Entry  Wed Dec 9 20:14:49 2020, gautam, Update, VAC, UPS failure rackBeforenAfter.pdfIMG_0008.jpgIMG_0009.jpgvacStatus.png
    Reply  Thu Dec 10 11:07:24 2020, Chub, Update, VAC, UPS fault 
    Reply  Thu Dec 10 11:17:50 2020, Chub, Update, VAC, UPS fault 
    Reply  Thu Dec 10 13:05:52 2020, Jon, Update, VAC, UPS failure TP2_time_history.pngslow_controls_monitors.png
    Reply  Thu Dec 10 14:29:26 2020, gautam, Update, VAC, UPS failure vacDiag1.png
Entry  Wed Jan 6 15:28:04 2021, gautam, Update, VAC, Vac rack UPS batteries replaced 
Entry  Mon Apr 19 09:17:51 2021, Jordan, Update, VAC, Empty N2 Tanks N2_Pressure.PNG
    Reply  Wed Apr 21 12:56:00 2021, Jordan, Update, VAC, Empty N2 Tanks Screenshot_2021-04-21_12-53-26.png
    Reply  Wed Apr 28 11:31:40 2021, Jon, Update, VAC, Empty N2 Tanks 
Entry  Wed Sep 1 14:16:21 2021, Jordan, Update, VAC, Empty N2 Tanks 
Entry  Wed Sep 8 18:00:01 2021, Koji, Update, VAC, cronjobs & N2 pressure alert 
Entry  Thu Oct 14 18:30:23 2021, Koji, Summary, VAC, Flange/Cable Stand Configuration 40m_flange_layout_20211014.pdf
Entry  Mon Oct 18 10:02:17 2021, Koji, Update, VAC, Vent Started / Completed Screen_Shot_2021-10-18_at_14.52.34.pngScreenshot_2021-10-18_15-08-59.png
    Reply  Tue Oct 19 10:59:09 2021, Koji, Update, VAC, Vent Started / Completed 
    Reply  Tue Oct 19 11:30:39 2021, Koji, Update, VAC, How to vent TP1 Screen_Shot_2021-10-18_at_14.52.34.png
    Reply  Wed Oct 20 15:58:27 2021, Koji, Update, VAC, How to vent TP1 
Entry  Mon Dec 6 14:26:52 2021, Koji, Update, VAC, Pumping down the RGA section 
    Reply  Tue Dec 7 13:12:50 2021, Koji, Update, VAC, Pumping down the RGA section 
    Reply  Wed Dec 8 10:14:43 2021, Jordan, Update, VAC, Pumping down the RGA section 40m_RGAVolume_12_8_21.PNG40m_RGAVolume_Torr_12_8_21.PNG
    Reply  Fri Dec 10 19:22:01 2021, Koji, Update, VAC, Pumping down the RGA section 
Entry  Wed Dec 15 15:06:08 2021, Jordan, Update, VAC, Vacuum Feedthru Install 
Entry  Tue Dec 21 16:35:39 2021, Koji, Update, VAC, ITMX NW feedthru (LO1-1) connector pin bent PXL_20211222_002019620.jpgPXL_20211222_003014068.jpg
Entry  Mon Jan 31 10:39:19 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Removal 20220131_100637.jpg20220131_102807.jpg20220131_102818.jpg20220131_100647.jpg
Entry  Thu Feb 3 10:25:59 2022, Jordan, Update, VAC, TP1 and Manual Gate Valve Install 20220203_101455.jpg20220203_094831.jpg20220203_094823.jpg
Entry  Sat Feb 26 01:01:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
    Reply  Sat Feb 26 15:45:14 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels Vac-gauges-flow-diagram.png
    Reply  Mon Feb 28 19:15:10 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
    Reply  Tue Mar 1 20:38:49 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels Working_Serial_Port_List_1.pngWorking_Serial_Port_List_2.pngWorking_Config_Ports#1-5.pngWorking_Config_Ports#7-8.png
    Reply  Wed Mar 2 11:50:39 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels XGS600_IOLAN_settings_1.pngXGS600_IOLAN_settings_2.pngXGS600_USBserial_settings.pngXGS600_comm_test.pyXGS600_comm_test_result.txt
    Reply  Wed Mar 2 12:40:08 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 6x
Entry  Fri Mar 4 18:12:44 2022, Koji, Update, VAC, RGA pumping down Screenshot_2022-03-04_19-38-11.png
    Reply  Sun Mar 6 18:14:45 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_investigation.pdf
    Reply  Mon Mar 7 13:53:40 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels iolan_xgs_comm_live.pdf
    Reply  Mon Mar 7 14:52:34 2022, Koji, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels 
    Reply  Tue Mar 8 12:08:47 2022, Tega, Update, VAC, Ongoing work to get the FRG gauges readouts to EPICs channels XGS600_calibration.pdf
Entry  Wed Mar 9 10:23:28 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #1 
Entry  Thu Mar 10 09:39:59 2022, Jordan, Update, VAC, Leak Testing of New Manual Gate Valve - Attempt #2 3-09-2022.PNG3-10-2022.PNG
Entry  Tue Mar 29 15:07:11 2022, Tega, Summary, VAC, Opening of MC and ETM chambers 
Entry  Mon Apr 11 11:00:30 2022, Jancarlo, Update, VAC, C1VAC Reboot and Nitrogen tanks 
Entry  Tue Apr 12 09:05:21 2022, Jordan, Update, VAC, New Pressure Gauge Install/Pump Spool Vent 6x
    Reply  Wed Apr 13 12:50:07 2022, Tega, Update, VAC, New Pressure Gauge Install/Pump Spool Vent VAC_FRG_UPGRADE.png
Entry  Thu Apr 14 09:04:30 2022, Jordan, Update, VAC, RGA Volume RGA Scans 40mRGA_Overlay.pdfRGAVolume_4_12_22.PNG
Entry  Thu Apr 21 11:31:35 2022, JC, Update, VAC, Gauges P3/P4 IMG_0560.jpegIMG_0561.jpeg
    Reply  Thu Apr 21 16:36:56 2022, Tega, Update, VAC, cleanup work for vacuum git repo 
Entry  Fri Apr 22 14:14:33 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement IMG_0572.jpegIMG_0573.jpeg
Entry  Fri Apr 29 08:34:40 2022, JC, Update, VAC, RGA Pump Down Screen_Shot_2022-04-29_at_8.46.53_AM.png
    Reply  Mon May 2 10:00:34 2022, Jordan, Update, VAC, TP3 Forepump tip seal replacement 
    Reply  Tue May 3 13:18:47 2022, JC, Update, VAC, RGA Pump Down 
Entry  Fri May 20 12:42:23 2022, Tega, Update, VAC, Door installation on the end stations 
    Reply  Tue May 24 10:37:09 2022, Tega, Update, VAC, added FRG channels to slow channel ini file 