40m QIL Cryo_Lab CTN SUS_Lab TCS_Lab OMC_Lab CRIME_Lab FEA ENG_Labs OptContFac Mariner WBEEShop
  40m Log, Page 324 of 346  Not logged in ELOG logo
Entry  Fri Jul 15 17:44:37 2016, Aakash, Summary, General, Acromag Setup | SURF2016 
Entry  Mon Aug 1 18:50:29 2016, Aakash, Update, General, Acromag Setup | SURF2016 7x
Entry  Wed Aug 3 15:35:19 2016, Aakash, Update, General, Acromag Setup | SURF2016 
    Reply  Wed Aug 3 16:34:59 2016, Lydia, Update, General, Acromag Setup | SURF2016 
Entry  Wed Sep 7 18:00:47 2016, Lydia, Update, General, Acromag Progress 
    Reply  Thu Sep 22 20:18:27 2016, Lydia, Update, General, Acromag Progress 
    Reply  Wed Oct 12 18:09:25 2016, Lydia, Update, General, Acromag Progress 
Entry  Fri Nov 18 00:25:08 2016, Johannes, Omnistructure, 40m upgrading, Acromag Chassis Development acromag_bareboard.PNGXT_digital_340px_0.jpg
    Reply  Tue Nov 22 13:55:32 2016, Johannes, Omnistructure, 40m upgrading, Acromag Chassis acroplan.pdf
    Reply  Wed Dec 14 19:16:57 2016, Lydia, Update, CDS, Acromag Binary I/O testing 
Entry  Wed Dec 12 11:49:05 2012, Ayaka, Update, LSC, Acoustic noise in POX and AS error signal POX_noise4.pdfAScontXARM_acoustic.pdf
Entry  Tue Nov 13 21:05:22 2012, Ayaka, Update, WienerFiltering, Acoustic noise cancellation with MC 9x
Entry  Thu Aug 25 19:03:56 2016, Praful, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Thu Sep 1 15:28:01 2016, rana, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Thu Sep 1 17:25:02 2016, Praful, Update, Electronics, Acoustic Tab and Amp Suspension 
    Reply  Mon Nov 14 19:15:57 2016, Johannes, Update, General, Achievable armloss measurement accuracy 
    Reply  Tue Nov 15 20:35:19 2016, Johannes, Update, General, Achievable armloss measurement accuracy 
    Reply  Thu Nov 17 21:54:11 2016, Johannes, Update, General, Achievable armloss measurement accuracy 
Entry  Wed May 15 17:17:05 2013, Jamie, Summary, CDS, Accounting of ADC/DAC channel availability 
    Reply  Wed May 15 19:32:04 2013, rana, Summary, CDS, Accounting of ADC/DAC channel availability 
    Reply  Wed May 15 22:47:11 2013, Jamie, Summary, CDS, Accounting of ADC/DAC channel availability 
    Reply  Wed Nov 27 16:29:21 2013, Jenne, Update, CDS, Accidentally turned off SUS IO chassis 
Entry  Tue Aug 12 21:38:19 2008, John, Update, LSC, Accidental higher order mode resonances in the arms HOMresonances.pngHOMarms2.m
Entry  Tue Aug 23 16:23:33 2011, Jenne, Update, VAC, Access connector in place 
Entry  Tue Jun 23 23:14:36 2009, Clara, Configuration, PEM, Accelerometers relocated 
Entry  Fri Oct 9 17:41:04 2009, Jenne, Update, PEM, Accelerometers relocated 
    Reply  Sun Oct 11 04:12:44 2009, rana, Update, PEM, Accelerometers relocated Untitled.png
Entry  Wed Jul 1 16:16:46 2015, Ignacio, Update, General, Accelerometers reinstalled for future huddle test 9x
    Reply  Mon Jun 15 16:55:39 2015, ericq, Update, PEM, Accelerometers installed MC2.jpgMC1.jpgmc2accspectra.png
    Reply  Wed Jun 17 15:31:50 2015, ericq, Update, PEM, Accelerometers fully installed IMCcoherence_Jun172015.xml.zipIMCcoherence.png
Entry  Wed Dec 5 23:19:03 2007, Andrey, Configuration, PEM, Accelerometers are turned on 7x
Entry  Fri Nov 30 20:17:26 2007, Andrey, Configuration, PEM, Accelerometers and alum.plates for them Scheme_Aluminum_Piece-inches.pdf
Entry  Tue Aug 19 14:25:38 2008, Sharon, Update, PEM, Accelerometer's calibration - update acccalibafter.pngacccalibbefore.png
Entry  Mon Aug 25 17:45:34 2008, rana, josephb, rob, HowTo, PEM, Accelerometer range Screenshot-4.png
Entry  Thu Aug 23 21:53:18 2012, Yaakov, Update, PEM, Accelerometer location 
Entry  Wed Aug 4 01:44:56 2010, Koji, Configuration, PEM, Accelerometer located on and below the PSL table IMG_2675.jpgIMG_2678.jpgIMG_2682.jpg
    Reply  Tue Aug 10 22:40:55 2010, Koji, Summary, PEM, Accelerometer located on and below the PSL table PEM_100809.pdf
Entry  Thu Sep 4 18:02:34 2008, rana, josephb, Configuration, PEM, Accelerometer gains increased by 10 acc.png
Entry  Tue Jul 15 11:47:56 2008, Jenne, DAQ, PEM, Accelerometer channels in ASS Adapt MEDM screen 
Entry  Tue Mar 11 23:14:01 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements Acc.pdf
    Reply  Wed Mar 12 00:36:52 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements finished.pdf
    Reply  Wed Mar 12 00:40:35 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements mc2048-128.pdf
    Reply  Wed Mar 12 00:47:26 2008, rana, Configuration, PEM, Accelerometer and Seismometer movements Screenshot.png
Entry  Mon Jan 28 19:35:55 2008, rana, Summary, PEM, Accelerometer and Seismometer Coherences Acc.pdf
Entry  Fri Feb 22 02:51:20 2008, Andrey, Update, PEM, Accelerometer ITMX seems to be broken Accelerom-EYMX-Feb22.jpgAccelerom-ITMX-Feb22.jpg
Entry  Wed Apr 28 16:15:02 2010, Kevin, Update, PSL, Accelerometer Calibration 
Entry  Wed Jul 29 17:51:56 2015, Ignacio, Update, PEM, Accelerators moved back to MC1 and MC2 FullSizeRender.jpgFullSizeRender_2.jpg
Entry  Thu May 6 18:25:20 2010, Jenne, Update, PEM, Acc power supply turned on 
Entry  Wed Aug 3 01:30:04 2011, Jenne, Update, LSC, Absolute length of Xarm and Yarm measured 
Entry  Wed Nov 5 12:41:36 2008, Alberto, Update, LSC, Absolute Length and g-factor measurements conclusions 2008-11-04_file_02-05.pngHOM_resonances_Xarm.pngHOM_resonances_Yarm.png
ELOG V3.1.3-