 15:27:43 2010 valera, steveConfiguration ISS AOM installed We installed the ISS AOM in the PSL.
The AOM was placed right after the EOM. The
beam diameter is ~600 um at the AOM. The
  
  4317   Thu Feb 17 22:51:04 2011 josephb, valeraSummary dither alignment modelWe made a model for the dither angular
stabilization system c1ass.mdl. The attached
file shows the diagram.
 ass-model.png 
  4335   Tue Feb 22 00:18:47 2011 valeraConfiguration c1ioo and c1ass work and related fb crashes/restartsI have been editing and reloading the c1ioo
model last two days. I have restarted the
frame builder several times. After one of
  
  4339   Tue Feb 22 23:11:42 2011 valeraUpdate new medm screens: C1ASS.adl and C1MCASS.adl   C1MCASS.jpegC1ASS.jpeg 
  4345   Wed Feb 23 16:34:42 2011 valeraConfiguration pmc lens stagedI put the PMC last mode matching lens (one
between the steering mirrors) on a translation
stage to facilitate the PMC mode matching.
 PMCrefl.JPGP1070438.JPGP1070439.JPG 
  4625   Wed May 4 13:51:51 2011 valeraConfiguration Intermittent MC3 UL PD signalThe attached plot shows the 30 day trend
of the MC3 UL PD signal. The signal dropped
to zero at some point but now it is close
 mc3ulpdmon.pdf 
  4627   Wed May 4 15:22:39 2011 kiwamuUpdate Re: Intermittent MC3 UL PD signalI
went push all the possible connectors for
the MC3 shadow sensors including the SCSIs,
  
  4959   Mon Jul 11 10:10:31 2011 IshwitaConfiguration AA board The AA board shown in attachment 1 will
be used in the seismometer hardware setup.
A cartoon of this setup is shown in attachment
 P7080305.JPGseismometers.png 
  4999   Wed Jul 20 11:42:47 2011 Ishwita, ManuelUpdate Weekly summary
    We gave a white-board presentation
on derivation of formula for optimum Wiener
filter coefficients and wrote a latex document
  
  5015   Thu Jul 21 23:36:51 2011 JennyUpdate Fitting beam waist with MATLABI am starting work on the PSL table at
the 40m. My goal is to lock  the laser coming
from the nearby table to the FP cavity and
 twobeamfit2.jpg 
  6282   Wed Feb 15 11:34:01 2012 steveUpdate under the shouth end optical tableI added an U channel based bottom shelf
at the south end today.
 P1080535.JPGP1080537.JPG 
  6571   Thu Apr 26 09:22:17 2012 steveUpdate under the east end optical table

    
        
  
  6878   Wed Jun 27 11:27:49 2012 LizUpdate First Week Update!This week, the
other SURF students and I got          
  
  7164   Mon Aug 13 19:29:10 2012 ManasaSummary Ringdown measurementsI tried to make ringdown measurements at
the IMC using the DC falling edge as the
trigger. Input to the MC was switched off
  
  7256   Thu Aug 23 12:17:39 2012 ManasaUpdate IMC RingdownThe ringdown measurements are in progress.
But it seems that the MC mirrors are getting
kicked everytime the cavity is unlocked by
 mozilla.pdfMC_sus.pdf 
  7257   Thu Aug 23 15:35:33 2012 ranaUpdate IMC Ringdown 
 It is HIGHLY unlikely
that the IMC mirrors are having any effect
  
  7260   Thu Aug 23 17:51:25 2012 ManasaUpdate IMC Ringdown

    

       
            
  
  7317   Thu Aug 30 12:01:27 2012 janosch, Manasa,SteveUpdate ETMXWe have done some work at ETMX today. We
installed the baffle and placed two
mirrors on the table.
  
  7319   Thu Aug 30 17:03:32 2012 janosch, Manasa, SteveUpdate ETMXThe baffle has been moved away from ETMX
towards the edge of the table (in fact, it
is a little beyond the edge). It is also
  
  7326   Fri Aug 31 10:16:02 2012 janosch, SteveUpdate ETMX, scattering prepsThe alignment of the pick-off mirror near
ETMX is done. Everything turned out to be
easy once we realized that there is no sense getting
 IMG_1609.JPGIMG_1608b.jpg 
  7352   Thu Sep 6 17:11:40 2012 janosch, Manasa, SteveUpdate pick-off and baffle at ETMYWe have installed the pick-off mirror at
the ETMY table for the small-angle
scattering measurement on ITMY. As we
  
  7356   Fri Sep 7 00:08:10 2012 janoschMetaphysics baffle clipping lossWith a curvature radius of about 57m
for the ETMs, flat ITMs at the beam waist,
and using 39m for the arm lengths, one finds
  
  7363   Fri Sep 7 15:58:29 2012 Rijuparna ChakrabortyUpdate cavitymode scan IMC transmission photodiode has been
aligned.
  
  7366   Fri Sep 7 17:37:16 2012 JenneUpdate cavitymode scan

    

       
            
  
  7368   Sat Sep 8 00:15:57 2012 Rijuparna ChakrabortyUpdate cavitymode scan

    

       
            
  
  7376   Wed Sep 12 19:26:08 2012 Rijuparna ChakrabortyUpdate cavitymode scan Summary: Recorded the presence of
higher order modes in IMC
What I did: Misaligned the flat mirror
 7x 
  7486   Thu Oct 4 23:01:49 2012 RijuparnaConfiguration cavitymode scan Here I am attaching the schematic
diagram of the experimental set-up for IMC
cavitymode scanning. A 30- 45MHz scanning
 diagram1.pdf 
  7519   Wed Oct 10 15:31:59 2012 RijuparnaUpdate cavitymode scan Rijuparna, Jenne
Today I checked the optical lay-out
in MC REFL board of the
  
  7520   Wed Oct 10 15:46:23 2012 JenneUpdate cavitymode scan

    

       
            
  
  7537   Fri Oct 12 15:31:03 2012 RijuparnaConfiguration cavitymode scan Rijuparna, Manasa
Today I have checked the optical
layout of the MC transmission RFPD table
  
  7612   Wed Oct 24 19:55:06 2012 jamieUpdate my assesment of the folding mirror (passive tip-tilt) situationWe removed all the folding mirrors ({P,S}R{2,3})
from the IFO and took them into the bake
lab clean room.  The idea was that at
  
  7613   Wed Oct 24 20:09:41 2012 jamieUpdate installing the new dirchoic mirros in PR3/SR3When installing the dichroics we need to
pay attention to the wedge angle.  I
didn't, so the ghost beam is currently point
  
  7617   Thu Oct 25 02:10:22 2012 KojiUpdate my assesment of the folding mirror (passive tip-tilt) situationThe thinner wire has a history that it
did not improve the hysteresis (ask Jenne).
Nevertheless, it's worth to try.
  
  7618   Thu Oct 25 06:49:49 2012 KojiUpdate my assesment of the folding mirror (passive tip-tilt) situation

    

       
            
  
  7747   Mon Nov 26 19:27:59 2012 RijuHowTo Testing AG4395A+GPIBRiju, Jenne
We have checked the transfer function
of a bandpass filter using AG4395A network
 tfmag.jpgtfphase.jpg 
  7756   Tue Nov 27 19:06:16 2012 RijuUpdate Testing AG4395A+GPIB I ve tested another bandpass filter
today with similar set-up. This time I took
the data with corrected reference level.
 tfmag1.jpgtfphase1.jpg 