40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 324 of 330  Not logged in ELOG logo
   +  Reply  Thu May 13 05:06:43 2010, rana, Update, 40m Upgrading, 216 MHz resonance in the POY11 PD killed 
Entry  Fri Jan 12 20:35:34 2018, Udit Khandelwal, Summary, General, 2018/01/12 Summary 
   +  Reply  Wed Mar 30 16:40:24 2016, ericq, Update, LSC, 2016 vs 2010 2016_vs_2010.png
   +  Reply  Mon Mar 17 10:50:58 2014, steve, Update, safety, 2014 annual crane certification 2014craneCert.jpg
Entry  Fri May 6 10:20:00 2011, steve, Summary, SAFETY, 2011 safety audit sa2011done1.pdfP1070448.JPG
Entry  Fri May 22 01:27:14 2009, pete, Update, SUS, 200 days of MC3 side  mc3_side_200days.png
Entry  Fri Jun 20 01:38:55 2008, rana, Update, PEM, 20 day Weather test.png
Entry  Wed Jan 14 02:11:07 2015, rana, Summary, Treasure, 2-loop Algebra Loopology FSSloop.pdfFSSloop.png
Entry  Thu Nov 11 00:11:39 2021, Koji, Summary, SUS, 2" to 3" sleeve issue 6x
Entry  Wed Aug 25 08:53:33 2021, Jordan, Update, SUS, 2" Adapter Ring for SOS Arrived 8/24/21 20210824_152259.jpg20210824_152259.jpg20210824_152308.jpg
Entry  Wed Sep 29 09:36:26 2021, Jordan, Update, SUS, 2" Adapter Ring Parts for SOS Arrived 9/28/21 20210929_092418.jpg
Entry  Mon Aug 11 00:58:31 2008, rana, Update, PEM, 2 years of temperature trend Untitled.png
   +  Reply  Mon Aug 11 09:39:29 2008, rana, Update, PEM, 2 years of temperature trend 
Entry  Wed Nov 2 10:41:47 2011, steve, Update, General, 2 spare heliax at the LSC rack 
Entry  Wed Sep 29 16:56:36 2010, yuta, Update, VAC, 2 doors opened 
Entry  Wed Mar 31 16:55:05 2010, josephb, Update, Computers, 2 computers from Alex and Rolf brought to 40m 
Entry  Wed Mar 5 11:33:10 2014, Koji, Summary, LSC, 2 arm ALS->LSC transition - road map 
Entry  Fri Jun 22 02:21:57 2012, Jenne, Update, Green Locking, 2 arm ALS - Success!!!! P6210140.AVIspeedy_gonzales-5257.jpg
   +  Reply  Fri Jun 22 03:37:42 2012, Koji, Update, Green Locking, 2 arm ALS - Success!!!! 
   +  Reply  Fri Jun 22 10:52:18 2012, yuta, Update, Green Locking, 2 arm ALS - Success!!!! 
Entry  Mon Jul 26 20:30:35 2010, Jenne, Update, SUS, 2 Tip Tilts suspended and balanced 
Entry  Fri Feb 5 14:31:46 2010, Jenne, Update, SUS, 2 SOS towers assembled DSC_1156.JPG
Entry  Fri Jun 17 00:17:26 2011, rana, Configuration, Electronics, 2 RFPDs sent to LLO P1070895.JPG
Entry  Tue Mar 3 11:39:50 2009, Osamu, DAQ, Computers, 2 PCs in Martian 
Entry  Fri Sep 14 01:18:51 2012, rana, Update, COC, 2 Layout Changes 
   +  Reply  Mon Sep 17 18:04:01 2012, Steve, Update, COC, 2 Layout Changes IMG_1635.JPG
Entry  Sat Nov 20 02:25:30 2010, yuta, Update, CDS, 2 LOCKINs for suspension models LockinRoll.png
Entry  Wed Jul 28 18:24:57 2010, Jenne, Update, Green Locking, 2 Green Periscopes have mirrors, aligned 
   +  Reply  Thu Feb 21 19:55:46 2008, rana, Update, Electronics, 2 BNC Cables, 1 Tee 
Entry  Thu Oct 25 21:02:34 2012, Den, Update, PEM, 1x7 dc power DSC_4779.JPG
Entry  Tue Dec 6 02:57:44 2011, kiwamu, Update, Green Locking, 1st trial of handing off YarmALS.png
Entry  Mon Apr 29 18:53:03 2013, Jenne, Update, Electronics, 1pps timing fiber to OMC rack may be bent 
Entry  Sun Jun 29 18:58:43 2008, rana, Summary, Computers, 1e20 is too big for AWG and/or IOVME 
Entry  Tue Nov 3 12:47:01 2009, Koji, Configuration, CDS, 1Y9 Rack configuration update 
Entry  Mon Sep 15 14:00:52 2008, josephb, Configuration, Computers, 1Y9 Hub and C1asc 
   +  Reply  Fri Aug 16 16:40:04 2019, gautam, Update, CDS, 1Y3 work newLook1Y3.JPGIMG_7803.JPGc1lsc_crashed.png
Entry  Tue May 3 10:59:31 2011, josephb, Update, CDS, 1Y2 binary output adapter board now powered 
   +  Reply  Sat May 14 14:50:21 2011, Koji, Update, LSC, 1Y2 5V Blown Fuse found -> Fixed 1Y2_5V_Fuse.JPG
   +  Reply  Mon Nov 8 10:13:52 2021, Paco, Summary, BHD, 1Y1 rack work; Sorensens removed 
   +  Reply  Mon Nov 8 13:13:00 2021, Koji, Summary, BHD, 1Y1 rack work; Sorensens removed 40m_BHD.png
   +  Reply  Mon Nov 8 15:29:05 2021, Paco, Summary, BHD, 1Y1 rack work; New power for cameras 
   +  Reply  Mon Jan 3 16:46:41 2022, Paco, Update, BHD, 1Y1 rack work for SR2, PR2, PR3 
   +  Reply  Tue Nov 2 16:42:00 2021, Paco, Summary, BHD, 1Y1 rack work 
   +  Reply  Thu Nov 4 15:03:43 2021, Koji, Summary, BHD, 1Y1 rack work 
Entry  Fri Oct 29 14:39:37 2021, Anchal, Summary, BHD, 1Y1 cleared. IY3 ready for C1SUS2 I/O and FE. RemovedStuff.jpeg1Y1.jpeg1Y3.jpeg
   +  Reply  Mon Jan 3 12:05:08 2022, Paco, Update, BHD, 1Y0 rack work for LO2 AS1 AS4 
Entry  Tue Dec 14 19:29:42 2021, Paco, Update, BHD, 1Y0 rack work for LO1 
   +  Reply  Tue Nov 9 19:02:47 2021, Anchal, Summary, BHD, 1Y0 Populated and 1Y1,1Y0 powered 
   +  Reply  Thu Nov 24 01:28:09 2011, kiwamu, Update, General, 1X8 sorensen came back 
   +  Reply  Fri May 3 12:48:40 2019, gautam, Update, SUS, 1X4/1X5 cable admin D38CC485-1EB6-4B34-9EB1-2CB1E809A21A.jpeg
ELOG V3.1.3-